Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
 - Most Recent
 - Alphabetically
 
Sort by
- Relevance
 - Most Recent
 - Alphabetically
 
- 
                    
                Design of Teach Pendant for Robot Glazing SystemBy Seungyeol Lee
Currently, a new construction method using a robotic system is widely spreading in construction sites. This study is related to the design of glazing robot?s teach pendant which can improve convenienc
Aug 1, 2013
 - 
                    
                Design of the AGA Brasil Refractory Gold Pressure Oxidation PlantBy I. Masters, K. Buban, M. Faris, M. Antonio, M. Collins
"AngloGold Ashanti Brasil, with assistance from Sherritt International Corporation, has recently commissioned a new autoclave for the pressure oxidation of refractory gold feeds at their Corrego do Sí
Jan 1, 2012
 - 
                    
                Design of the jointed roof in stratified rock based on the voussoir beam mechanismBy P. Mottahed, J. Ran
Mining practice and research have shown that the jointed roof in stratified rock behaves like a voussoir beam structure with strength greater than that determined by the continuous beam theory. Previo
Jan 1, 1995
 - 
                    
                Design of the Kubaka Grinding Circuit Using SPI and BondBy Graham Holmes, John Starkey
"The Kinross Kubaka Project is a gold mine located in the Russian Far East. The grinding circuit, comprised of a 6.1 m diameter x 2.74 m long SAG mill and a 4.1 m diameter x 5.5 m long secondary ball
Jan 1, 2001
 - 
                    
                Design of the New Lihir Gold Pressure Oxidation AutoclaveBy M. J. Collins, B. Parekh, A. Hasenbank, B. Hewitt
Newcrest Mining Limited, originally as Lihir Gold, has operated a pressure oxidation plant for the recovery of gold from refractory ore since 1997. The mine and gold plant are located on Lihir Island
Jan 1, 2011
 - 
                    
                Design of the Pierina Waste DumpBy P. Mark. Hawley
Development of Barrick Gold?s Pierina Gold Mine in north-central Peru requires construction of a waste dump for disposal of non-ore grade materials stripped from the open pit to expose the ore. The wa
May 1, 2002
 - 
                    
                Design of the Pierina waste dumpBy R. Sharon, P. M. Hawley, X. Ochoa
"Development of Barrick Gold’s Pierina gold mine in north-central Peru requires construction of a waste dump for disposal of nonore grade materials stripped from the open pit to expose the ore. The wa
Jan 1, 2003
 - 
                    
                Design Spans ? Underhand Cut and Fill MiningBy Rimas Pakalnis
This paper describes a focus of work presently being conducted at the Rock Mechanics Research Group at the University of British Columbia. The underhand method under consolidated fill ensures a high r
Apr 1, 2005
 - 
                    
                Design Specifics of Hard-Rock Caverns for Hydrocarbon Storage; 50 Years of Feedback and Recent DevelopmentsBy Nicolas Gatelier, Sophie Laurent, Thierry You
Hard-rock caverns for hydrocarbon storage are a very particular type of underground facility controlled not only by local administrative and regulatory constraints that can be very specific, but also
Jan 1, 2015
 - 
                    
                Design techniques for sublevel caving layoutsBy D. A. Trotter, G. J. Goddard
"This paper describes a method of deciding on various design parameters for a sublevel caving layout. Layout design curves are obtained from the output of a computer optimization program. The program
Jan 1, 1981
 - 
                    
                Design, Commissioning, and Operation of a Heavy Rare Earth Separation Pilot PlantBy Jack Zhang, Yunguo Tang, Baodong Zhao
"Rare earth elements (REEs) have numerous key applications in both traditional and advanced technologies. A shortage of some critical REEs is expected due to the discrepancy between the REE abundance
Jan 1, 2017
 - 
                    
                Design, Commissioning, Start-Up and Performance of Vale’s Long Harbour Stirred Media Detritor Ultrafine Grinding CircuitBy Adam Moore, Ryan Gillespie, Jarrett Quinn, Audrey Walters, Peter Radziszewski
"Vale Long Harbour Processing Plant (LHPP) was designed to process Voisey’s Bay nickel concentrate into finished nickel and associated copper and cobalt products. The plant includes a secondary grindi
Jan 1, 2016
 - 
                    
                Design, Construction and Commissioning of Gold Tailings Plant at Mazowe Mine, ZimbabweBy Peter Makuvise, Alain M. Bantshi
"The Mazowe Gold Mine is managed by Metallon Gold (Zimbabwe) and is situated in the west-central part of the Harare greenstone belt. Orebodies here generally comprise shear zones which are in-filled w
Jan 1, 2017
 - 
                    
                Design, Construction and Initial Operation of the Tailings System at Brenda Mines Ltd.By H. Tetu, F. Pells
"The copper-molybdenum property of Brenda Mines Limited is located in the Okanagan district of British Columbia, approximately 25 miles west of Kelowna. The Okanagan Valley is a resort and fruit-growi
Jan 1, 1971
 - 
                    
                Design, Construction and Performance of PKC Dams on Northern TerrainBy James W. Cassie
The Snap Lake Diamond Project is located approximately 220 km northeast of Yellowknife, NT, Canada at an approximate latitude of 63?35?. The project location is within the zone of continuous permafros
May 1, 2003
 - 
                    
                Design, Construction, and Commissioning of Air Separation Units in Remote LocationsBy K. van Warmerdam, M. Pearson, C. Kember, D. McMullen, M. Thayer, C. Ugarenko
In July 2012, Hatch Ltd. and Air Products & Chemicals Inc. completed construction and commissioning of a 4000 tpd O2 cryogenic air separation unit (ASU) for Barrick Gold’s Pueblo Viejo Project located
Jan 1, 2014
 - 
                    
                Design, Construction, and Start-up of Stillwater Mining’s East Boulder ConcentratorBy P. Lefebvre, J. Sargent, K. Major, B. Darnton
"Stillwater Mining commenced mining operations at Nye, Montana in 1987 for the recovery of platinum and palladium. Exploration identified that the J-M Reef extended for 43 km. In 1998 Stillwater Minin
Jan 1, 2003
 - 
                    
                Design, development, and verfication of a Lovat 7.6-metre full-face tunnel-boring machineBy R. Lovat, J. A. Hunter
"The design, development, and verification of the Lovat 7.6metre diameter full-face tunnel-boring machine is reviewed. Programmatic and technical challenges are outlined with a review of the specifica
Jan 1, 1984
 - 
                    
                Design, Implementation, and Commissioning of the Gibraltar Development Plan 3By S. A. H Tyrrell, R. Rotzinger
"Taseko Mines Limited recommenced operation of the Gibraltar copper-molybdenum mine in 2004 and embarked on series of development projects to modernize the mine and increase throughput capacity. The G
Jan 1, 2014
 - 
                    
                Design, Start-up and Optimization of Pb & Zn Flotation Circuits Utilizing Ultra-Fine Grinding TechnologyBy Lyne Côté, Jose Adante
"The Caribou underground mine, 50 km west of Bathurst, the Restigouche open-pit mine, another 30 km west and the concentrator located at the Caribou mine site resumed operations in July 2007 after a n
Jan 1, 2009