Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • NIOSH
    OFR-106-84 Testing Jet Fans In Metal/Nonmetal Mines With Large Cross-Sectional Airways

    By M. F. Dunn

    The objective of this work was to define jet fan performance in d variety of large cross-section underground mine applications and to develop guidelines for thin performance in open airways, dead head

    Jan 1, 1983

  • NIOSH
    OFR-107-77 Minimum Cost Strategies For Longwall Equipment Moves

    By Thomas Gales

    Longwall mining has a high potential for producing bulk production from a single face. Production is interrupted for a considerable time when it is necessary to move the equipment to a new block of co

    Jan 1, 1977

  • NIOSH
    OFR-107-78 In-Situ Determination Of Bulk Electric Properties Of Coal

    By David C. Chang

    A survey of in-situ methods for determining bulk electric properties of coal is given. Largely because of the strong dependence of coals properties on operating frequency, different sensing methods ha

    Jan 1, 1977

  • NIOSH
    OFR-107-79 In-Situ Coal Pillar Strength Study

    By Fun-Den Wang

    This report presents the results of two large scale field coal pillar strength tests (80 ft by 80 ft), the results of a series of laboratory small core sample tests, and the correlation between those

    Jan 1, 1976

  • NIOSH
    OFR-107-80 Design And Develop Standardized Controls In Roof Bolting Machines - Preliminary Design

    By Terry L. Muldoon

    The report describes the development of preliminary requirement specifications for standardized operating controls for roof bolting machines used in underground coal mining. According to recent st

    Jan 1, 1980

  • NIOSH
    OFR-107-81 Proceedings Of The Fourth WVU Conference On Coal Mine Electrotechnology August 2-4, 1978

    A compilation of papers presented at the Fourth WVU Conference on Coal Mine Electrotechnology in Morgantown, West Virginia, on August 2-4, 1978. Papers cover areas of electric power, electronic commun

    Jan 1, 1978

  • NIOSH
    OFR-107-82 Demonstration Of Coal Mine Illumination Systems (Machine Lightning Design For Coal Mine Applications)

    By William F. Hahn

    This project focused effort on three separate areas: demonstration of a low seam longwall illumination system, design of illumination systems for low coal auger miners, and an assessment of machine li

    Jan 1, 1982

  • NIOSH
    OFR-107-83 Control Of Blackwater In Coal Preparation Plant Recycle And Discharge

    By P. A. Rey

    Water recycle is an important part of the coal preparation process. This study was directed toward: (1) a survey of current practice and an evaluation of both the solid and liquid components of blackw

    Jan 1, 1983

  • NIOSH
    OFR-107-84 Using Auxiliary 'Jet Fans" In Large Underground Metal/Nonmetal Mines: A Handbook

    By M. F. Dunn

    A handbook to provide a quick reference guide for selecting and using jet fans in a variety of conditions was prepared. The document is intended for use by front-line supervision, ventilation engineer

    Jan 1, 1983

  • NIOSH
    OFR-108-76 Technology Of Auger Mining - Summary - Coal Reserves And Project Independence

    Studies of coal reserves have shown that the total augerable reserve base for the United States is estimated to be five billion tons under the current state of mining technology; the potential reserve

    Jan 1, 1975

  • NIOSH
    OFR-108-77 The Effect Of Organizational Climate And Policy On Coal Mine Safety

    By Mark S. Sanders

    The present study was designed to explore the contribution of organizational climate and management practices to the injury experience in underground coal mines. A cross-lagged panel design was used i

    Jan 1, 1976

  • NIOSH
    OFR-108-78 Development Of An Improved Methane Sampling System

    By Wilbur L. Webb

    An electrically powered methane sampling system for application on mining machines was designed, fabricated and laboratory tested. The system will sequentially draw sample air at a controlled rate fro

    Jan 1, 1977

  • NIOSH
    OFR-108-79 Dust Sampler Tamper-Proof Filter Cassette

    By Charles H. Etheridge

    A new filter cassette is described which can be used with Coal Mine Dust Personal Sampler Units (CFR, Title 30, Part 74). The sealed cassette design reduces the chances of sample loss due to reverse f

    Jan 1, 1978

  • NIOSH
    OFR-108-81 Development Of A Portable Gas Analyzer For In-Mine Personnel Monitoring

    By Edward A. McClatchie

    A novel nondispersive electro-optical gas analyzer has been designed, fabricated and tested. The instrument is based on a pressure modulated absorption technique. Key features of this new gas analy

    Jan 1, 1980

  • NIOSH
    OFR-108-82 Feasibility And Applicability Of Hydraulic Mining And Transport In Underground Noncoal Mines

    By William C. Cooley

    This study Identifies and evaluates deposits of noncoal minerals in the U.S. which are most amenable to be mined underground hydraulically and transported hydraulically. A method was developed to scre

    Jan 1, 1981

  • NIOSH
    OFR-108-83 Flotation Properties And Selective Flotation Of The Slightly Soluble Minerals

    By F. F. Aplan

    Separation of the slightly soluble minerals (Ksp? 10-10), one from the other is one of the more difficult tasks confronting flotation engineers. This study has focused on means of separating such prom

    Jan 1, 1983

  • NIOSH
    OFR-108-85 Development Of Environmentally Attractive Leachants - Volume III - Geochemical Flow Modeling

    By Robert S. Schechter

    This report describes the development and application of PHASEQ/FLOW, a geochemical flow simulator capable of describing the dynamic changes in chemical composition of an aqueous solution during flow

    Jan 1, 1985

  • NIOSH
    OFR-109-76 Design And Recommended Specifications For A Safe Methane Gas Piping System

    By David W. Tongue

    This report describes the engineering work leading to the design of an underground coal mine piping system to transport approximately 2,000,000 cubic feet per day of methane gas to the surface from de

    Jan 1, 2012

  • NIOSH
    OFR-109-77 Noise Reduction Of Conveyors Used In Underground Coal Mining Machinery

    By Geoffrey G. Huggins

    Discussions are presented of the three phases of the noise reduction program on flight-type coal conveyors. The three phases are identification of noise sources, evaluation of potential noise reductio

    Jan 1, 1976

  • NIOSH
    OFR-109-79 Coal Mine Combustion Products Identification And Analysis Procedures And Summary

    By K. L. Paciorek

    The primary objective of this final phase of Contract No. H0133004 was to provide a description of all experimental assemblies and procedures used throughout this project in such a detail as to permit

    Jan 1, 1978