Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Application of Lerchs-Grossman Pit Optimization to the Design of Open Pit Mines

    By Whittle J

    Definition of the optimum open pit, whether an intermediate phase or final design, will be sensitive to many factors. The most basic will include geological and mining constraints, mining and proc

    Jan 1, 1986

  • AUSIMM
    Biodegradation of manganese dioxide tailings

    By Madgwick J. C

    Microaerobic biodegradation oflow-grade manganese dioxide slurry tailings was demonstrated in enrichment cultures treated with dilute molasses at 30°C and pH 5·8. Supplementary nitrogenous n

    Jan 1, 1986

  • AUSIMM
    Current Extraction Technology for Free Milling Auriferous Ores

    By D M. Menne

    This paper is intended to give a general review of current gold extraction technology for free-milling or non-refractory auriferous ores. Fundamental process concepts and some of the differences betwe

    Jan 1, 1986

  • AUSIMM
    The distribution of gold between bullion, speiss, and slag during zinc-lead smelting

    By Holliday R, Floyd JM

    A laboratory investigation was carried out to determine the distribution of gold between the products of lead-zinc concentrate smelting in the Imperial Smelting Furnace (ISF). Bullion, speiss and

    Jan 1, 1986

  • AUSIMM
    Education needs for Research and Industrial Practice in Geological Engineering

    Geological. engineering is a field of engineering practice concerned with design and construction of excavations and structures in soil and rock masses. The role of geological engineering in mining

    Jan 1, 1986

  • AUSIMM
    The Measurement of Explosive Product Gas Penetration

    By Armstrong ME

    The gas bubble energy generated by an explosive plays a major part. in the fragmentation, muckpile movement and damage produced. Previously, the interaction between gas pressure and the rock has b

    Jan 1, 1986

  • AUSIMM
    The Compilation and Presentation of The Description of Operations with Particular Reference to Cyanide Operations

    The Queensland Department of Mines believes it is in the best interests of the gold mining industry to reduce and control the environmental impacts from gold mining since that is the community expecta

    Jan 1, 1986

  • AUSIMM
    Overburden stripping using large slushers

    By Lumley G, Rowlands D

    The overburden slusher (OS) is proposed as a stripping tool that is expected to find application in overburden stripping operations including open cut coal and oil shale mines. OS is expected to comba

    Jan 1, 1986

  • AUSIMM
    The Weipa Kaolin Project

    Comalco Limited has recently completed construction of a $50 million kaolin plant at the site of its bauxite mining and industrial minerals operation at Weipa. The plant will produce 100,000 tonne

    Jan 1, 1986

  • AUSIMM
    Dewatering Investigation at Koolan Island

    BHP Minerals Ltd operates an open cut iron ore mining operation on Koolan Island, off the coast north of Derby in the Kimberley region of Western Australia. The mine comprises a number of pits, the

    Jan 1, 1986

  • AUSIMM
    Tecnical note-lineament guidelines to mine development: a continuing case history, northeastern Queensland

    LANDSAT imagery has renewed interest in linear features first recognised by E. S. Hills in a physiographic model of Australia. Certain of these lineaments are aligned with structures which control min

    Jan 1, 1986

  • AUSIMM
    Education and Research for the Mineral Industry

    The success of any industry depends on the planned integration of the policies and resources of the key components of the Australian economic and political structure - government, industry managemen

    Jan 1, 1986

  • AUSIMM
    Copper mineralization in the Patawarta Diapir, northern Flinders Ranges, South Australia

    By Both R. A, Daily B

    The Patawarta Diapir, located in the northern Flinders Ranges (South Australia), has intruded into late Proterozoic Wilpena Group sedimentary rocks. The diapir contains disrupted blocks of a wide vari

    Jan 1, 1986

  • AUSIMM
    Experiences in Developing Applied Mining Research Contracts

    The Australian Mineral Industry's growth in the last two decades is directly related to the skill and experience of its consultants in mining, metallurgy, geology, finance, management, marketing

    Jan 1, 1986

  • AUSIMM
    Contributed discussion to "The minimisation of surface subsidence by design of mine workings"

    Holla has given a good background to the various methods of subsidence control in the coalfields around Sydney.The present writer notes that in many cases, especially with wide longwall panels, there

    Jan 1, 1986

  • AUSIMM
    Mining at Depth - the Major Issues

    By Lloyd F, Arnold D. A, Hagan T. O

    This paper investigates the problems that are encountered in mining at extreme depths. It looks into the rock mechanic aspects, especially the high stress levels that will occur, and the hazard of

    Jan 1, 1986

  • AUSIMM
    Combining physical experimentation and mathematical modelling techniques in the simulation of induration and direct reduction processes

    By Wright JK, Turner RE, Batterham RJ, Morrison AL

    Simulation can play an important role in the design, optimization and control of complete industrial processes, the most appropriate method depending on the particular application. Most commonly,

    Jan 1, 1986

  • AUSIMM
    New Technologies for efficient utilization of coal in the iron and steel industry

    By Brotzmann K, Turner RE, Philp DK, Rusden RC

    New approaches in the last decade have led to the supplemental use of raw coal as a direct energy source in several iron and steelmaking processes. The dependence on more expensive coke and electr

    Jan 1, 1986

  • AUSIMM
    The Geology of the Kidston Gold Mine

    By Lewis RW, Tullemans FJ, Gallo JB

    Gold mineralization at Kidston occurs in a semicontinuous zone near the margin of a large, late Palaeozoic breccia pipe. The pipe is ovoid in plan, funnel-shaped in cross section and straddles a c

    Jan 1, 1986

  • AUSIMM
    Nuclear Techniques for On-Line Analysis in Mineral and Coal Processing

    By Holmes RJ, Sowerby BD, Watt JS

    Major improvements have taken place in mineral and coal processing in the last decade. The development of nuclear on-line sensors that continuously analyse the material being processed has led to

    Jan 1, 1986