Design and Construction of Tailings Ponds and Reclamation Facilities - Case Histories (ClM Bulletin, October 1978)
By J. D. Jones
The geographic occurrence of economic mineral deposits presents a variety of problems in modern tailings disposal operations. This paper presents case histories in several sectors of the mineral indus
Jan 1, 1978
-
Design and Construction of the Backfilled Pit Cover System at Whistle Mine, Canada: A Case Study
By Brian K. Ayres
Inco Limited, Ontario Division is currently in the process of decommissioning the Whistle Mine site located near Sudbury, Ontario, Canada. The most significant component of site decommissioning involv
Apr 1, 2005
-
Design and Construction of the Gilon Railway Tunnels in Karstic Rock
By M. Wittke
"In the course of the extension of the railway network in Israel, currently the two 4.6 km long tubes of the Gilon Tunnels on the line from Akko to Carmiel are being constructed. The tunnels run throu
Jan 1, 2015
-
Design and construction of the Montana Tunnels tailings disposal facility
By K. J. Brouwer, J. P. Haile
"Construction of the first stage of the tailings disposal facility for the Montana Tunnels Project was completed in October 1986. The project is located 37 km south of Helena, Montana, and involves mi
Jan 1, 1988
-
Design and control of large hydraulic backfill pours
By John D. Smith, Robert J. Mitchell
"There is a world-wide trend toward underground bulk mining methods employing hydraulically placed backfill. This trend is recent and therefore there is little in the literature to assist an operator
Jan 1, 1982
-
Design and Development of an Automated Uranium Pellet Stacking System
By B. S. Riess
A novel design for an automated uranium pellet stacking system is presented. This system is designed as a drop-in solution to the current production line to enhance the fuel pellet stacking process. T
Aug 1, 2010
-
Design and Development of an LHD for Narrow-Reef Mining
By Patrick F. R. Murphy
The mechanization of platinum group metal (PGM) underground reef mining in South Africa has posed a challenge to mining engineers for several decades. This is primarily due to the shallow dip angles a
May 1, 2003
-
Design and Field Implementation of Alternate Stable Mining Geometries for Set-Up Rooms in Longwall Mining
By Yoginder P. Chugh
This paper discusses an ongoing field study in southern Illinois (USA) that focuses on: 1) Identifying mechanisms of instability in the set-up rooms (SR) and their T-junctions with headgate and tailga
Aug 1, 2013
-
Design and Implementation of a Brownfield Sag Pre-Crush Circuit
By G. Castillo, G. Thies, C. Bissue
"Newmont’s Phoenix mine began gold production in 2006 and has since experienced difficulties in reaching design throughput due to variability in ore hardness. In 2010, a debottlenecking study was cond
Jan 1, 2013
-
Design and implementation of a process control system for column flotation
By A. LA. Salama, D. B. Hyma
"The Western Research Centre (WRC) of CANMET located in Devon, Alberta, is a modern research facility offering services ranging from fundamental research to pilot plant investigations. Recently, a 0.
Jan 1, 1993
-
Design and Implementation of a Supplemental Atomizing Spray System for Dust Control in Deep Cut Continuous Mining
By J. Dilbeck, J. K. Ratliff, T. Petrov, Z. Brown
"In efforts to improve dust control during deep cut continuous mining a supplemental atomizing spray system, mounted on 14CM15 continuous miner, has been designed and successfully implemented in a U.S
Jan 1, 2019
-
Design and Implementation of Advanced Automatic Control Strategy Based on Dynamic Models for High Capacity SAG Mill
By Rodrigo Toro, Ivan Yutronic N
"The Copper Concentrator Plant of Compañía Minera Doña Inés de Collahuasi (CMDIC) is composed of three grinding lines, the third one being the largest. Due to the capacity feature of the third line, s
Jan 1, 2010
-
Design and Implementation of Modified Mo Addition to EAF at Uddeholm AB, Sweden
By M. Nzotta, L. Teng, S. Seetharaman, A. Chychko
The objective of the present work is to optimize the EAF practice towards Mo alloying with maximum retention of the alloying element in molten steel. During Mo additions, there were significant losses
Jan 1, 2011
-
Design and Maintenance of Platework and Vessels in Mines
By A. J. Paul Laprairie
The process for which it is to be used is too often the only consideration in the design of a vessel. A de-sign allowing for practical manufacture and erection, as well as for proper maintenance, can
Jan 1, 1963
-
Design and Materials Selection of Autoclaves and Auxiliary Equipment
By P. Cheung, J. Gulyas, R. Clary
Over the past 50 years, the use of autoclaves in the metallurgical industry has evolved from final metal recovery (hydrogen reduction) and purification (sulphide precipitate oxidation) to treating who
Jan 1, 2004
-
Design and Operation of a Future Mill
By D. E. Pickett, J. A. Roland Faucher
"INTRODUCTIONMineral processing is undergoing growth and change at a rapid rate. The modern flotation process was discovered only in the mid-twenties, and uranium leaching in the mid-fifties. The grow
Jan 1, 1979
-
Design and Operation of the Key Lake Uranium Mill
By M. Neven, R. A. Steane, E. Lam
"The Key Lake uranium mill is located in Northern Saskatchewan. It treats a high grade, complex uranium and metal sulphide ore. The plant and process are in many respects unique, because commercial tr
Jan 1, 1986
-
Design and operation of thickened tailings disposal system at Les Mines Selbaie
By K. R. Wood, G. W. McDonald
"The tailings disposal system at Les Mines Selbaie includes dewatering of tailings in a high-capacity thickener, followed by point discharge of the thickened solids to form a stable conical pile. Tail
Jan 1, 1986
-
Design and Optimisation of a New Hydrometallurgical Processing Route for Copper Recycling Using Process Simulation
By A. de Ville d’Avray, G. Guezennec, P. Wavrer, E. Braak
The aim of the European CEReS project was to develop an innovative copper recycling route based on the coprocessing of coal production waste by bioleaching and printed circuit boards (PCBs) from Waste
Jan 1, 2019
-
Design and Permitting of a New Uranium Mill Facility in the United States
By Kimberly Morrison
Strategically located within the Uravan Mineral Belt District of western Colorado, the Piñon Ridge Project is the first new uranium mill being proposed for construction in the United States in over 25
Aug 1, 2010