Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Optibar Technology Successfully Implemented in Copper Electrowinning: The Myth is Fading

    By E. P. Wiechrnann, C. M. Castro, G. A. Vidal, F. A. Muñoz

    Different authors and publications indicate that Optibar Segmented Intercell Bars cause a remarkable distortion in the distribution of the current in a cell group. However, these results were based in

    Jan 1, 2011

  • CIM
    Optical Fibber Environmental Sensors Based on Vapochromic Gold Complexes

    By Candido Bariáin

    A new vapochromic material of formula [Au2Ag2(C6F5)4(bipy)2]n (bipy = 2,2´ bipyridine) has been developed and used for the detection of some volatile organic compounds as acetone either in vapour or i

    Oct 1, 2003

  • CIM
    Optimal Equipment Lifespan Vs Maintenance Cost

    By L. Chunpongtong

    One of the challenges of mine planning is to determine the most cost-effective replacement time for aging equipment. The lifespan of equipment, such as haul trucks and shovels, deployed in mining oper

    Aug 1, 2013

  • CIM
    Optimal layout of underground mining levels

    By Jorgen Elbrond, Yve Lizotte

    "A mathematical procedure for determining the underground mining level layout which minimizes the total costs of excavation and haulage is described. This procedure has the advantage over previous gra

    Jan 1, 1985

  • CIM
    Optimal Oxygen Allocation to Maximize Copper Smelter Throughput

    By Alessandro Navarra, Roberto Parra, Boyd Davis, Frank Mucciardi

    A smelter scheduling algorithm has been developed, which allocates the oxygen production between the smelting furnace and the converter aisle, so as to maximize copper throughput. The algorithm is i

    Jan 1, 2015

  • CIM
    Optimal Synthesis of Energy Supply Systems for Remote Open Pit Mines

    By M. Carvalho

    The primary motivation underlying the proposal of polygeneration systems for mine sites is to increase the efficient use of natural resources by combining different technologies and energy resources w

    Aug 1, 2013

  • CIM
    Optimal tailings management at Highland Valley Copper

    By R. C. Lo, M. D. Scott

    "This paper reviews tailings management at Highland Valley Copper, and outlines main features of its tailings storage facility enclosed between the H-H and L-L dams. Key management focusses are: energ

    Jan 1, 1992

  • CIM
    Optimisation and Continuous Improvement of Antamina Comminution Circuit

    By Edward Rybinski

    Compañía Minera Antamina is a polymetallic mining complex that produces copper and zinc concentrates as primary products and molybdenum and lead/bismuth/silver concentrates as by-products. In 2007, Me

    Jan 1, 2012

  • CIM
    Optimisation and Continuous Improvement of Antamina Comminution Circuit (f8192cd7-9bd8-4215-8434-d5a9df56e042)

    By Edward Rybinski, Serkan Dikmen, Walter Valery, Jorge Ghersi, Roberto Valle, Alex Jankovic, Javier Linares, Frank Davila

    Compañía Minera Antamina is a polymetallic mining complex that produces copper and zinc concentrates as primary products and molybdenum and lead/bismuth/silver concentrates as by-products. In 2007, Me

    Jan 1, 2012

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • CIM
    Optimisation of Cake Moisture at the Leached Sludge Filter Press

    By P. Belley

    Prior to 2006, the filtration unit for leached sludge treatment (filter press) permitted the filtration, washing and drying of cake to 17% (w/w) moisture. That year saw moisture content abruptly incre

    Jan 1, 2007

  • CIM
    Optimisation of Coke Breeze Addition in Iron Ore Pellets

    By G. Paquet, E. Godin

    "Since the mid fifty's, worlwide pellet production capacity has constantly risen (Fig. 1, Ref. 1 l. There was however at that time no real incentive to decrease production costs but only to produce as

    Jan 1, 1986

  • CIM
    Optimisation of Flotation Pulp Selectivity Utilising Nodal Analysis

    By Kym Runge, Emmy Manlapig

    "The objective of an industrial flotation circuit is to separate valuable minerals from non-valuable minerals utilising differences in their flotation recovery rate. Regrinding and reagent addition ar

    Jan 1, 2004

  • CIM
    Optimisation of Process Parameters of Spiral Concentrator for Beneficiation of Iron Ore Stacked Slimes from Kirandul, Chattisgarh, India

    By S. K. Sharma, Sanket Bacchuwar, Prabal Kumar Agrwal, G. V. Rao

    "Iron ore processing industries play a vital role in the Indian economy. At present Iron ore of around +64% Fe is used for production of Iron through blast furnace. To produce +64% Fe from low/medium

    Jan 1, 2016

  • CIM
    Optimisation of the Prominent Hill SAG Mill

    By Mark Weidenbach

    OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a

    Jan 1, 2012

  • CIM
    Optimisation of the Prominent Hill SAG Mill (bf73cc6e-b0d3-47b9-89d5-5e692f076fff)

    By Brett Triffett, Mark Weidenbach, Christopher Treloar

    OZ Minerals owns and operates the Prominent Hill copper-gold concentrator in South Australia, built in 2008 and commissioned in early 2009. The concentrator operates via semi autogenous grinding in a

    Jan 1, 2012

  • CIM
    Optimising Chemical Cost in Fine Coal Flotation at Bhelatand Coal Preparation Plant

    By Atul Bhatnagar, M. P. Sinha, Md Zahid Ahmad, Pallav Garg, Sanjay Kumar Singh, Shashi Ranjan, An Ecolab Company Nalco Water

    "Froth Flotation is undoubtedly one of the most critical processes in coking coal washing plants. This work was carried out at Bhelatand Coal Preparation Plant of Tata Steel was with an objective of c

    Jan 1, 2016

  • CIM
    Optimising Circuit Design for Gravity Gold Recovery

    To determine the optimal circuit configuration for gravity gold recovery consideration should be given to a range of factors in addition to the efficiency of the gravity circuit, including capital cos

    Jan 1, 2011

  • CIM
    Optimising Open Pit to Underground Cut-over

    By Anthony Finch

    Many mines combine open pit with underground mining, and on many occasions the underground mine is an extension of the open-pit. In these circumstances the decision about where the open-pit stops and

    May 1, 2011

  • CIM
    Optimising Plant Feed Quality and Process Performance Using Geoscan Elemental Analysis (ca3c00f6-f1ec-4b33-9dcb-bab9729026ee)

    "Geoscan is used for multi-elemental analysis of conveyed bulk materials in the minerals industry with proven performance and demonstrated paybacks of weeks or months in iron ore, manganese, copper, z

    Jan 1, 2016