Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Resource Requirements for a Lignite to Liquid Fuels Industry
By D F. S Natusch, R J. Hooper
Recent lignite investigations indicate their potential as a strategic long-term fuel resource. This potential however would be determined not only by lignite quantity and quality, but also by economic
Jan 1, 1983
-
Proper Tyre Management Reduces Tyre Costs (8cc3f990-94b6-4b55-8abb-8c65d8f8d45b)
By Gordon DM
Tyres account for 25-30 per cent of the operating costs of large capacity haul units as used in open-cut mines.Tyre operating costs can be substantially reduced and often contained in real terms by ap
Jan 1, 1983
-
Analysis of Gases and Airs from Collieries
The Coke Ovens Laboratory at Australian Iron & Steel, Port Kembla has been involved in the analysis of seam gases and mine airs for approximately twenty (20) years. This period has seen many develo
Jan 1, 1983
-
Lead Flotation Practice And Control At North Broken Hill Limited
By Sandy W
This paper examines the effects of a significant number of plant alterations and modifications to the lead flotation circuit during the past five years. Metallurgical effort is directed largely at
Jan 1, 1983
-
The Stabilisation Of Tailings Dumps Using Vegetative Cover At ZC/NBHC
By Rogers J. F, Bird A. C
The establishment of vegetation for dust control on tailings dams at The Zinc Corporation, Limited and New Broken Hill Consolidated Limited (ZC/NBHC) is outlined. The evolution of practices and te
Jan 1, 1983
-
The Characteristics And Interpretation Of Regional Magnetic And Gravity Fields In The Broken Hill District
One of the most praninent Bouguer anomaly features in the Broken Hill District is the long wavelength high of 10-15 ngals above background which forms a northeast trending, oval zone sane 15 km by
Jan 1, 1983
-
Industrial Relations Planning for Development Projects
By Tyler MA
If the record of maj or proj ects in Australia is taken into account, it is apparent, the proper planning of an industrial relations strategy for many such projects has been ill considered by proj
Jan 1, 1983
-
Ventilation of Single Entry Developments at Ellalong Colliery
By Wallman D
Since 1981 two single entry roadways have been driven at Ellalong Colliery for a total distance of 1 030 metres. They were driven at a height of 1.73 metres within the 3.7 metres thick Greta Seam
Jan 1, 1983
-
Role of Computers in th Queensland Department of Mines
By Golledge P
Access to the vast volume of exploration data available in the Geological Survey Division of the Department of Mines would be impossible without the use of modern computing methods. These data are
Jan 1, 1983
-
Exploration and Assessment of the Central Otago Lignite Deposits
Three large deposits of good quality lignite were located and delineated in the Central Otago region between October 1978 and July 1979. The program was initiated and funded by Mines Division of the M
Jan 1, 1983
-
Winding Rope Practice At The Zinc Corporation, Limited And New Broken Hill Consolidated Limited
The importance of good winding rope practice is stressed. Details of the ropes used for various duties in the four shafts of The Zinc Corporation, Limited (ZC) and New Broken Hill Consolidated Lim
Jan 1, 1983
-
Key Parameter Reporting System at Mt Newman Mining
By Fink ST
Management requires up-to-date information on the activities of an enterprise in order to maintain control and to assist in decision-making and planning. In today's environment it is essential
Jan 1, 1983
-
Cost of Capital for Resource Projects
By Seshold P
The cost of capital is the rate at which a project's cash flow should be discounted to obtain the Net Present Value. The cost of capital is a weighted average of both debt and equity funds of
Jan 1, 1983
-
Real-Time Data Acquisition and Control Projects at the UDC Research and Development Laboratory
By Fiedler VA, Threadingham GM, Leckenby DF, Clarkson CJ
The Utah Development Company Research and Development Laboratory has embarked upon a programme of optimisation of the company's coal preparation plants. This goal is being accomplished in a t
Jan 1, 1983
-
Mine Planning for Coal Project Development
By Westcott PC
The development of a coal project must pass through a number of phases, taking it from a preliminary evaluation through to detailed mine planning. For each phase the cost of data acquisition and a
Jan 1, 1983
-
A Modified Cable Bolt System For The Support Of Underground Openings
By Worotnicki G, Tillmann V. H
Past experience with fully bonded cable dowels placed as a means of reinforcement in highly stressed crop pillars at the New Broken Hill Consolidated Limited (NBHC) mine indicated such support was
Jan 1, 1983
-
A Geotechnical Data Management System for Surface and Underground Mines
By Brant BA, Lewandowski R, Trendle M, Haughton D
There is a vast amount of geotechnical data, which can be obtained during exploration programs at new and existing mine sites. Additional information on the performance of the in-situ rock mass can
Jan 1, 1983
-
Computer Program for Planning of Mine-Ventilation Systems
Today the application of computer programs for planning of mine-ventilation and for safety- analysis of ventilation systems is widespread practice in German mining. The computer program for network c
Jan 1, 1983
-
The Depositional Setting of Ohai Coals as Inferred from Coal Petrography
Upper Cretaceous and Eocene coal measures of the Ohai Coalfield are stratigraphically complex, and coal seam geometry and quality are influenced by washouts and partings resulting from accumulation in
Jan 1, 1983
-
A One-Sided View of the Development of Computer-Assisted Mapping and Modeling
By Johnson M, Gaudin A
With the advent of Computer aided mapping and surface modelling techniques Geologists and Engineers have had to become familiar with the capabilities and limitations of these systems to effectively
Jan 1, 1983