Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns

    By M Spleit

    A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr

    Nov 24, 2014

  • AUSIMM
    Globally Optimising Open Pit and Underground Mining Operations under Geological Uncertainty

    By R Dimitrakopoulos, K Kawahata, L Montiel

    A method that optimises mining complexes that are comprised of multiple processing destinations, open pits and underground operations is presented. Mining, blending, processing and transportation deci

    Nov 24, 2014

  • AUSIMM
    Is Truck Queuing Productive?

    By P Malkin, S Thomas, P M. Stone, D Kostyuk

    In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource

    Nov 24, 2014

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing

    By E Lima, D Gregory, C Faria, A Lapworth

    Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all

    Nov 24, 2014

  • AUSIMM
    Approaches to the Simulation of Compositional Data – A Nickel-Laterite Comparative Case Study

    By K G. van den Boogaart, U Mueller

    "An accurate prediction of benefit for some types of ore may require not just the ore grade, but a whole compositional characterisation of the estimates; that is, its full mineral composition includin

    Nov 24, 2014

  • AUSIMM
    Mineral Supply Chain Optimisation under Uncertainty Using Approximate Dynamic Programming

    By R Dimitrakopoulos, C Paduraru

    The optimisation of mine complexes and related value chains is a challenging problem due to the simultaneous presence of a highly-dimensional decision space, integer decision variables, non-linear con

    Nov 24, 2014

  • AUSIMM
    Capital Expenditure Modelling for Strategic Mine Scheduling

    By L Blackwell

    Strategic mine scheduling is an industry best practice for increasing the long-term value of mining operations and supply chains. The application of optimisation technology such as mixed integer linea

    Nov 24, 2014

  • AUSIMM
    Modelling Open Pit and Underground Production Scheduling in Concert

    By B King

    A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti

    Nov 24, 2014

  • AUSIMM
    Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to Closure

    By J McCluskey, N Barros

    "Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c

    Nov 24, 2014

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Simulation Optimisation of Mine Operational Plans

    By H Askari-Nasab, E Torkamani, M M. Badiozamani, S P. Upadhyay, M Tabesh

    "Decision-making in mining is a challenging task. Optimal decisions regarding shovel and truck allocations, aligned with the optimal short-term production schedules, are crucial in keeping the operati

    Nov 24, 2014

  • AUSIMM
    Stochastic Production Scheduling – Solution through Langrangian Relaxation with the Branch-and-cut Algorithm

    By S Chatterjee

    The production scheduling of an open pit mine determines the optimal extraction sequencing that significantly impacts a mine’s life as well as net present value. The optimisation of production schedul

    Nov 24, 2014

  • AUSIMM
    On the Joint Multipoint Simulation of Discrete and Continuous Geometallurgical Parameters

    By K G. van den Boogaart, M Lehmann, U Mueller

    Geometallurgical parameters are descriptions of the mineralogy and microstructure of the ore determining its mineralogical and microstructural characteristics. From a conditional geostatistical simula

    Nov 24, 2014

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    Predicting Mill Ore Feed Variability Using Integrated Geotechnical/Geometallurgical Models

    By M Astorga, J Jackson, J Gaunt

    The Ban Houayxai mine (BHX) is a relatively low-grade, low-cost, open pit gold-silver deposit in Laos operated by Phu Bia Mining, a subsidiary of PanAust. The ore production rate at BHX is 4.5 Mt/a, w

    Nov 24, 2014

  • AUSIMM
    Analysis of Geotechnical and Support Parameters on Coalmine Entry Stability Using the Strength Reduction Method

    By G S. Esterhuizen, M M. Murphy, T S. Bajpayee

    The strength reduction method (SRM) has been implemented in the FLAC3D finite difference software and applied to coalmine entry support evaluations. The FLAC3D numerical models have been calibrated ag

    Nov 5, 2014

  • AUSIMM
    Laboratory Corrosion Tests of Frictional Rock Bolts

    By D W. Airey

    Frictional rock bolts are widely used because of their low cost. However, they have a thin wall section that makes them prone to corrosion, and they cannot be relied on to provide long-term ground sup

    Nov 5, 2014

  • AUSIMM
    A Non-destructive Testing Method for Measuring Bolt Condition

    By B Jones, M Chappell

    Installing ground support correctly is not an easy task, whether lack of operator training, poor ground conditions or underperforming equipment. Confirming the quality of installation can help with pl

    Nov 5, 2014

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014