    Impact of using selective collector bar rodding on the MHD stability of a 500 kA aluminium electrolysis cell

    By M. Dupuis

    It has been previously demonstrated [1,2] that using selective collector bar rodding has a big impact on the uniformity of the current density at the top surface of the cathode block and hence on the

    Jan 1, 2005

  • CIM
    Impact on Mill Design and Flotation Control of New Discoveries in the Relationship between Macro and Micro Grindability

    By J. H. Starkey

    Large differences between macro and micro grindability relationships have been discovered for mill design measurements using the patented SAGDesign(TM) test. Crushing, Rod and Ball Mill Wi tests, and

    Jan 1, 2009

  • CIM
    Impact-Induced Damage on Foliated Ore Pass Walls

    By K. Esmaieli

    ABSTRACT We conducted a series of numerical experiments to investigate the influence of rock mass foliation on impact-induced damage on ore pass walls. The 2D Particle Flow Code was used to simulate t

    Jan 1, 2014

  • CIM
    Impacts and Benefits Agreements: A Way towards Lasting Relationships between Aboriginal Peoples and the Mining Industry

    By Ann Bigué

    Outline of Presentation 1. Impacts and Benefits Agreements Defined 2. Elements that determine the content of an IBA: ? the nature of the project ? the identity of Aboriginal communities affected b

    May 1, 2004

  • CIM
    Implementation of a Flotation Expert Control System at the Raglan Mine

    By G. Couture

    "The Glencore Raglan mine Concentrator, located in Quebec’s Nunavik region, has been in operation since 1997. The nickel metallurgical plant was originally designed to process 100 tonnes per hour of o

    Jan 1, 2015

  • CIM
    Implementation of a Greenhouse Gas Reduction Roadmap for Mining and Metallurgy Companies

    By Julia Pflieger, Manfred Russ, Johannes Gediga

    This paper shall show an economic feasible approach to implement Greenhouse Gas (GHG) reduction measures into the mining and metallurgy industry. The goal to improve energy consumption is directly lin

    Jan 1, 2010

  • CIM
    Implementation of a Hybrid Brattice to Control Dust Dispersion in Underground Coal Mine Faces

    By J. C. Kurnia

    Presence of fine dust in air causes serious health hazard for mine operators resulting in such serious problems as coal workers? pneumoconiosis and silicosis. Major sources of dust appear of course al

    Aug 1, 2013

  • CIM
    Implementation of a Semi-Autogenous Grinding Circuit at the Brunswick Concentrator

    By Chris Larsen, Ian Orford, Mike Cooper

    "An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The autogenous grinding circuit replaced existing surface crushing plants, fine ore storage, rod and pri

    Jan 1, 2001

  • CIM
    Implementation of Advanced Control Strategies Using VentSim™ Control at San Julian Mine in Chihuahua, Mexico

    By Daniel Torres Espinoza, Jose Pinedo

    "Ventilation is a vital service in underground mines, required to provide fresh air to the work force and dilute diesel equipment gases (CO, NOx) and diesel particulate matters (DPM). At a Mexican pre

    Jan 1, 2019

  • CIM
    Implementation of Air Liquide Shrouded Injector (ALSI) Technology at the Thai Copper Industries Smelter

    By N. Wachgama, J. P. T. Kapusta, R. U. Pagador

    The Thai Copper Industries smelter (Thai Copper) is located some 200 km southeast of Bangkok near the MapTaPhut deep sea port in one of the industrial centres of Thailand. Although construction of the

    Jan 1, 2007

  • CIM
    Implementation of an Advanced Thickener Underflow Density Control at Loulo Gold Mine, Mali

    By D. Sagara, V. G. Makhado

    "A model based control strategy was implemented at Loulo Gold Mine in Mali, to stabilise the thickener underflow stream density. This stream acts as the feed to the leaching circuit. pH control of the

    Jan 1, 2017

  • CIM
    Implementation of APC at Freeport-Mcmoran’s (FMI) Morenci Metcalf Concentrator

    By A. Supomo, H. Resendiz, C. Burbidge

    "Freeport-McMoRan Inc. (FMI) commissioned the expansion of the Morenci Metcalf concentrator in 2014. The concentrator included many design and equipment innovations, including the first-of-its-kind Me

    Jan 1, 2019

  • CIM
    Implementation of Cyanidation by Size Class at Sleeping Giant Mill

    By Gilles Landry, Mohamed Ourriban, Pierre Pelletier, Ahmed Bouajila, Claude Gagnon

    "This paper summarizes the work carried out to develop and implement the gold cyanidation by size class (CSC) process, a novel concept aiming to reduce cyanide consumption.First, the authors will pres

    Jan 1, 2009

  • CIM
    Implementation of Magnetic Conditioning in Two Stage Sequential Cu-Zn Flotation Separation

    By Jodi Wilding, Barry Lurnsden

    The implementation of new technology to mineral separation operations requires rigorous testing to confirm the technology's technical and economic benefit. The Jaguar Mine owned by Jabiru Metals

    Jan 1, 2011

  • CIM
    Implementation of mining-induced seismic hazard maps at Creighton Mine for risk assessment of rockmass damage due to mining at depth

    By Pavel Vasak

    The Laurentian University Virtual Reality Laboratory (VRL) has provided a unique platform for the development and testing of novel seismic and microseismic data processing and visualization technology

    Oct 1, 2010

  • CIM
    Implementation of New Technology at Barrick Gold

    By N. M. Stubina, P. J. Lind

    Barrick Gold is in the process of building several new mines and implementing new processes at existing mines for which metallurgical technology is of key importance. The roles of the company's S

    Jan 1, 2011

  • CIM
    Implementation of Paste Backfill at the Williams Mine

    By Eric Konigsmann, Doug Spence, Scott Jones

    "The Williams Gold Mine is located in the Hemlo camp of Northwestern Ontario and is one of Canada’s largest gold producers with annual gold production of 400,000 ounces. The operation is owned and ope

    Jan 1, 2004

  • CIM
    Implementation of Rapid Elemental Analysis for Flotation Control at Eagle Mine

    By H. Staton, V. Suontaka, E. Sharifi

    "Flotation circuits are typically controlled using on-line elemental assays obtained from the slurry lines. In base metal applications, X-ray fluorescence (XRF) analyzers are the most common instrumen

    Jan 1, 2019

  • CIM
    Implementation of Safety Instrumented Systems in Pressure Oxidation Facilities

    By L. Gonzalez-Sardi, W. McCombe, M. Pearson

    Pressure oxidation is increasingly being used for processing refractory sulphide ores and concentrates because it offers highly effective base metal and precious metal extraction while minimizing elem

    Jan 1, 2014

  • CIM
    Implementation of Stage Grinding at the Brunswick Mine Concentrator

    By J. Andrew Cornier, Mike Cooper

    "Upon successful completion of the AG/SAG Mill project (Cooper et al., 2001) the Brunswick Mine concentrator was configured with single line processing through the AG/SAG mill, followed by two paralle