    Pilot plant study on improved electrostatic precipitation of copper converter dust

    By L. Lamothe, C. H. The

    "Pilot precipitator tests were conducted at Noranda's Horne Smelter in late 1978 to evaluate methods of improving converter dust collection efficiency. A bout 35 Nms/min. of converter off-gas wer

    Jan 1, 1985

  • CIM
    Pilot Plant Testing for Column Flotation Circuit Design

    By G. A. Kosick, G. S. Dobby, O. Matwijenko

    "A 100 kg/hr portable flotation pilot plant has been operated at Kidd Creek Mines with the objectives of:(a) determining performance expected by column flotation circuits on primary zinc and copper cl

    Jan 1, 1990

  • CIM
    Pilot Scale Testing of a Lead-Zinc Ore Aljustrel Project

    By Jeffiey B. Austin, Maurice Tagami

    "The ores of the Iberian Pynte Belt are typically massive sulphide ores with very fine grained mineral textures. EuroZinc Mining Corporation is currently evaluating one of the massive sulphide deposit

    Jan 1, 2000

  • CIM
    Pilot Smelting of Ring of Fire Chromite Ores

    By M. Muinonen, A. R. Barnes, R. Pandher, M. J. Lavigne

    Over the past three years, Ring of Fire chromite ores have been tested extensively at both the bench scale and pilot scale at XPS Consulting and Testwork Services. Following bench scale testwork, two

    Jan 1, 2014

  • CIM
    Pilot Test Of Emew® Technology Application To Copper Electrorefinery Bleed Streams With High Arsenic Content

    By L. Byszynski

    The results of a three month evaluation of the application of EMEW® technology at the KGHM Glogów II Smelter tank house bleed stream are presented. The current, conven¬tional electrolyte decopperizati

    Jan 1, 2007

  • CIM
    Pilot Test Of The Permeable Reactive Barrier For Removing Uranium From The Flooded Gunnar Pit

    By D. Kong, A. Klyashtorin, L. McGilp, I. Wilson

    This work reports on applying iron oxide coated sands media in an experimental permeable reactive barrier to remove uranium species from uranium containing water. A field experiment was conducted at t

    Jan 1, 2020

  • CIM
    Pilot Testing Of A Process Developed For Treatment Of Nicontaining Copper Concentrate After High-Grade Matte Separation Resulting In Blister Copper Production In Twozone Vaniukov Furnace

    By L. B. Tsymbulov, L. Sh. Tsemekhman, A. N. Golov

    Gipronickel Institute, JS is developing a process of continuous converting of Nicontaining copper matte and concentrates resulting in the production of blister copper and fluid NiO-containing slag in

    Jan 1, 2007

  • CIM
    Pilot-plant data for the design of primary autogenous and semi-autogenous mills

    By C. A. Rowland

    "Plant owners and operators, plant designers and grinding mill manufacturers are giving much attention to the design and manufacture of autogenous and semi-autogenous grinding mills, particularly the

    Jan 1, 1981

  • CIM
    Pilot-Plant Facilities for Hydraulic Transport of Solids

    By L. G. Smith, C. A. Shook, W. H. W. Husband, W. Schriek

    "The flow of slurries in pipelines is governed by many variables, and the study of the influence of each of these variables is difficult, if not impossible, in some cases. Many correlations are availa

    Jan 1, 1973

  • CIM
    Pilot-plant treatment of a Quebec talc ore

    By P. R. A. Andrews

    "Talc ore from Bakertalc, High water, Quebec analyzing about 60% talc, previously dry ground to about 95% minus 53 µm was beneficiated in an 11.4 kg/ h pilot-plant flotation circuit. A concentrate of

    Jan 1, 1989

  • CIM
    Pilot-Scale and Continuous Bench Testing of the Aims Cn-DTM Cyanide Destruction Process on an Australian Gold Plant Tailings Effluent

    By S. Glen

    Cyanide management practices on modern gold plants are becoming more onerous, due to environmental pressures, particularly for signatories to the International Cyanide Management Code. Operations are

    Jan 1, 2011

  • CIM
    Pilot-Scale Evaluation for the Codelco Continuous Converting Process

    By A. Moyano

    The development of the traditional converting process performed in a PeirceSmith or Hoboken converter is limited by the investment magnitude associated to the fulfillment of the environmental regulati

    Jan 1, 2007

  • CIM
    Pilot-Scale Frother Testing at Highland Valley Copper

    By S. D. D. Welsby

    "A pilot-scale flotation column was used to evaluate four polyglycol frothers at Teck’s Highland Valley Copper Mine. The column was fed with flotation plant feed from the grinding circuit cyclone over

    Jan 1, 2014

  • CIM
    Pilot-Scale Industrial Microwave-IR Sorting of Porphyry Copper Ores

    By C. Dodds, R. S. Ferrari-John, The University of Nottingham, G. Dimitrakis, J. Katrib, A. R. Batchelor

    "Sorting technologies have the potential to reduce energy use in comminution by rejecting uneconomic ore before feed material enters the mill. However, a major challenge for sorting porphyry copper or

    Jan 1, 2016

  • CIM
    Pinchi Lake Mercury Belt

    By J. E. Armstrong

    "Pinchi Lake and Bralorne Takla mercury mines; Canada's only producing mercury mines during the past war (1939-1945); occur within the Pinchi Lake mercury belt. This belt is in central British Columbi

    Jan 1, 1954

  • CIM
    Pinchi Lake Mercury Reduction Plant

    By R. Bainbridge

    THE cinnabar deposits of the Consolidated Mining and Smelting Company's Pinchi Lake property, situated near Fort St. James, B.C., were discovered and reported on by a Dominion Government geologic

    Jan 1, 1945

  • CIM
    Pine Point Mines dragline application of a peak shaver on a small power system

    By T. E. Smith

    "This paper describes the application of a motor-driven flywheel unit, known as a peak shaver, to compensate for the cyclic load fluctuations of a large electric dragline installed at Pine Point Mines

    Jan 1, 1980

  • CIM
    Pioneer Days of Electrolytic Copper Refining in Japan: From the First Copper Refinery up to the Present Day

    By Phillip J. Mackey, Susumu Okabe

    Copper mining and smelting has been carried out in Japan for over 13 centuries and in fact stretching back into antiquity. In 1889, the first electrolytic copper refinery in Japan based on Elkington’s

    Jan 1, 2019

  • CIM
    Pioneers in Hydrometallurgy

    By F. Habashi

    "Extractive metallurgy was divided into the three sectors pyro-, hydro-, and electrometallurgy in 1959 when Professor Joseph Newton at the Idaho School of Mines in Moscow mentioned this in his book Ex

    Jan 1, 2016

  • CIM
    Pipe Ore Processing Developments in the Thompson Mill

    By P. G. Claridge, R. A. Tenbergen

    "Pipe Open Pit ore is delivered by rail to the Thompson Mill at a rate of 34,000 tons per week. Ore is milled at a rate of 220 tons per hour.Characteristics of the serpentinised peridotite host rock a

    Jan 1, 1975