Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Use of Computers in the Analysis and Steady State Optimization of Metallurgical Concentrations
By Weller KR
Computer programs are described which help the metallurgist to process sample data from a plant survey; to carry out simple mass balance calculations; to present the results of circuit and equipmen
Jan 1, 1983
-
New Data for Trace Element Concentrations in Australian Bituminous Coals
By Mills J. C
Concentration ranges are presented for 15 trace elements not previously reported in Australian bituminous coals. The results were obtained by instrumental neutron activation analysis, which has suffic
Jan 1, 1983
-
Computerised Deposit Modelling, Volumetrics, and Production Scheduling
By Davey CJ
An integrated computer software system has been developed by Fluor Australia for modelling, mine planning and production scheduling of single or multi-strata deposits. Modelling of both quantitative
Jan 1, 1983
-
The Rise And Fall Of Mt Keast-Locating Feed For Current Retreatment Operations From A Study Of Processing History At The Zinc Corporation, Limited
In 1976, The Zinc Corporation Limited Broken Hill set up a plant to re-process a hill of tailing (Mt. Keast) from the original treatment operations. With the likely disappearance of this source of
Jan 1, 1983
-
The Bucket Wheel Excavator at Goonyella-A Case Study
Utah's Blackwater mine began operations in 1967. The four CQCA mines controlled by Utah followed over the period 1971 to 1979. Project feasibility studies for all these were based on open cut
Jan 1, 1983
-
Mineralogical, Petrographical and Geochemical Investigations of Outbursting in Australian Coal Mines
By Hart G. H
In tectonically disturbed zones within coal seams, decreases in the amount of kaolinite in the cellular structure of inertiniterich coal are accompanied by increasing kaolinite contents in fractures w
Jan 1, 1983
-
Use and Abuse of Geological Data for Mine Project Development
This paper sets out to discuss some of the more common forms of geological data abuse in project development. The paper illustrates various types of abuse and the reasons behind that misuse of dat
Jan 1, 1983
-
A 2000 Channel Mine-Wide Data Acquisition System
By Smith I. K
A Data Acquisition System with a capacity to monitor 2000 analog instruments has been installed at the mines operated by the Zinc Lorporation, Limited and New broken hill Consolidated Limited (ZC/
Jan 1, 1983
-
A Process for the Recovery of Cobalt from Speiss
By Fennell B
A process for the recovery of cobalt from a speiss produced at Sulphide Corporation is presented. The speiss is leached in oxygenated sulphuric acid to dissolve the metallic iron at a pH of around 4.
Jan 1, 1983
-
The Development And Application Of techniques For The Assessment And Control Of Longhole Open Stope Stability At ZC/NBHC
The causes and impact of stability problems associated with longhole open stoping (LHOS) at The Zinc Corporation, Limited (ZC) and New Broken Hill Consolidated Limited (NBHC) are discussed and LHOS
Jan 1, 1983
-
Network Analysis of Pre Development Regulatory Procedures
By Hughes DC
Coal development in New South Wales can involve a complex series of government approvals, a requirement that results from the coincidence of many development sites with environmentally sensitive ar
Jan 1, 1983
-
Case Study . . . Industrial Relations in Resource Development
Industrial relations on Australian and New Zealand resource projects can be volatile. Therefore investors have become increasingly aware over the years that sound industrial relations during const
Jan 1, 1983
-
The Environmental Component in Mining Project Development
Programmes of environmental investigations to identify and minimise impacts and satisfy government and community requirements have become an integral and rate determining component in the planning
Jan 1, 1983
-
Designing for Maximum Production from Trucks and Loaders
In many mining operations, the truck and loader equipment represents the bulk of the invested capital and the majority of the mine operating cost. The profitability of these mines is therefore crit
Jan 1, 1983
-
Mining and the Environmental Protection Legislation in N.S.W.
In September 1980 the N.S.W. Environ- mental Planning and Assessment Act was gazetted. This legislation created a new arena of government involvement in the procedure for obtaining approval to open
Jan 1, 1983
-
Australian Iron & Steel Pty Ltd Experience with Ladle Injection
A pilot steel ladle injection facility designed to assist in the production of high quality steels suitable for use in pipelines has been built and commissioned at the Basic Oxygen Steelmaking (BOS) p
Jan 1, 1983
-
Use of Computerised Management Systems for the Blair Athol Coal mine Project
As Project Managers for the Blair Athol Coal Mine Project, CMPS selected a number of computer systems to assist in project control. The areas where computers were used were: 1) Planning & Schedulin
Jan 1, 1983
-
Broken Hill At The Cross Roads
A review is given of the development of the author's ideas on the relationship of ore occurrence to regional dislocations in the earth's crust, presently identifiable in particular areas
Jan 1, 1983
-
Case Studies of International Copper Development Projects
By Pollack B
Four different major international copper projects are discussed. Three have recently come on line, and one is now being constructed. Each of the projects has encountered unique problems during th
Jan 1, 1983
-
Preassembly Concepts to Reduce Project Capital Costs
By Kruse JW, Kjar AR
Recently there has been increased recognition o'f the cost savings that can be achieved by the greater use of offsite preassembly for the construction of industrial plants. Preassembly is a me
Jan 1, 1983