Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • NIOSH
    OFR-60-84 Performance Criteria Guideline For Three Explosion Protection Methods Of Electrical Equipment Rated Up To 15,000 Volts AC

    By Larry Joe Linley

    The Department of the Interior, Bureau of Mines is reviewing explosion protection methods for use in gassy coal mines. This performance criteria guideline is an evaluation of three explosion protectio

    Jan 1, 1982

  • NIOSH
    OFR-60-85 Correct Shortcomings During Trial Of Shotcrete Lining System And Demonstrate Shotcrete System

    This report describes the redesign, development and field demonstration of a remote shotcrete lining system, capable of operating in shafts and mines from 8 to 16 feet in diameter at depths up to 1000

    Jan 1, 1983

  • NIOSH
    OFR-60-86 Analysis Of Miners' Job Attendance Behavior And Its Relationship To Miners' Accidents And Injuries - Final Report

    By Paul S. Goodman

    This report examines absenteeism and accidents. The first section provides some background information on absenteeism. The second section examines trends in absenteeism in underground coal mines over

    Jan 1, 1985

  • NIOSH
    OFR-60-88 Development Of Face Decision Support System For Underground Coal Mines

    By Roy S. Nutter

    An expert system advisor consultant to assist a coal mine section foreman is described in this report. The system is designed for an underground continuous miner section that is being specifically use

    Jan 1, 1988

  • NIOSH
    OFR-61(1)-73 The Role Of Mine Tailings Ponds In Reducing The Discharge Of Heavy Metal Ions To The Environment ? Summary And Conclusions

    By Roy E. Williams

    1. The major sources of heavy metal ions in wastewaters of the Coeur d'Alene Mining District are effluents from metallurgical processing plants. Effluents from mine operations provide a secondary

    Jan 1, 2011

  • NIOSH
    OFR-61(1)-78 Coal Mine Electrical System Evaluation - Volume I - Continuous Monitoring

    By Lloyd A. Morley

    A concept is presented to improve underground coal mine electrical system safety and availability. This proposed technique is based upon the ability to predict incipient failures in the mine power sys

    Jan 1, 1977

  • NIOSH
  • NIOSH
    OFR-61(2)-78 Coal Mine Electrical System Evaluation - Volume II - Transient Analysis

    By Lloyd A. Morley

    This report details the continuation of mine power systems transient research under USBM Grant G0155003. The purpose of the work, which commenced under Grant G0133077, is the elimination of safety haz

    Jan 1, 1977

  • NIOSH
    OFR-61(2)-79 Development Of Concepts For Surface Mining Moderately Pitching Coal Seams - Appendix Volume - Appendix A - Bibliography

    BIBLIOGRAPHY Allen, C.A, Analyses of Utah Coals, United States Bureau of Mines Technical Paper 345, 1925, pp. 90. Allen, J.E. and E.M. Baldwin, Geology and Coal Resources of the Coos Bay Quadr

    Jan 1, 1978

  • NIOSH
    OFR-61(3)-78 Coal Mine Electrical System Evaluation - Volume III - Shielded Cables

    By Lloyd A. Morley

    Proposed advantages and disadvantages of low-voltage shielded trailing cables are formulated utilizing the literature and industry sources. A partial analysis of these proposed advantages and disadvan

    Jan 1, 1977

  • NIOSH
    OFR-61(4)-78 Coal Mine Electrical System Evaluation - Volume IV - Computer Modeling

    By Lloyd A. Morley

    Research performed on computer modeling of mine power systems under USBM Grant G0155003 1S described. The work was performed at the Pennsylvania State University from 5 November 1975 through 4 Novembe

    Jan 1, 1976

  • NIOSH
    OFR-61(5)-78 Coal Mine Electrical System Evaluation - Volume V - Battery And Battery-Charging Safety

    By Lloyd A. Morley

    The primary goal of this research report is to discuss safety considerations involved in the use of lead-acid batteries for traction purposes in underground coal mines. In order to arrive at the o

    Jan 1, 1977

  • NIOSH
    OFR-61(6)-78 Coal Mine Electrical System Evaluation - Volume VI - Executive Summary

    By Lloyd A. Morley

    This report abstracts project work performed under USBM Grant GO155003 during the period 4 November 1975 to 3 November 1976. The research was funded, as a continuance of previous support from USBM Gra

    Jan 1, 1977

  • NIOSH
    OFR-61(7)-78 Coal Mine Electrical System Evaluation Apl Mine Electrical System Load-Flow Program

    By Lloyd A. Morley

    A guide to the development and use of an APL computer program for the analysis of load-flow problems is presented. The program is designed to provide an interactive method of load-flow study to improv

    Jan 1, 1977

  • NIOSH
    OFR-61-74 Research On The Transmission Of Electromagnetic Signals Between Mine Workings And The Surface

    By Richard G. Geyer

    One aspect of a program to improve the chances of survival following coal mine disasters is the development of a communications sys tem which will allow surviving miners to make their circumstances kn

    Jan 1, 1974

  • NIOSH
    OFR-61-75 Design Of Roof Bolt Patterns For Jointed Rock - Summary

    By Fred D. Wright

    The objectives of this research were: 1. to determine the stability relationships of coal mine roof rocks which are cut by fractures or intersecting joints with and without roof bolts, under various s

    Jan 1, 1974

  • NIOSH
    OFR-61-77 Preliminary Design Study Of Braking System For 10-Ton Coal Mine Rail Haulage Cars

    By Lee M. Manna

    Approximately 10,000, 10-Ton, 4 wheel, 2 truck, coal mine cars are in general service in U. S. Mines. None are equipped with an automatic braking system. Very few are equipped with hand or parking bra

    Jan 1, 1976

  • NIOSH
    OFR-61-80 Deep Cutting Miner Production Tests

    By Mukund O. Gangal

    A deep cutting continuous miner, HH456, was tested under production-mining conditions at the Joanne Mine, Rachel W. Va., for about 1 ½ years (226 production days). The miner was run in two modes: a lo

    Jan 1, 1979

  • NIOSH
    OFR-61-81 The Impact Of Eliminating Safety Fuse From Metal/Nonmetal Mines

    By Dipak Sengupta

    This study analyzes the safety, technology, and economic impact of eliminating safety fuse from metal/nonmetal mines, based on operation and manufacturer experience over the past five to ten years. If

    Jan 1, 1980

  • NIOSH
    OFR-61-82 Design And Develop Feasible Lighting System For Conventional Slopes Under Construction

    By William F. Hahn

    This report describes an illumination system suitable for use in a slope under construction, Simulator work was performed using actual lighting hardware to verify adequate light levels to meet MSHA pr

    Jan 1, 1981