Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Directional Blasting Rock Cutting Technology
By W Z. Liu, Q Q. Shi, H T. Yang, X L. Zhang
In order to improve the cutting blasting effect of dimension stone mining, the water coupling directional cutting blasting technology was put forward. Based on the test apparatus and special charge co
Aug 24, 2015
-
Physical and Technical Evaluation of Possibility Using Low-density Explosives in Smooth Blasting
By I Y. Maslov, S A. Gorinov
It was demonstrated that the stable propagation of the explosive process is possible in low-density emulsion explosives (EEs) obtained through mixing of emulsion with a significant amount of expanded
Aug 24, 2015
-
Evaluating the Effects of Non-coaxial Charges for Contour Blasting
By J Seccatore, F Golin, E Munaretti, M Cardu, J C. Koppe, J Bettencourt
Contour blasting is commonly performed by employing linear charges decoupled from the boreholes. This method is common in surface and underground excavations, either for civil or mining purposes. To a
Aug 24, 2015
-
Prediction of Rock Fragmentation Using a Gamma-based Blast Fragmentation Distribution Model
By H Mansouri, M A. Ebrahimi Farsangi, F Faramarzi
A blast fragmentation model is developed based on the gamma function to describe the run-of-mine fragmentation distribution. The model presented is aimed to benefit from simplicity in application and
Aug 24, 2015
-
An Automated System for Flyrock and Fume Monitoring of Blasts
By C K. McKenzie, P Popov, B E. Papillon, I Kharitonenko
Flyrock produced by blasts in surface mining and quarrying is a major hazard that can result in serious injuries or property damage. This paper presents a fully integrated and automated approach for r
Aug 24, 2015
-
Discrete Element Modelling of Blast Fragmentation of a Mortar Cylinder
By D Johansson, C Yi
Blasting techniques are widely used to fragment rock masses into smaller pieces. Numerical modelling is an efficient method employed by many researchers in the blasting field. It is difficult for a co
Aug 24, 2015
-
Measured and Modelled Response of a Multistory, Urban Structure to High-frequency Blasting Excitation
By C Dowding, C Aimone-Martin, P Abeel
This paper presents measurement and analysis of the dynamic response of a five-storey building to very high frequency excitation (>100 Hz) from blasting vibrations originating from a contiguous exc
Aug 24, 2015
-
Underground Stope Drill and Blast Designs Optimisation Program
By C Preston, T Williams, D Roy
The easiest way to mine valuable orebodies is through the use of explosives and well-planned blasting layouts that produce fragmentation profiles designed specifically for conveyance equipment in unde
Aug 24, 2015
-
Ranges of Validity of Some Distribution Functions for Blast-fragmented Rock
By J A. Sanchidrián
The general ranges of validity of some distribution functions are assessed from their behaviour with 119 sets of fragmentation data from bench blasting obtained by sieving. The emphasis is on determin
Aug 24, 2015
-
Dynamic Displacements from a Blast-triggered Seismic Event
By D P. Blair
Various analysis techniques are used to determine the nature of a large seismic event that was triggered by a mass blast in an underground mine. This event was recorded by surface accelerometer arrays
Aug 24, 2015
-
Characterising Rock Mass Properties for Fragmentation Modelling
By A Scott, I Onederra
A great deal of technical and research effort has been applied to the development of models to predict fragmentation from rock blasting. A number of quite useful empirical or engineering models are cu
Aug 24, 2015
-
A Novel Blasting Technique to Create Drawbells and Eliminate the Undercut Level in Block Cave Mining
By A Tawadrous, D S. Preece
Cave mining is of interest to the mining community as it offers a chance to extract large, deep orebodies with low operating costs and high production rates. It allows for extracting large low-grade o
Aug 24, 2015
-
The Relationship between Blasting Parameters and Muck Pile Configuration
By D Van Doorselaere
The purpose of blasting during mining is to produce a muck pile that can be efficiently loaded and transported. There is an increasing awareness of the variation in muck pile characteristics and its e
Aug 24, 2015
-
Muck Pile Shaping for Draglines and Dozers at Surface Coalmines
By M Nagarajan, S Esen
This paper presents three case studies from three surface coalmines. The first case study is from a coalmine where a dragline operates in 60 m wide and 1 km long strips. Typical overburden height rang
Aug 24, 2015
-
The Median versus the Mean Fragment Size and Other Issues with the Kuz-Ram Model
By F Ouchterlony
Soviet precursors to Cunningham’s Kuz-Ram model from 1983 are described. They are rooted in the mean fragment size and Rosin-Rammler (RR) fits to sieving data and rely on approximations. Three version
Aug 24, 2015
-
A Holistic Approach to Managing Blast Outcomes
By D Genge, E Martin, T Goswami, M Rothery
Rio Tinto’s Hunter Valley Operations is a large open pit coalmine situated in the heart of the Hunter Valley in Australia. The Riverview West Pit has faced increasing production challenges in recent t
Aug 24, 2015
-
Geological Modelling and Bench Face Survey to Improve Blasting Fragmentation
By E Gabriel, J C. Koppe, A Gomes and P Crispim, R Schaarsdmit, I Pablos
Drill and blast (D&B) is one of the most important production operations in open pit mining. The resulting fragmentation of the D&B reflects in the downstream unit operation. Good fragmentatio
Aug 24, 2015
-
Improving Drive Stability through Efficient Development Blasting Design and Practices
By P Klaric
Drive stability is critical in block/panel cave mining. The production levels of these mines are required to remain operational for the entire life-of-mine which can be in excess of 30 years. It is th
Aug 24, 2015
-
Establishing the Design Parameters of a Control Blast for Long-term Stability of the Hang Wall at Rampura Agucha Mine
By R Shrimali, P Rajmeny, L Shekhawat, A Joshi
Rampura Agucha open pit mine has successfully been excavated to a depth of 320 m, incorporating multistage working. The key to success is the implementation of presplitting as control blast measures a
Aug 24, 2015
-
Stope Blast Vibration Analysis at Dugald River Underground Mine
By J Player, R de Vries, E Villaescusa, R Hassell
Concerns regarding the uncertainty of stope dilution at MMG Dugald River Underground Mine led to a trial stoping program to acquire full-scale comprehensive geotechnical information and to test the va
Aug 24, 2015