    Design of Solution Heat Treatments for Aerospace Alloys

    By J. Beddoes

    Many high strength aerospace alloys undergo solution heat treatment (SHT) and aging to develop precipitate strengthening. Most simply, SHT involves an isothermal hold in a single phase region followed

    Jan 1, 2010

  • CIM
    Design of Special Flotation Equipment for High-Purify Quartz Sand

    By Feng Tianran, Lu Shijie, Shen Zhengchang, Han Zhibin, Tan Ming

    "As a kind of non-metallic material, high-purify quartz sand has been widely used in many fields. Flotation is a popular way to process quartz sand. But it is in difficult position for flotation to ge

    Jan 1, 2016

  • CIM
    Design of steel arch supports for gate roadways

    By Pierre Choquet

    "The whole work carried out both in situ and in laboratory by a research group of the West German collieries is presented. This work has led to a design method of steel arch supports for gate roadways

    Jan 1, 1986

  • CIM
    Design of Teach Pendant for Robot Glazing System

    By Seungyeol Lee

    Currently, a new construction method using a robotic system is widely spreading in construction sites. This study is related to the design of glazing robot?s teach pendant which can improve convenienc

    Aug 1, 2013

  • CIM
    Design of the AGA Brasil Refractory Gold Pressure Oxidation Plant

    By I. Masters, K. Buban, M. Faris, M. Antonio, M. Collins

    "AngloGold Ashanti Brasil, with assistance from Sherritt International Corporation, has recently commissioned a new autoclave for the pressure oxidation of refractory gold feeds at their Corrego do Sí

    Jan 1, 2012

  • CIM
    Design of the jointed roof in stratified rock based on the voussoir beam mechanism

    By P. Mottahed, J. Ran

    Mining practice and research have shown that the jointed roof in stratified rock behaves like a voussoir beam structure with strength greater than that determined by the continuous beam theory. Previo

    Jan 1, 1995

  • CIM
    Design of the Kubaka Grinding Circuit Using SPI and Bond

    By Graham Holmes, John Starkey

    "The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball

    Jan 1, 2001

  • CIM
    Design of the New Lihir Gold Pressure Oxidation Autoclave

    By M. J. Collins, B. Parekh, A. Hasenbank, B. Hewitt

    Newcrest Mining Limited, originally as Lihir Gold, has operated a pressure oxidation plant for the recovery of gold from refractory ore since 1997. The mine and gold plant are located on Lihir Island

    Jan 1, 2011

  • CIM
    Design of the Pierina Waste Dump

    By P. Mark. Hawley

    Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa

    May 1, 2002

  • CIM
    Design of the Pierina waste dump

    By R. Sharon, P. M. Hawley, X. Ochoa

    "Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa

    Jan 1, 2003

  • CIM
    Design Spans ? Underhand Cut and Fill Mining

    By Rimas Pakalnis

    This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r

    Apr 1, 2005

  • CIM
    Design Specifics of Hard-Rock Caverns for Hydrocarbon Storage; 50 Years of Feedback and Recent Developments

    By Nicolas Gatelier, Sophie Laurent, Thierry You

    Hard-rock caverns for hydrocarbon storage are a very particular type of underground facility controlled not only by local administrative and regulatory constraints that can be very specific, but also

    Jan 1, 2015

  • CIM
    Design techniques for sublevel caving layouts

    By D. A. Trotter, G. J. Goddard

    "This paper describes a method of deciding on various design parameters for a sublevel caving layout. Layout design curves are obtained from the output of a computer optimization program. The program

    Jan 1, 1981

  • CIM
    Design, Commissioning, and Operation of a Heavy Rare Earth Separation Pilot Plant

    By Jack Zhang, Yunguo Tang, Baodong Zhao

    "Rare earth elements (REEs) have numerous key applications in both traditional and advanced technologies. A shortage of some critical REEs is expected due to the discrepancy between the REE abundance

    Jan 1, 2017

  • CIM
    Design, Commissioning, Start-Up and Performance of Vale’s Long Harbour Stirred Media Detritor Ultrafine Grinding Circuit

    By Adam Moore, Ryan Gillespie, Jarrett Quinn, Audrey Walters, Peter Radziszewski

    "Vale Long Harbour Processing Plant (LHPP) was designed to process Voisey’s Bay nickel concentrate into finished nickel and associated copper and cobalt products. The plant includes a secondary grindi

    Jan 1, 2016

  • CIM
    Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, Zimbabwe

    By Peter Makuvise, Alain M. Bantshi

    "The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w

    Jan 1, 2017

  • CIM
    Design, Construction and Initial Operation of the Tailings System at Brenda Mines Ltd.

    By H. Tetu, F. Pells

    "The copper-molybdenum property of Brenda Mines Limited is located in the Okanagan district of British Columbia, approximately 25 miles west of Kelowna. The Okanagan Valley is a resort and fruit-growi

    Jan 1, 1971

  • CIM
    Design, Construction and Performance of PKC Dams on Northern Terrain

    By James W. Cassie

    The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros

    May 1, 2003

  • CIM
    Design, Construction, and Commissioning of Air Separation Units in Remote Locations

    By K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko

    In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located

    Jan 1, 2014

  • CIM
    Design, Construction, and Start-up of Stillwater Mining’s East Boulder Concentrator

    By P. Lefebvre, J. Sargent, K. Major, B. Darnton

    "Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin

    Jan 1, 2003