Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Optimization of geological lead-time in a feasibility study drill out—Two Rivers Platinum, Mpumalanga, South Africa
By Hornsey R., P. van der Merwe
The Two Rivers Project is a feasibility study to evaluate the UG2 chromitite layer on Dwarsrivier372KT, Mpumalanga Province, South Africa. The project, which commenced in August 2001, is expected to r
Jan 1, 2003
-
Optimization of gold recovery concentrates processing by the use of arsenatizing roasting, А.Y. Senchenko, А.V. Aksenov, and S.G. Rybkin
By А. V. Aksenov, S. G. Rybkin, А. Y. Senchenko
For gold plants in Russia, it is very complicated and costly to use cyanide leaching for efficient processing of gold refractory ores, where gold is closely associated with sulphide minerals and the s
Jan 1, 2020
-
Optimization of Iron Ore Blending in the COREX Shaft Furnace
By C. Liu, F. Ye
"To extend the variety of lump ores that are used in the COREX shaft furnace and to optimize iron ore blending, the original evaluation method for iron ores that was proposed by Voestalpine AG has bee
May 1, 2019
-
Optimization Of Mechanized Mining Layout Within Anglo American Platinum
By P. Valicek
Anglo American Platinum Limited is constantly striving to improve safety and productivity. There are many different initiatives taking place within the organization in order to ensure continued safe
Jan 1, 2012
-
Optimization of mill performance by using online ball and pulp measurements - Synopsis
By B. Clermont
Ball mills are usually the largest consumers of energy within a mineral concentrator. Comminution is responsible for 50% of the total mineral processing cost. In today?s global markets, expanding min
Jan 1, 2010
-
Optimization of shape factor by the response surface method, and the effect on sphalerite flotation recovery
By T. Uysal
Various morphological parameters that affect the flotation recovery of sphalerite were modelled and optimized using the response surface method (RSM). The effects of roughness value, shape factor, and
Sep 6, 2023
-
Optimization of shift cycles in the South African mining sector
By J. Pelders, F. Magweregwede, S. M. Rupprecht
Increased depths of conventional gold and platinum mines, longer travelling times as working places move further from the shaft, and ancillary activities taking place in the mining cycle reduce the us
Aug 1, 2021
-
Optimization of shovel-truck system for surface mining - Synopsis
By S. G. Ercelebi
In surface mining operations, truck haulage is the largest item in the operating costs, constituting 50 to 60% of the total. In order to reduce this cost, it is necessary to allocate and dispatch the
Jan 1, 2009
-
Optimization of shuttle car utilization atan underground coal mine
By P. R. Segopolo
"The purpose of the project is to convert current shuttle car utilization on an underground coal mine to best practice by focusing on change-out points and tramming routes, which have a major influenc
Jan 1, 2015
-
Optimization Of The As-Placed Properties Of Hydraulic Backfill
By A. M. Copeland, A. J. Barrett
The use of hydraulically placed backfill in the deep gold mines of South Africa has increased rapidly over the past decade. The backfill that is delivered to the placement areas has a relatively high
Jan 1, 1994
-
Optimization of the compaction of hard-metal powder for the production of cutting tool inserts - Synopsis
By K. Blaski
his paper reports an investigation aimed at optimizing the compaction of granulated hard-metal powder for the production of cutting tool inserts. The optimal compaction is that which yields optimal sh
Jan 1, 2007
-
Optimization of the Cycle Time to Increase Productivity at Ruashi Mining
By H. Thomas, I. N. M. Nday
"*Paper written on project work carried out in partial fulfilment of BSc.Eng (Mining Engineering) degreeThe optimization of the cycle time to increase productivity at Ruashi Mining was an on-site proj
Jul 1, 2019
-
Optimization of the loading and hauling fleet at Mamatwan open pit mine - Synopsis
By S. V. Mkhatshwa
The purpose of the study was to investigate the factors which affect the performance of the loading and hauling fleet and also find possible solutions to eliminate these factors, so that the daily ton
Jan 1, 2009
-
Optimization Of The Operating Density And Particle Size Distribution Of The Cyclone Overflow To Enhance The Recovery Of The Flotation Of Copper Sulphide And Oxide Minerals ? Synopsis
By F. Ntengwe
The Konkola Mine, a subsidiary of the Konkola Copper Mines Plc (KCM) which is owned by the Vedanta group of companies of India and Zambia Consolidated Copper Mines Holding limited, is located at Chili
Jan 1, 2011
-
Optimization Of The Transition From Open-Pit To Underground Operation In Combined Mining Using (0-1) Integer Programming - Synopsis
By E. Bakhtavar
There are many near-surface deposits with considerable vertical extent that have the potential to be mined by a combined method of open-pit and underground methods. In this regard, there is often a po
Jan 1, 2012
-
Optimization Studies on the Design of a Processing Plant for a Large Mining Venture
By C G. Robinson, B. K. Loveday, J. C. Paynter
"A method of optimizing the design of a processing plant has been developed which minimizes capital and operating costs for average stripping ratios and ore characteristics. Models were developed to d
Jan 1, 2014
-
Optimized dolomite upgrading, T. Mütze, T. Fraszczak, O. Ortlepp, and U.A. Peuker
By T. Fraszczak, U. A. Peuker, T. Mütze, O. Ortlepp
Dolomite is a calcium carbonate sedimentary rock that can be found all over the world. In its calcined form it is employed for water treatment or as an additive in iron production. Calcined dolomite i
Jan 1, 2020
-
Optimized Multivariable Control Of An Industrial Run-Of-Mine Milling Circuit
By D. G. Hulbert, I. K. Craig, S. P. Moult
This paper describes the application of a throughput-optimization strategy to a run-of-mine (ROM) mining circuit that is controlled by a multivariable controller. The objective of the optimization str
Jan 1, 1992
-
Optimizing control for a two-stage grinding circuit, O. Haavisto, M. Olofsson, J. Martikainen, S. Kauvosaari, and M. Kosonen
By S. Kauvosaari, M. Olofsson, O. Haavisto, M. Kosonen, J. Martikainen
The target in grinding circuit operation is usually to maximise the throughput and energy efficiency while keeping the product particle size on an optimal level for downstream operations. Furthermore,
Jan 1, 2020
-
Optimizing cut-off grade considering grade estimation uncertainty – A case study of Witwatersrand goldproducing areas
By C. C. Birch
Due to grade estimation uncertainty, two statistical errors can occur. The Type I error is where material is classified as ore and mined, despite the true value being below the break-even grade. This
Jul 2, 2022