Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • NIOSH
    OFR-100-93 Results Of The 1991-92 U.S. Bureau Of Mines Site Specific Mineral Investigations Project In Alaska

    By Steven A. Fechner

    In 1991 and 1992, the Bureau of Mines completed chromium, platinum-group metals (PGM), and tin investigations, and started indium, manganese, titanium, and vanadium investigations in Alaska. These stu

    Jan 1, 1994

  • NIOSH
    OFR-101-78 Mine Grounding Systems - Evaluation Of In-Mine Grounding System And Codification Of Ground Bed Construction And Measurement Techniques.

    By Wils L. Cooley

    Several aspects of mine safety grounding systems and equipment are studied. Electrolytic corrosion of test ground beds has shown a high incidence of stray current damage, while efforts to build a reli

    Jan 1, 1977

  • NIOSH
    OFR-101-79 Development Of Fail Safe Trolley Energizing/De-Energizing System

    By D. S. Kimmel

    The Bureau of Mines sponsored development of a system to remotely energize and de-energize the trolley wire in a section in response to demands from vehicles as they enter and leave the controlled sec

    Jan 1, 1978

  • NIOSH
    OFR-101-80 Environmental Assessment Of In Situ Mining

    By Dennis R. Kasper

    This study evaluates selective environmental impacts of two distinct in situ mining techniques. In situ leaching of uranium, porphyry copper and native copper and in situ borehole (slurry) mining of u

    Jan 1, 1979

  • NIOSH
    OFR-101-84 Development Of A Multiple Unit Continuous Haulage System

    By GJ Hundman

    The Multiple Unit Continuous Haulage (MUCH) System was designed to provide the capacity to continuously convey coal from the mining machine to the main haulage belt. The MUCH System has an operator

    Jan 1, 1983

  • NIOSH
    OFR-102-75 Operating Practice Changes And Control Modifications To Improve The Safety Of Coal Augering Operations ? Introduction And Approach

    Auger operations produced 14 million tons of coal in 1974, or approximately 5% of all surface mined coal. It was the most efficient of all coal mining methods, producing 40.0 tons per man-day. Exhibit

    Jan 1, 1975

  • NIOSH
    OFR-102-80 Evaluation Of The Kloswall Longwall Mining System

    By Paul J. Guay

    This report presents the results of evaluating a longwall mining system specifically designed to extract a very deep web (60 inches or deeper) from a longwall panel. The report includes a productivity

    Jan 1, 1978

  • NIOSH
    OFR-102-81 An Assessment Of Thin Seam Mining System Technology

    By J. Clark

    The objective of this study has been to determine the state of the art in underground, thin-seam-mining systems, to identify new technology and procedures that would reduce the hazards of thin-seam mi

    Jan 1, 1980

  • NIOSH
    OFR-102-82 Development And Testing Of Self-Drilling Roof Bolts

    By F. S. Kendorski

    This report presents the results of a search for viable-self-drilling roof bolt concepts, detailed development, design, and manufacture of such bolts that drill their own holes, and testing in the lab

    Jan 1, 1979

  • NIOSH
    OFR-102-83 Computer Simulation Of Mining Subsidence Using The Zone Area Method - I. Introduction

    By M. Karmis

    Surface subsidence is an inevitable consequence of many underground mining operations and has been recognized as such since the fifteenth century. Damage resulting from this phenomenon ranges from sim

    Jan 1, 1983

  • NIOSH
    OFR-102-84 A Feasibility Study For The Detection Of Weak Electromagnetic Signal/Bursts With Hard-Limited Arrays

    By M. Kanefsky

    Two channel polarity coincidence and polarity difference statistics are analyzed. The signal, common to both channels, consists of sinusoidal bursts where the exact frequency of the signal is nearly k

    Jan 1, 1981

  • NIOSH
    OFR-102-85 Satellite Monitoring For A Coal Waste Embankment

    By F. J. Prokoski

    The COALSTAR Project, which operated from November 1981 to December 1982, was a research and development project aimed at providing a reliable and inexpensive means of monitoring various waste site co

    Jan 1, 1984

  • NIOSH
    OFR-103(1)-75 Circuit Breaker Development And Application - USBM Contract Phase I Report - Section 1. Program Objectives And Results - 1. 1 Background

    By D. A. Paice

    Direct current electrical systems are used in most coal mines primarily to power the main haulage trains and secondarily to feed other equipment and passageway lighting. Electrical power is supplied f

    Jan 1, 2012

  • NIOSH
    OFR-103(1)-77 U.S.B.M. Pilot Hole "X", Horse Draw, Rio Blanco County, Colorado - Volume I - Section I: Geology & Geophysics

    By L. A. Readdy

    Pilot Hole "X" was drilled to test the formations through which the ventilation shaft for the proposed U.S.B.M. demonstration oil shale mine would be drilled. The geologic formations encountered in th

    Jan 1, 1977

  • NIOSH
    OFR-103(1)-79 Control Of Vibration And Blast Noise From Surface Coal Mining - Volume I

    By John F. Wiss

    A series of controlled experiments was conducted at four surface coal mines to study the effects of certain blast parameters upon the ground and air vibration. Preliminary scale-model blasts were cond

    Jan 1, 1978

  • NIOSH
    OFR-103(1)-82 Feasibility Of Water Diversion And Overburden Dewatering - Volume I: Technical Report

    By Michael L. Clar

    The U.S. Bureau of Mines contracted a study to determine the feasibility of water diversion and overburden dewatering for underground coal mines in the Appalachian Region. All relevant published liter

    Jan 1, 1981

  • NIOSH
    OFR-103(2)-75 Circuit Breaker Development And Application - USBM Contract Phase II Report - Section 1. Program Objectives And Results - 1.1 Summary

    By D. A. Paice

    Under the first phase of this contract as reported in the Phase I report it was determined that certain types of commercially available molded case breakers are capable of interrupting mine dc power s

    Jan 1, 2012

  • NIOSH
    OFR-103(2)-77 U. S. B. M. Pilot Hole "X", Horse Draw, Rio Blanco County, Colorado - Volume I - Section II: Permeability Testing

    By Adrian Brown

    Pilot Hole ?X? was drilled to test the formations through which the ventilation shaft for the proposed U.S.B.M. demonstration oil shale mine will be drilled. Five permeability tests were performed at

    Jan 1, 1977

  • NIOSH
    OFR-103(2)-79 Control Of Vibration And Blast Noise From Surface Coal Mining - Volume II

    By John F. Wiss

    A series of controlled experiments was conducted at four surface coal mines to study the effects of certain blast parameters upon the ground and air vibration. Preliminary scale-model blasts were cond

    Jan 1, 1978

  • NIOSH
    OFR-103(2)-82 Feasibility Of Water Diversion And Overburden Dewatering - Volume II: Annotated Bibliography

    By Michael L. Clar

    This volume is an annotated bibliography of published literature pertaining to the occurrence and control of surface and groundwater in underground coal mines. This literature was used to develop Volu

    Jan 1, 1981