Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • AUSIMM
    Targeting dilatancy in upstream construction

    By A Simmons, J Chan, A Li, Q Gu, D M. Brett

    The paper presents an example of field density achievements using thin layer deposition and solar drying and compares this with compaction data from laboratory testing and field trials of mechanical d

    Jul 1, 2021

  • AUSIMM
    On the flipside: why cost cutting is out; revenue maximization is in and value is always king

    By H Allday

    The mining industry’s attention has shifted over the last decade with the recovery from the downturn resulting in greater development of innovation and new work methods in a bid to remain competitive

    Mar 15, 2021

  • AUSIMM
    The interaction between slag and MgO refractory at conditions relevant to nickel laterite ore smelting

    By A D. Pradana, D R. Pradana, Y H. Putra, Z Zulhan, T Hidayat

    The high temperature processing of nickel laterite ore is currently dominated by the Rotary Kiln- Electric Furnace (RKEF) technology. The ratio of SiO2/MgO (S/M) in the ore is one of the critical para

    Aug 21, 2024

  • AUSIMM
    Mineral project risk and orebody knowledge – quantifying the value of drilling using decoupled net present value analysis

    By D Espinoza, I Rees, J Pocoe, P Collier

    P Collier, I Rees, J Pocoe and D Espinoza

    Mar 22, 2022

  • AUSIMM
    Regional scale structural influence on the Ernest Henry orebody below current mining levels

    By E Philippa, B Miller

    Material characterisation, ore sequencing and process capability are commonly regarded as the key parameters to consider in designing and operating an effective pit to plant supply chain. Therefore, a

    Mar 22, 2022

  • AUSIMM
    Slag volume effects on direct-reduced iron (DRI)-based electric furnace steelmaking

    By Q Zhuo, P C. Pistorius, M N. Al-Harbi

    A likely increasingly important pathway for future low-carbon ironmaking and steelmaking is the combination of gas-based direct reduction with electric furnace steelmaking (DRI-EAF route), or with ele

    Aug 21, 2024

  • AUSIMM
    Analysis on composition and physico-chemical property change of PbO-bearing slag in Pb smelting

    By G Cao, Y R. Cui, J X. Zhao, H P. Gui, G H. Wang, Z M. Wang, M M. Ren, B Li

    Pyro-metallurgy is still the main process for lead production and a lot of lead direct smelting processes have been developed in recent years. All the processes will experience two steps in common. Th

    Aug 21, 2024

  • AUSIMM
    Machine learning to estimate fines content of tailings using gamma cone penetration testing

    By S McGregor, J Sharp, I Entezari, T Boulter

    The piezocone penetration test (CPTu) is one of the primary screening tools used by the mining industry to evaluate whether tailings are susceptible to liquefaction (static or cyclic). Liquefaction an

    Jul 1, 2021

  • AUSIMM
    A case study: how being ‘aware of now’ is making work safer at Telfer underground

    By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle

    Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper

    Mar 15, 2021

  • AUSIMM
    Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine

    By J Say, M Hawtin, L Carlon, P Cann

    Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an

    Mar 15, 2021

  • AUSIMM
    Challenges facing non-ferrous metal production

    By P Taskinen, D Lindberg

    The increase in metals demand in the electrifying globe means significant growth in the smelting of copper, nickel, zinc, and lead, produced from primary sulfide sources or using sulfide mattes as the

    Aug 21, 2024

  • AUSIMM
    Trends in real‐time instrumentation and monitoring techniques for tailings dams

    By L Clarkson, D Williams, P Redcliffe, F van der Wal

    This research presents a snapshot and insight into the trends, patterns, and common considerations identified in the current standing of real-time tailings dam monitoring practice. Based primarily on

    Jul 1, 2021

  • AUSIMM
    Effect of oxygen on the interfacial phenomena and metal recovery rate in recycling process

    By Y-B Kang, J H. Park, J Park

    In order to understand the effect of oxygen injection into the molten metal on the valuable metals (VM) recovery and interfacial phenomena, several high-temperature experiments were conducted using a

    Aug 21, 2024

  • AUSIMM
    An analysis of productivity in sublevel caving mines

    By G R. Power

    A useful way to assess potential productivity of SLC mines is by quantifying tonnes/drawpoint/day to be extracted from the mine. However limited industry information has been published to help mines b

    Mar 15, 2021

  • AUSIMM
    Slag chemistry on the Moon

    By M G. Shaw, M A. Rhamdhani, S P. Singh, A R. Duffy, B Eisenbart, A K. Shukla, G A. Brooks

    The field of astrometallurgy is a growing area of study. Metal production on the Moon is likely to begin in less than a decade as major space agencies such as NASA (National Aeronautics and Space Admi

    Aug 21, 2024

  • AUSIMM
    A review of risk management for tailings dams; learnings from other high hazard industries

    By M Erskine, R Mills

    This paper approaches tailings dam risk management from the perspective of how other high hazard industries approach the management of their catastrophic event risks, with the aim to provide recommend

    Jul 1, 2021

  • AUSIMM
    Jaguar Raisebore design using LiDAR for back analysis

    By R P. Varden

    This paper looks at the design of the Bentayga raisebore with subsequent back analysis using a LiDAR survey. A search for LiDAR raisebore assessment publications shows little work has been done on thi

    Mar 15, 2021

  • AUSIMM
    Ore quality measurement and control using GEOSCAN-M PGNAA real time elemental analysis

    By H Kurth

    Oyu Tolgoi copper and gold mine in the southern Mongolia holds mineral resources that make it one of the largest known copper and gold deposits in the world. The project is operating an open pit mine

    Mar 22, 2022

  • AUSIMM
    Evaluation of thermal conductivities of molten SiO2-Al2O3-CaO slags

    By M Zhu, G Tranell, J You, K Tang, X Ma

    The thermal conductivity of slag is critical for the efficiency of high temperature metallurgical processes such as the smelting reduction of ferroalloys, the ladle refining and the continuous casting

    Aug 21, 2024