  • NIOSH
    OFR-104-76 Research And Development Contract For Detection Of Faults In Mine Haulage Systems - Phase II ? 1.0 Introduction

    By Robert R. Perron

    The U. S. Bureau of Mines is engaged in many diverse programs for improving mine safety. Of particular interest to the Bureau are new and improved means for minimizing the hazard of fire which can be

    Jan 1, 1975

  • NIOSH
    OFR-22-76 Technical And Economic Study Of An Integrated Single Pass Mining System For Open Pit Mining Of Deep Oil Shale Deposits ? Phase I Report ? Section I. Summary

    By Carlie E. Banks

    Tasks during Phase I of this contract effort were performed in four principal functional areas. These were geology, hydrology, reclamation and mining. Data were gathered from literature reviews, mine

    Jan 1, 1975

  • NIOSH
    Cost Allocation Procedures

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    Cost Systems Cost systems are organized methods of collecting, allocating, and accumulating resource utility expressed in terms of money. There are two major spheres of cost accumulation: financial

    Jan 1, 1975

  • NIOSH
    Mine Ventilation Simulators

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    Network analysis of mine ventilation systems is not new, having been traced back to 1854. A Committee Report (1970) has also reported the extensive work done in this respect in the United Kingdom, Jap

    Jan 1, 1975

  • NIOSH
    RI 8029 Chemical Flame Inhibition Using Molecular Beam Mass Spectrometry - Reaction Rates and Mechanisms in a 0.3 Percent CF3Br Inhibited Methane Flame

    By Joan C. Biordi

    [Composition profiles for atomic, radical, and stable species, as well as temperature and area expansion ratio profiles, have been determined for a nearly stoichiometric CH4-02-Ar flame and one to whi

    Jan 1, 1975

  • NIOSH
    OFR-11-76 Development Of An Illumination System For Longwall Coal Mines - 1.0 Introduction

    By Gary Friedline

    As a consequence of the Coal Mine Health and Safety Act of 1969(PL91-173), the Bureau of Mines (BOM) entered into a contract with Ocean Energy Inc. (OEI) to develop, fabricate, install, and evaluate a

    Jan 1, 1975

  • NIOSH
    OFR-90-76 Alternate Methods Of Handling The Parting Between Two Coal Seams

    By Thomas E. Finch

    This report is an engineering-economic evaluation of alternate methods of handling the parting between two coal seams. It consists of evaluations of parting stowing techniques applicable in a represen

    Jan 1, 1975

  • NIOSH
    IC 8695 Coal Surface Mining Reclamation Costs - Appalachian And Midwestern Coal Supply Districts

    By Robert J. Evans

    Reclamation costs were estimated for 20 coal surface mining operations in the Appalachian and Midwestern Coal Supply Districts (these two districts were divided into three multi-State regions). The co

    Jan 1, 1975

  • NIOSH
    OFR-28(2)-76 Survey Of Underground Hydraulic Coal Mining Technology Volume 2 - Appendix A - Data On Underground Hydraulic Coal Mines ? A.1 Scope

    By William C. Cooley

    [Data from t.-raturs on each hydr,ne has been assembled on the- data sheets whichw6ed in this Appandin. Dai_iis are provl_ od for ::amines or hydraulic s-ctions in the USSR (TDPhw~s), 8 in ASR (Ku

    Jan 1, 1975

  • NIOSH
    OFR-24-76 Underground Application Of Foam For Suppression Of Respirable Dust - Introduction

    By R. H. Hiltz

    The Coal Mine Health and Safety Act of 1969 legislated maximum dust levels for the working place. As the law was implemented, extensive efforts were undertaken to provide the technology necessary to c

    Jan 1, 1975

  • NIOSH
    OFR-18-76 Economic Feasibility Of Recovering And Utilizing Methane Emitted From Coal ? I. Summary - A. Purpose And Scope

    The U.S. Bureau of Mines has been concerned for many years with the general problems of underground coal mining and the particular problems due to the methane content of the coal. The Bureau and other

    Jan 1, 1975

  • NIOSH
    OFR-46-77 Propagation Of Radio Waves In Coal Mines - I. Executive Summary - A. Objective

    By Robert L. Lagace

    The objective of this task was to perform theoretical analyses related to identifying and increasing the understanding of wireless propagation mechanisms in mines, and for predicting the performance r

    Jan 1, 1975

  • NIOSH
    OFR-34-77 Digital Computation Of Transients And Safety Testing Of Mine Electrical Power Systems. - Periodic Inspection Of Mine Electrical Power Systems ? 1.1 Introduction

    Airy kind of a power system is a complicated network of various electrical components, such as cables, transformers, electric machines, circuit breakers, etc. For a system to work continuously and eff

    Jan 1, 1975

  • NIOSH
    OFR-32-76 Coal Mine Conveyor Belt Combustion Products Identification And Analysis ? I. Abstract And Summary

    By K. L. Paciorek

    The aim of this program was to develop a reliable and meaning-ful basts for assessing certain safety aspects, namely fire and, in particular, toxicity hazards of articles employed in underground coal

    Jan 1, 1975

  • NIOSH
  • NIOSH
    OFR-100(1)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Phase I Report

    By Normal Seidle

    This report (rind related Appendices) provides a description of the functional design specifications and related rationale for development of a training system for dragline equipment operators. Pha

    Jan 1, 1975

  • NIOSH
    OFR-110-77 Development Of Winch-Pulled Dozer Blade Equipment System

    Study to develop a new and more cost effective equipment system, incorporating a winch-pulled dozer blade, for leveling spoil and performing reclamation of area strip mines.

    Jan 1, 1975

  • NIOSH
    OFR-68-75 Feasibility Of Hydraulic Transportation In Underground Coal Mines ? Executive Summary

    By James M. Link

    Underground coal mining is the most hazardous industrial occupation in the United States.. Haulage accidents in underground coal mines contribute substantially to the occupational hazards of this type

    Jan 1, 1975

  • NIOSH
    OFR-8(2)-76 Analysis Of Men, Materials And Supplies Handling Systems In Underground Metal And Non-Metal Mines - Volume II ? Phase I Report - Present Systems Study ? Introduction

    This project, "Analysis of Men, Materials and Supplies Handling Systems in Underground Metal and Nonmetal Mines" documents the productivity and safety aspects of the existing equipment and systems uti

    Jan 1, 1975

  • NIOSH
    OFR-83(2)-78 XVIth International Conference On Coal Mine Safety Research Washington, D.C., 1975 - Opening And Closing Sessions - Discussion Of Papers ? Introduction

    The XVIth International Conference on Coal Mine Safety Research was divided into eight half-day technical sessions. In accord with the established practice of these conferences, at each session, prese

    Jan 1, 1975