Process Control... And Where Are We Going?
By Brian Flintoff
"When I was first asked to prepare this paper and presentation in late June, I thought it might be fun to ""step back and paint the bigger picture."" Having attempted to do this, fun is not the first
Jan 1, 1998
-
Process Costs: From Conventional Accounting to ABC
By O. Schnake, M. Isakson, C. A. Landolt
The paper presents the conceptual basis for the development of an Activity Based Costing system (ABC) for the analysis and estimation of process costs in mining and metallurgy. In particular, it discu
Jan 1, 2007
-
Process Description and Aerosol Exposures at Vale Canada’s (Inco’s) Copper Cliff Nickel Refinery
"As part of a series describing the nickel operations of Vale Canada (formerly known as Inco), this paper focuses on the 1973 to current operations of the Copper Cliff nickel refinery in Ontario, Cana
Jan 1, 2015
-
Process Design and Change Management for Successful Deployment of Technology in Mining
By Laura Mottola
Process Design and Change Management for Successful Deployment of Technology in Mining Over the last 30 years Canada has been successful in developing but not deploying hardrockmining automation.
May 1, 2010
-
Process Design Consideration for a Small Gold Mill in the Northwest Territories
By A. M. Childs, R. F. Mather, K. R. Rawling
"The challenges encountered in the design and construction of mines and their process facilities today are becoming more intense and the engineering more competitive. The need to incorporate new techn
Jan 1, 1983
-
Process design considerations for the fluidized bed technology applications in the nickel industry
By K. Adham, C. Lee
Over the last forty years, a number of specific fluidized bed applications in nickel extraction have been developed for commercial use. Five important processes have gained particular acceptance, name
Jan 1, 2004
-
Process Development and the Zinc-Lead Blast Furnace
By C. F. Harris
Following the initial development of the zinc-lead blast furnace, efforts have been directed both at increasing the scope of the process and increasing the cash return. The paper reviews the process d
Jan 1, 1979
-
Process Development at the Raglan Concentrator
By Joe Holmes, Peter Langlois
"Falconbridge’s Raglan Concentrator, located at the northern limit of Quebec’s Nunavik Region, has been in operation since December 1997. Originally designed to process 800,000 tonnes per year of high
Jan 1, 2001
-
Process development by Dynatec for the Ambatovy Nickel Project
By J. Stiksma, R. Kalanchey, M. J. Collins, G. Owusu, R. Raudsepp, K. R. Buban, L. A. Barta, I. M. Masters
This paper describes the results of testwork for the treatment of Ambatovy laterite ore by a pressure acid leach process, with recovery of the soluble nickel and cobalt values as mixed sulphide interm
Jan 1, 2005
-
Process Development for Milling B-Zone Ore at Rabbit Lake
By S. Dicarlo
"In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia
Jan 1, 1988
-
Process Development for the Recovery of Critical Materials from Electronic Waste
By P. Keller, T. E. Lister, G. G. Clark, L. A. Diaz
As electronic technology continues to evolve there is a growing need to develop processes which recover valuable material from antiquated technology. This need follows from the environmental challenge
Jan 1, 2016
-
Process Development Studies Carried Out by Dynatec as Part of Tthe Ambatovy Nickel Project Evaluation
By J. Stiksma, R. Kalanchey, M. J. Collins, G. Owusu, R. Raudsepp, K. R. Buban, L. A. Barta, L. Masters
This paper describes the results of testwork for the treatment of Ambatovy laterite by an acid pressure leach process, with recovery of the soluble nickel and cobalt values as mixed sulphide intermedi
Jan 1, 2004
-
Process Diagnosis using Quantitative Mineralogy
By Lori Kormos, Jhonny Carrión De la Cruz, Dominic Fragomeni, Elizabeth Whiteman, Jorge Oliveira
"Process diagnosis, flowsheet design and optimisation are most effectively and efficiently achieved through the use of metallurgical testwork combined with more modern quantitative mineralogical techn
Jan 1, 2010
-
Process Dynamics of Grinding Circuits and the Use of Automatic Control
By T. C. Crosby
"Grinding has a marked effect on concentrator recovery and operating cost, and improved operation through automatic control can enhance plant performance. The correct application of automatic control
Jan 1, 1967
-
Process engineering evaluation of lignite upgrading technologies
By Adam J. Szladow
"INTRODUCTIONThe low calorific value and the high moisture and ash contents of run-of-mine (r.o.rn.) lignite limits the utilization of Saskatchewan lignites to thermal power plants in Saskatchewan, Ma
Jan 1, 1989
-
Process Engineering for the Freeforming of Al-Based Components using CSC-MIG Welding:
By S. Brophy
Controlled Short Circuit ? Metal Inert Gas (CSC-MIG) welding is a process that can be referred as a "Cold Welding" technology. The CSC process is based on accurate control of the welding wire position
Jan 1, 2011
-
Process Engineering in Froth Flotation
By A. Vien, A. J. Neale, B. C. Flintoff, R. P. Edwards
Froth flotation is one of the most widely used and effective processes for mineral beneficiation. First introduced in 1911, flotation technology has seen many developments over the past 80+ years. Inn
Jan 1, 1994
-
Process Engineering Of Flotation Circuits No.34
By R.P. Edwards, B.C. Flintoff
Froth flotation is one of the most widely used and effective processes for mineral benefication. First introduced in 1911, flotation technology has seen many developments over the past 80-plus years.
Jan 1, 1995
-
Process for activated carbon-assisted oxidation of arsenic species in process solutions and waste waters
By Ahmad Ghahremaninezhad, Noelene Ahern, Yeonuk Choi
Arsenic (As) is a toxic element and is a major contaminant in the extraction processes of some metals (e.g. gold and copper). Due to the toxicity of arsenic species, its removal from As-containing str
Jan 1, 2014
-
Process for Integrating Surface Drainage Constraints on Mine Planning
By Les F. Sawatsky
Surface drainage, particularly mine closure drainage, must be properly considered during all stages of mine planning because it presents constraints that are critical to economic mine operation, minim
May 1, 2009