Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • CIM
    Socio-economic Contribution of Gold Mining in the Yellowknife Mining District

    By Warwick D. Bullen

    Gold mining in the Yellowknife area of the Northwest Territories started long before the concept of sustainability entered the academic literature and by the time the term enjoyed widespread public ac

    May 1, 2004

  • CIM
    Accounting for Risks in Economic Evaluation of Gold Mining Projects in Ghana ? A Case Study

    By Peter A. Eshun

    This paper studies two methods that account for risks associated with gold mining projects such as mineral risks and country risks. The first method is sensitivity analysis, which investigates the eff

    May 1, 2004

  • CIM
    Climate and Hydrology Data Collection for Northern Mine Development

    By Nathan P. Schmidt

    Climate and hydrology data are required during all phases of mining projects, including impact assessment, mine planning and design, operational water management and mine closure and reclamation desig

    May 1, 2004

  • CIM
    Canadian Clean Power Coalition: Clean Coal Power Plant Technology

    By Paul R. Clark

    Outline ? Coal As An Energy Resource ? Canadian Clean Power Coalition ? Phase I of the CCPC Project ? CO2 capture options ? Gasification ? CO2 use ? Results ? Phase II Plans ? Next Steps Tra

    May 1, 2004

  • CIM
    Optimising Stope Sequences for Long Term Mine Planning

    By André van Wageningen

    Long-term mine scheduling is one of the most difficult optimization problems. The problem is said to be NP-complete in that the best possible solution cannot be found any quicker than checking all pos

    May 1, 2004

  • CIM
    Hazard Map Approach Using Space-time Clustering Analysis of Mining-induced Microseismicity

    By Pavel Vasak

    Microseismic monitoring has become standard practice in the mining industry as a ground control monitoring tool at depth. Translating the information into practical hazard assessment tools for the roc

    May 1, 2004

  • CIM
    ERP Systems in the Brazilian Mining Industry: A Case Study

    By Paulo F. T. Sachs

    ERP systems have been widely implemented nowadays in several industries. However, ERP was originally designed to fit former MRP and MRP II users, and most of the ERP research has been focused on discr

    May 1, 2004

  • CIM
    ESPMS ? An Earth Structure Performance Monitoring Management System

    By Song (Bruce) Li

    This paper presents a three-tier web-based GIS application that uses Java Server Page (JSP), Java Servlet and relational database to manage performance monitoring and reporting in the oil sands mining

    May 1, 2004

  • CIM
    Age Dating and its Geodynamic Implications for the Gangdese Porphyry Cu-Mo belt, Tibet

    By Gaoming Wang

    Outline 1. The Gangdese porphyry Cu-Mo belt 1.1 Regional geological background 1.2 Cu-Mo-bearing porphyries 1.3 Mineralization and alteration 2. Dating methods and results 2.1 Qulong porphyry 2

    May 1, 2004

  • CIM
    Snowmaking to Remove Nitrogen from the Mine Water at the East Boulder Mine, Stillwater Mining Company

    By Steven Aiken

    The East Boulder Mine located in Montana, U.S.A. utilizes snowmaking to assist with mine water treatment for nitrogen removal. Nitrogen species, including ammonia, are common contaminants in mine wate

    May 1, 2004

  • CIM
    DynoMiner? APS Gassing Trials Stillwater East Boulder Mine

    DynoMiner APS Delivery Systems Overview ? New Design of DynoMiner APS-M2 ? Stand alone or attach to Cargo type 10,000 lb (4536 kg) emulsion bins. ? Hose reel w/200-ft (61-m) by 1-inch I.D (25-mm)

    May 1, 2004

  • CIM
    Grindability Assessment Using Particle Size or Particle Surface Area

    By Baoquan An

    The energy required to fragment a rock is proportional to the increase in the fracture surface area and hence is proportional to the rock?s surface area. In comminution, the slope of the linear relati

    May 1, 2004

  • CIM
    High Chromium White Irons for Slurry Pump Service in Mineral Processing

    By Rees J. Llewellyn

    High chromium white irons can be formulated to provide required combinations of abrasion and erosion wear resistance, toughness and capability to withstand corrosion attack. As a consequence, they are

    May 1, 2004

  • CIM
    Monitoring of Highwall Stability at the Dome Open Pit

    By John G. Henning

    The Porcupine Joint Venture operates the Dome Mine in South Porcupine, Ontario. Dome underground began production in 1910. It is the longest continuous operating gold mine in Canada, producing in exce

    May 1, 2004

  • CIM
    Geostatistical Determination of Production Uncertainty: Application to Pogo Gold Project

    By J. A. McLennan

    Geological uncertainty is an unavoidable characteristic of all mining projects since only limited information is available from sampling. Mine planning and development decisions with significant econo

    May 1, 2004

  • CIM
    Multivariate Geostatistical Simulation at Red Dog Mine, Alaska, USA

    By Oy Leuangthong

    Red Dog mine is the world's largest Zn producer. The deposit consists of sulphide ore zones in sedimentary exhalative (sedex) deposits, and is characterized by the presence of multiple metals and

    May 1, 2004

  • CIM
    Consideration of Potential Effects of Climate Change and Resulting Hydrologic Impacts on Mine Developments

    By Getu F. Biftu

    There is general agreement among scientists that global surface temperatures have been increasing during the past decades. The increase in temperature is postulated to be the result of either an incre

    May 1, 2004

  • CIM
    Stepped Frequency GPR Field Trials for Determining the Ideal Frequency Bandwidth for Use in Potash Mines

    By W. Greg Maybee

    Separations, which form along stratigraphic boundaries in the roofs of potash mines, pose a serious safety concern. If these separations go undetected they can lead to falls of ground. The current met

    May 1, 2004

  • CIM
    Research and Development for an Ultra-Low Profile LHD

    By Patrick F. R. Murphy

    An ultra-low profile LHD has been developed by EJC Mining Equipment of Burlington, Ontario for narrow-reef mining applications. This paper discusses the challenges encountered during the evolution of

    May 1, 2004

  • CIM
    Integrated Underground Mining and Processing ? A Systems Approach

    By Malcolm Scoble

    Process Technologies Suitable for Application Underground Design Criteria - coarse particle technologies - compact, robust, flexible - waste products suitable for use as backfill Process technol

    May 1, 2004