Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Stope Filling with Thickened Classified Flotation Tailings (8ea60644-b41a-4846-93fc-367236e8ddfb)

    Stope filling practice on the Great Boulder Mine was described in -a paper published in Aus.I.M.M., Proceedings No. 137, in 1945. When the paper was presented the process had emerged from the experime

    Jan 1, 1948

  • AUSIMM
    Stope Optimisation Tools for Selection of Optimum Cut-Off Grade in Underground Mine Design

    By B Hall

    In feasibility studies the choice of optimum cut-off grade is typically based on an evaluation of tonnage grade curves and manual design of stopes at one or two cut-off grades. In the industry these s

    Jan 1, 2009

  • AUSIMM
    Stope Performance at Olympic Dam Mine

    By M J. Pascoe

    The performance of 460 stope surfaces at WMC ResourcesÆ Olympic Dam Operation (ODO) has been used to investigate the confidence that can be placed in the Stability Graph Method for design of stope dim

    Jan 1, 2005

  • AUSIMM
    Stope Performance in Challenging Ground Conditions: Observed Versus Predicted - A Case Study

    Throughout the study phases (scoping, prefeasibility and feasibility) of new mining projects one is forced to work with and make predictions based upon limited date obtained from diamond and reverse c

    Nov 25, 2010

  • AUSIMM
    Stope Stability at the Big Gossan Skarn Deposit, Papua, Indonesia

    By G de Jong, W Sunyoto, K Sari, P Silalahi

    "An EXTENDED ABSTRACT is available for download. A full-length paper was not prepared for this presentation. The Big Gossan mine is operated by PT Freeport Indonesia and is one of the largest stope-an

    Mar 18, 2015

  • AUSIMM
    Stope-Survey Practice at Mount Lyell

    By Coulter L. J

    THE method of stope surveying as practised at the Mount Lyell Company's mines has been evolved out of the exigencies created by special conditions. It presents some novel features, and has proved

    Jan 1, 1915

  • AUSIMM
    Storage and Time - A Paradigm for Aquifer Pressure Management Beneath Open Cut Mines

    By S Yuen, T Rana, S Khan

    Many open pit mines require dewatering or need aquifer depressurisation systems to manage mine water inflow and/or mine floor stability. In many instances these mining operations impact on regional gr

    Jan 1, 2009

  • AUSIMM
    Storys Creek Remediation Program

    By J Miedecke

    A metalliferous mine has operated at Storys Creek from the 1890s to 1979. Storys Creek drains from a pristine catchment and National Park and remains as the most degraded stream from historic mining i

    Jan 1, 2003

  • AUSIMM
    Stowing of Underground Mines as an Ecological and Safety Problem Solution

    By M Vavro, V Slivka, J èterba

    In the course of the last ten years the development of the mining industry in the Czech Republic has been influenced by the pushing through of economic and ecological criteria. Due to this coal mining

    Jan 1, 2003

  • AUSIMM
    Strain-dependent Stiffness of the Weathered Melbourne Formation

    By Z Terzic, M Schult, D Chu, S Macklin

    The East West Link road tunnels are proposed to provide a connection between the CityLink toll road and the Eastern Freeway north of the Melbourne CBD. The alignment passes from Moonee Ponds valley be

    Sep 17, 2014

  • AUSIMM
    Strata Control Considerations for Improved Mine Roadway and Panel Driveage Rates

    By Fabjanczyk MW, Nemcik JA, Matthews SM

    The major strata control considerations which affect the optimisation of roadway driveage in highly stressed strata is the performance of reinforcement placed and the extent of stress induced roc

    Jan 1, 1988

  • AUSIMM
    Strata Mechanics of Pillar Extraction Goaf Edges

    By Chaturvedula V. K

    Pillar extraction carried out using various methods (split and lift, Wongawilli and Old Ben) involves the formation of narrow fenders (commonly 7 m of coal) formed by driving "splits" for lifting

    Jan 1, 1992

  • AUSIMM
    Strata Movement Associated WIH Longwall Mining

    By Hughson B

    A multi-wire borehole instrumentation system was used to monitor strata movement caused by a retreating longwall face at the Ellalong Colliery, situated in the Lower Hunter Valley in New South Wal

    Jan 1, 1987

  • AUSIMM
    Strata Movement Due to Shallow Longwall Mining and the Effect on Ground Permeability

    By Buizen M

    An investigation into the mechanics of sub-surface deformation caused by caving of the extracted area behind retreating longwall faces has been completed by the Subsidence Engineering Section of the N

    Jan 1, 1990

  • AUSIMM
    Strata Support Interaction on a Powered Support Longwall Face Under a Massive Dolerite Sill - A Study

    By Ghose AK

    Design and selection of support systems for longwall faces call for in-depth know- ledge of strata mechanics and in particular of strata-support interactions. The paper presents the results of fiel

    Jan 1, 1992

  • AUSIMM
    Strategic and Tactical Geometallurgy – a Systematic Process to Add and Sustain Resource Value

    By N McKay, J Vann, W Ware, P Hodkiewicz, C Morley

    "Geometallurgy is now recognised within the mining industry as an approach that can both maximise value and reduce the risks associated with resource development. The process of spatial ore variabilit

    Jun 15, 2016

  • AUSIMM
    Strategic Aspects of Latrobe Valley Coal Resource Utilisation

    By Henderson N, Schaap H

    In large companies with mining operations spread over multiple sites, it is essential that consistency between sites is maintained in preparing and classifying resource and reserve estimates. The en

    Jan 1, 1990

  • AUSIMM
    Strategic Decision-making in Mining – Business Optimisation Using Flexible Evaluation Models

    By B E. Hall, D B. Kahler

    "'Optimisation' has become a catchcry among many mining companies looking to tell the market how mining businesses will be improved and shareholder value increased. Consequently, the term 'optimisatio

    Mar 8, 2016

  • AUSIMM
    Strategic Development of the Stage 5 Pit at Kidston

    The originally estimated mine life at Kidston (starting 1984) was 12 years. Through a continuing process of re-evaluation and improvement in the operation and by expanding the geological knowledge i

    Jan 1, 1994

  • AUSIMM
    Strategic Diversity in Smelting

    To secure a sustainable competitive advantage some smelters may need strategies based on flexibility in feed and product ranges depending on immediate future projections of profitability. This paper

    Jan 1, 1996