Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    Optimising the Management of CIP/CIL Circuits

    By K. Barbetti

    "The carbon-in-pulp (CIP) process has been the dominant gold recovery process since the early 1980s. CIP has proven to be very adaptable for a wide range of ores and circuit configurations. The key pe

    Jan 1, 2017

  • CIM
    Optimising the Operation of Paste Thickening at the Yara Siilinjärvi Plant (8a3674cf-2785-43be-b17f-05be124f63bf)

    "Yara Siilinjärvi in Finland is the Western Europe's only apatite mine. Annually it produces one million tons of apatite concentrate, which creates 10 million tons of tailings. At the beginning of 201

    Jan 1, 2019

  • CIM
    Optimization and improvements in Dofasco's 165 MT EAF ladle design

    By S. Sagar

    In September 1996, Dofasco commissioned a 165 Mt twin shell EAF furnace and an associated ladle fleet. During and after this startup, refractory performance in the ladles was optimized on a holistic a

    Jan 1, 2004

  • CIM
    Optimization and Increasing Throughput at Jacobina

    By Alexandra Kozak, Rodrigo Costa, Bob Fukuhara

    "The Jacobina project in Bahia, Brazil commenced operations in 2004 with a design capacity of 4,200 tpd. A project development plan to increase plant capacity to 6,500 tpd will be discussed. The proje

    Jan 1, 2008

  • CIM
    Optimization Initiatives at Altonorte on the Path to Becoming a World Class Smelter

    By Beatrice Pierre, Juan Carrasco

    Altonorte began as a concentrate roasting operation in 1988 under the name of Refimet. In 1993, a copper smelter was built with a design capacity of 203,000 tonnes per annum of concentrate. Since 2001

    Jan 1, 2019

  • CIM
    Optimization of a Tilt Poured Permanent Mold Casting via Solidification Modeling

    By Bernard Tougas, Franco Chiesa, David Levasseur, Bernard Duchesne

    "In the present paper, the optimization of a tilt poured permanent mold will be carried out using filling and solidification modeling. This exercise resulted in 3 modifications of the initial mold des

    Jan 1, 2014

  • CIM
    Optimization of Acid Addition in High Pressure Acid Leaching at Ambatovy

    By R. Holmwood, M. Faris, P. Holloway, M. Collins

    Sulphuric acid addition is a major driver of the economics in the processing of nickel laterite ores by high pressure acid leaching (HPAL). Understanding the optimal acid addition rate is essential fo

    Jan 1, 2017

  • CIM
    Optimization of Acid Consumption for Copper Heap Leaching

    By Anand Raman, Steve Dixon

    "Industry practice for defining acid consumption is based on column tests. Freeport-McMoRan (FCX) has adopted a practice of leach operation using a defined pH or gpl acid in the raffinate based on the

    Jan 1, 2008

  • CIM
    Optimization of cable bolting pattern for cut-and-fill stopes in a manganese mine using observational, empirical, and numerical modelling approaches

    By A. Sinha, N. K. Babar, H. R. Kalihari, A. K. Chakraborty, M. R. Saharan, C. P. N. Pathak

    A case study is presented on the optimization of cable bolting patterns in cut-and-fill stopes at the Chikla Mine, MOIL, India. Rock mass characterization, using Bieniawski’s RMR and Barton’s Q, indic

    Jan 1, 2007

  • CIM
    Optimization of Capital Cost and Smelter Revenue - Integrated Team Rebuild of Barro Alto Furnaces

    By K Belanger, J. Mclachlan, F. Stober, G. Norval, B. Snider, A. Munsch, T. Koehler, E. Piantino, J. Carlos Queiroz

    The project to rebuild the smelting furnaces at the Anglo American - Barro Alto ferronickel smelter, located in Goias, Brasil, was initiated in September 2013. To optimize the capital cost, while maxi

    Jan 1, 2015

  • CIM
    Optimization of Cemented Rockfill Practices for Sublevel Stoping Mining System

    By Muhammad Zaka Emad

    ABSTRACT: Sublevel stoping mining methods with delayed backfill employs cemented rockfill (CRF) as a backfill material. It is used in underground mines to achieve ground control and reduce wall slough

    May 1, 2013

  • CIM
    Optimization of clean coal specifications

    By L. X. Li

    Coking coal producers often encounter variations in clean coal quality when mining multiseam deposits containing coals with different washability and coking properties. This paper describes how, for a

    Jan 1, 2014

  • CIM
    Optimization of Cu SX by Control of the Acidity

    By B. Grinbaum

    The solvent extraction of Cu from acidic leach solutions is carried out using oxime extractants. The mechanism can be described as liquid ion exchange, where a labile H+ in the oxime replaces Cu++ ion

    Jan 1, 2007

  • CIM
    Optimization of Die Cooling in the Aluminum Alloy Wheel Casting Process

    By Jianglan Duan, Steve L. Cockcroft, Andre B. Phillion, Carl Reilly, Daan M. Maijer

    "In the aluminum alloy wheel casting process, careful design of the cooling system in the die and its operation (cooling channel timing) are critical to achieve quality and productivity goals. The pro

    Jan 1, 2014

  • CIM
    Optimization of Effective Parameters in Gold Extraction Process from Poly Metal Ore, Using Thiourea as a Cyanide Alternative and Sodium Cyanide

    By P. Karimi, A. Amini, H. Abdollahi, A. Mirzaeian

    Due to detrimental effects of cyanidation process on the environment in gold industry, application of cyanide alternatives such as thiourea are being highly considered in recent projects. In this stud

    Jan 1, 2016

  • CIM
    Optimization of Industrial Copper Electrowinning Solutions

    By Corby G. Anderson

    "Laboratory testing using industrial electrowinning solutions was performed to determine the best Faradic cell efficiency for copper cathode recovery. The variables tested were solution flow rate, rec

    Jan 1, 2016

  • CIM
    Optimization of Microwave-Ultrasound Assisted Leaching of Copper Anode Slime Based on Central Composite Design

    By Z. Y. Ma, H. Y. Yang

    The process of microwave-ultrasound assisted leaching of valuable metals from copper anode slime was proposed in this paper. Design of experiments has been used to study the effect of the main leachin

    Jan 1, 2014

  • CIM
    Optimization of open pit short- and long-range production scheduling

    By Charle Pelley, Kosta Fytas, Peter Calder

    "A computer model has been developed which is capable of evaluating alternative production schedules (long- and short range) of an open pit mine once the ultimate pit limits have been defined. The mod

    Jan 1, 1987

  • CIM
    Optimization of Pellet Plant Process Parameters Using Six Sigma Methodology

    By Andrea McGlynn

    Iron Ore Company of Canada, Labrador City 2011?Canada's largest iron ore producer, leading global supplier of iron ore pellets and concentrates ?Rio Tinto (58.7%), Mitsubishi Corporation (26.2%

    May 1, 2011