Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Comminution Circuit Design Considerations (49th Annual Canadian Mineral Processors Operators Conference©, Ottawa, Ontario, January 17-19, 2017)

    By S. Rivard

    "This paper demonstrates the selection of grinding circuit technology for a number of recent projects including discussion of the key drivers and the role of energy efficiency. Decreasing head grades

    Jan 1, 2017

  • CIM
    Comminution Energy Efficiency – Understanding the Next Steps

    By Brandt Porter, Lawrence K. Nordell, Alexander Potapor

    "Improving comminution efficiencies with better machine geometries and motions, improved nip angles, rock movement control, and voids regulation among rocks are some of the next steps to better machin

    Jan 1, 2016

  • CIM
    Comminution, Flotation and Gravity Separations

    By James A. Finch

    "I offer a personal view of what the next 30 years holds for mineral processing. Re-stating that mineral processing will remain a vibrant industry in raw material production, growth opportunities in w

    Jan 1, 1998

  • CIM
    Commissioning and Early Operation of the Con Mine Pressure Oxidation Plant

    By Paul D. Young, Michael J. Allan

    "The Con Mine has been producing gold continuously since 1938. In 1990 laboratory and pilot plant investigations began into the use of pressure oxidation for treatment of an arsenic trioxide waste pro

    Jan 1, 1994

  • CIM
    Commissioning and Operating Experience with Gekko’s Gold Ore Treatment Plants

    By Tim Hughes, Steve Gannon, Jennifer Abols

    "In the past year, two very innovative gold ore processing plants have been designed, built and commissioned by Gekko Systems Pty Ltd. The first plant in Vietnam utilizes conventional crushing and bal

    Jan 1, 2007

  • CIM
    Commissioning and Operation of Milling Circuit at Santarita Nickel Operation

    The Santa Rita mine is located in north eastern part of Bahia in Brazil and is owned and operated by Mirabela Mineração do Brasil Ltda. Typical SABC circuit was designed as the preferred option for th

    Jan 1, 2012

  • CIM
    Commissioning and Operation of Milling Circuit at Santarita Nickel Operation (Outotec (USA) Inc.)

    By E. Faria

    "The Santa Rita mine is located in north eastern part of Bahia in Brazil and is owned and operated by Mirabela Mineração do Brasil Ltda. Typical SABC circuit was designed as the preferred option for t

    Jan 1, 2012

  • CIM
    Commissioning and Operation of the Ag Mills at the Aitik Expansion Project

    By S. Markstrom

    The Boliden AITIK copper mine is located 100 kilometres north of the Arctic Circle in northern Sweden. A pre-feasibility study was conducted in 2005 with the aim of increasing the capacity of the exis

    Jan 1, 2012

  • CIM
    Commissioning and Operation of the AG Mills at the Aitik Expansion Project (aaf8f334-a1ef-48c8-b4f0-2d5b88480a9a)

    By S. Markstrom

    The Boliden AITIK copper mine is located 100 kilometres north of the Arctic Circle in northern Sweden. A pre-feasibility study was conducted in 2005 with the aim of increasing the capacity of the exis

    Jan 1, 2012

  • CIM
    Commissioning and Operation of the Copper Cliff Weak Acid Treatment Plant

    By T. Xue

    429 As part of Inco's S02 abatement project for its Sudbury operations, a weak acid treatment plant (W ATP) was commissioned at the Copper Cliff smelter in August of 2004 to treat the weak acid

    Jan 1, 2006

  • CIM
    Commissioning And Ramp Up Of The Hpgr Circuit at Newmont Boddington Gold

    By Steven Hart

    In September 2009, Newmont began the commissioning of a 3 stage crushing and milling circuit at its Boddington Gold Operation in Western Australia. The Boddington ore has been recognized as one of the

    Jan 1, 2012

  • CIM
    Commissioning and Ramp Up of the HPGR Circuit at Newmont Boddington Gold (Newmont Boddington Gold’s Processing Facilities)

    By Brendan Parker, Tyron Rees, Steven Hart, Abba Manesh, Ian Mcgaffin

    "In September 2009, Newmont began the commissioning of a 3 stage crushing and milling circuit at its Boddington Gold Operation in Western Australia. The Boddington ore has been recognized as one of th

    Jan 1, 2012

  • CIM
    Commissioning and Testing of Thickener Feed De-Aeration Cyclones at the Xstrata Nickel Raglan Operation

    By Colin Hardie, Simon Pelletier, Rakan Rhabani, Guy Comeau

    "In order to improve the nickel concentrate thickener operation at Raglan Mine, two pulp deaeration cyclones were installed. These units obtained from Outotec Pty Ltd, also called the FrothBuster®, ha

    Jan 1, 2008

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber plant was recently completed at an existing facility, in order to treat the sulphur dioxide off-gas emitted from rotary kilns. Proper planning of the diffe

    Jan 1, 2016

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls (48th Annual Canadian Mineral Processors Operators Conference)

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber (CDS) plant was recently completed at an existing facility in Québec, Canada. The CDS plant treats the sulphur dioxide off-gas emitted from rotary kilns i

    Jan 1, 2016

  • CIM
    Commissioning of a Mini REE SX Pilot Plant at SGS Minerals – Lakefield Site

    By Niels Verbaan, Ernesto Bourricaudy, Ronald Molnar, James Brown, Sunil Jayasekera

    "SGS Minerals commissioned an internal R&D program to develop in-house expertise to design, set up and operate REE separation pilot campaigns at its Lakefield, Canada site. A team approach was used th

    Jan 1, 2016

  • CIM
    Commissioning of the BIOX and ASTER™ Processes at the Runruno Gold Project

    By M. Savella

    The Runruno Gold Project is located on the island of Luzon, approximately 200 km north of Manilla in the Philippines. The mine is a surface mine operation and use the proven BIOX® and carbon in leach

    Jan 1, 2017

  • CIM
    Commissioning of the Ekati Diamond Mine

    By Mike Rylatt

    "The BHP Diamonds Inc. and Blackwater Group (Dia Met Minerals Ltd., Charles Fipke and Stewart Blusson) joint venture began production at Canada=s first diamond mine during the last quarter of 1998.Con

    Jan 1, 1999

  • CIM
    Commissioning of the Intensive Cyanidation Plant to Treat Concentrate from the Selene Mine at the Ares Mill

    By Tad Crowie, Victor Delgado, Nick Katsikaros, Tim Hughes

    "A number of silver producers have identified a need for a system to recover silver and gold from base metal flotation concentrates on site rather than sending the concentrate to third party smelters

    Jan 1, 2010

  • CIM
    Committee Bay Project ? Gold and Diamonds in Nunavut

    By Dean McDonald

    The Committee Bay Greenstone Belt extends over 300km and is one of the largest unexplored greenstone belts in North America with excellent gold and diamond potential. Committee Bay Resources Limited h

    May 1, 2004