Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Ontario?s Experimental Plant for Resource Recovery

    By B. I. Boyko

    As part of the Ministry of the Environment's Resource Recovery Program, the Province of Ontario has constructed a $13 million "Experimental Plant for Resource Recovery" in Metropolitan Toronto. T

    Jan 1, 1978

  • CIM
    Opemiska Copper Mine

    By J. C. Folinsbee, D. R. Derry

    "The Property of Opemiska Copper Mines (Quebec) Ltd. is in Levy Township, Chibougamau district, west of Chibougamau and south of Opemiska Lake. The original find was made in 1929 by the late Leo Sprin

    Jan 1, 1949

  • CIM
    Open Access to Metallurgical Publications

    By R. T. Jones

    "Technical publications in the field of mining and metallurgy have existed for a long time. Recent developments in electronic publishing on websites make it possible to disseminate information more wi

    Jan 1, 2012

  • CIM
    Open Pit Drilling and Blasting at Craigmont Mines Limited

    By J M. Gibbs

    Craigmont Mines Limited mine 50,000 tons of ore and waste per day from the open pit at Merritt, British Columbia. An electric-powered "down-the-hole" drill, a diesel-powered rotary drill and two elect

    Jan 1, 1965

  • CIM
    Open Pit Mind Dewatering- Knob Lake

    The purpose of this paper is to present the methods used in ground water control and the considerations that affected the development of these techniques. Production at Knob Lake is currently proceedi

    Jan 1, 1965

  • CIM
    Open Pit Mine Dewatering= Knob Lake

    The purpose of this paper is to present the methods used in ground water control and the considerations that affected the development of these techniques. Production at Knob Lake is currently proceedi

    Jan 1, 1965

  • CIM
    Open Pit Mine Planning: A Practical Optimization and Evaluation Approach Under Uncertain Markets

    By Sabry A. Sabour

    Metal price is among the key variables in the open pit optimization and the economic evaluation process. The common approach to handle metal prices in open pit mine planning is to optimize the ultimat

    Aug 1, 2013

  • CIM
    Open Pit Mining of Golden Band Resources? EP Gold Deposit - Open Pit Mining of Golden Band Resources? EP Deposit Waddy Lake Saskatchewan Open Lake Saskatchewan

    By Charlie Harper

    Open Pit Mining of Golden Band Resources? EP Gold Deposit Golden Band Resources Inc. (GBN:TSX-V) is Saskatchewan's newest Gold Producer. Located in the La Ronge Gold Belt of northern Saskatch

    Nov 1, 2011

  • CIM
    Open Pit Production Planning using Controlled Pushbacks and Aggregates

    Open pit production planning is a procedure consisting of multiple stages. Although all the planning stages rely on the geostatistical block models, long- to short-term plans each require their approp

    Aug 1, 2013

  • CIM
    Open Pit Underground Transition Supported by Integer Linear Programming Modeling

    By Solar D. Andrés

    Several large open pit mines are facing the challenge to design and plan an underground transition to sustain the long term future of their operations. The desired underground method is Block Cave sin

    Oct 1, 2009

  • CIM
    Open Stope Exposure Time and Stope Dilution

    Unplanned open stope hanging wall dilution is a significant cost for many open stope mining operations. Significant advances in empirical and analytical approaches for estimating stope dilution have b

    May 1, 2003

  • CIM
    Open systems standards for computing in the mining industry

    By L. K. Daneshmend

    Key issues in managing information systems in the minerals industry will likely continue to be those relating to the integration and interoperability of disparate systems. This paper argues that, in o

    Jan 1, 2000

  • CIM
    Open-Pit Dewatering at Pine Point Mines

    By B. Calver, D. J. M. Farnsworth

    "As open-pit operations expanded at Pine Point, hydraulic aquifer evaluation was undertaken to establish the criteria necessary for the design of a feasible dewatering system.The extreme climate of th

    Jan 1, 1969

  • CIM
    Open-Pit of Mining by the at Knob Iron Lake, Ore Company of Canada at Knob Lake, Quebec

    By V. Gregoire

    THE DEVELOPMENT by the Iron Ore Company of Canada of the Quebec-Labrador mining project, which eventually led to 'Iron Ore in 1954', involved, from the start, several distinct undertakings.

    Jan 1, 1958

  • CIM
    Open-Pit Planning at the Adams Mine

    By F. J. West

    This paper deals with Jones & Laughlin Steel Corporation's new Adams mine, near Kirkland Lake, Ontario. After a brief discussion of ore structure, type, reserve tonnages, etc., the main body of the pa

    Jan 1, 1966

  • CIM
    Opening Up Conversations On Small Modular Reactors Throughthe Deliberative Mapping Approach

    By L. Shasko

    Deliberative mapping is a method of public engagement designed to bring citizens and specialists together to inform policy decisions in conflict-laden areas of science and technology (Stirling and Dav

    Jan 1, 2020

  • CIM
    Operating Cost Budgets for Mines

    By Leonard Kellogg

    Introduction The Mine Manager or Superintendent is a man faced with a difficult problem. He must direct the activities of his mine in such a manner that, over a period of time, the greatest possible

    Jan 1, 1952

  • CIM
    Operating Culture Impact on APC Application Design: Approaches and Case Study

    By A. B. Morrow

    Consulting engineers are well aware of large variations in plant operating cultures between countries, companies, and even within sites and operating crews. These operating cultures must be considered

    Jan 1, 2014

  • CIM
    Operating Experience and Developments of G-Rex and Aurix100 Resin Exchange Technology

    By Peter Richards, Alexander Lewis-Gray, Mark Davies, Nicholas Katsikaros

    "Gekko Systems developed the Gekko Resin Exchange Column (G-REX) in order to optimise the recovery of gold in complex leach-to-electrowinning processes, as an intermediate step using a highly gold-sel

    Jan 1, 2016

  • CIM
    Operating experience and developments of G-REX and AuRIX®100 resin exchange technology

    By N. Katsikaros, A. Lewis-Gray, P. Richards

    "To optimize gold recovery in complex leach-to-electrowinning processes, Gekko Systems developed the Gekko resin exchange column (G-REX) as an intermediate step, using a highly gold-selective resin to

    Jan 1, 2017