Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SAIMM
    Optimization Of The Operating Density And Particle Size Distribution Of The Cyclone Overflow To Enhance The Recovery Of The Flotation Of Copper Sulphide And Oxide Minerals ? Synopsis

    By F. Ntengwe

    The Konkola Mine, a subsidiary of the Konkola Copper Mines Plc (KCM) which is owned by the Vedanta group of companies of India and Zambia Consolidated Copper Mines Holding limited, is located at Chili

    Jan 1, 2011

  • SAIMM
    Optimization Of The Transition From Open-Pit To Underground Operation In Combined Mining Using (0-1) Integer Programming - Synopsis

    By E. Bakhtavar

    There are many near-surface deposits with considerable vertical extent that have the potential to be mined by a combined method of open-pit and underground methods. In this regard, there is often a po

    Jan 1, 2012

  • SAIMM
    Optimization Studies on the Design of a Processing Plant for a Large Mining Venture

    By C G. Robinson, B. K. Loveday, J. C. Paynter

    "A method of optimizing the design of a processing plant has been developed which minimizes capital and operating costs for average stripping ratios and ore characteristics. Models were developed to d

    Jan 1, 2014

  • SAIMM
    Optimized dolomite upgrading, T. Mütze, T. Fraszczak, O. Ortlepp, and U.A. Peuker

    By T. Fraszczak, U. A. Peuker, T. Mütze, O. Ortlepp

    Dolomite is a calcium carbonate sedimentary rock that can be found all over the world. In its calcined form it is employed for water treatment or as an additive in iron production. Calcined dolomite i

    Jan 1, 2020

  • SAIMM
    Optimized Multivariable Control Of An Industrial Run-Of-Mine Milling Circuit

    By D. G. Hulbert, I. K. Craig, S. P. Moult

    This paper describes the application of a throughput-optimization strategy to a run-of-mine (ROM) mining circuit that is controlled by a multivariable controller. The objective of the optimization str

    Jan 1, 1992

  • SAIMM
    Optimizing control for a two-stage grinding circuit, O. Haavisto, M. Olofsson, J. Martikainen, S. Kauvosaari, and M. Kosonen

    By S. Kauvosaari, M. Olofsson, O. Haavisto, M. Kosonen, J. Martikainen

    The target in grinding circuit operation is usually to maximise the throughput and energy efficiency while keeping the product particle size on an optimal level for downstream operations. Furthermore,

    Jan 1, 2020

  • SAIMM
    Optimizing cut-off grade considering grade estimation uncertainty – A case study of Witwatersrand goldproducing areas

    By C. C. Birch

    Due to grade estimation uncertainty, two statistical errors can occur. The Type I error is where material is classified as ore and mined, despite the true value being below the break-even grade. This

    Jul 2, 2022

  • SAIMM
    Optimizing Design Capacity and Field Dimensions of Underground Coal Mines

    This paper presents a quantitative approach to the problem of determining design capacity and field dimensions of underground coal mines using room- and-pillar mining systems. In evaluating these desi

    Jan 1, 1987

  • SAIMM
    Optimizing LHD Utilization ? Synopsis

    By D. Mkhwanazi

    The purpose of the project was to optimize load haul dump (LHD) machinery use as they were spending too much time doing what they should not be doing. During the investigation, the author found that t

    Jan 1, 2011

  • SAIMM
    Optimizing Manganese Ore Sinter Plants: Process Parameters And Design Implications

    By W. Barthel, B. A. Dippenaar, J. Malan

    In its most basic form, the process of sintering is very simple, and has been in use since the turn of the previous century. However, while the basic process is simple, control of

    Jan 1, 2004

  • SAIMM
    Optimizing Medium - Term Operational Plans for a Group of Copper Mines

    By M. Splaine, W. Davidson, D. C. Atkinson

    Since 1964, Nchanga Consolidated Copper Mines, Ltd., has been developing and using production scheduling methods for optimizing its metallurgical operations in the short term (up to one year). Medium-

  • SAIMM
    Optimizing Medium-Term Operational Plans for a Group of Copper Mines (476b3df3-c089-4b00-9560-1bbd80974db2)

    By M. Splaine, W. Davison, D. C. Atkinson

    "Since 1964, Nchanga Consolidated Copper Mines, Ltd., has been developing and using production scheduling methods for optimizing its metallurgical operations in the short term (up to one year). Medium

    Jan 1, 2014

  • SAIMM
    Optimizing of gas-shielded metal arc welding parameters for 10.5-12.5% chromium steel using 308L electrodes

    By J. W. van der Merwe, A. M. Maleka, V. J. Matjeke

    The 10.5–12.5% chromium, titanium-stabilized ferritic stainless steel (FSS) plates used to fabricate coal line jumbo wagons is susceptible to undesirable chromium depletion during welding with 309L el

    Apr 5, 2023

  • SAIMM
    Optimizing process control with near infrared online analysis: Case studies in sinter and gold ore processing, P. Mühlen and C. Nelson

    By P. Mühlen, C. Nelson

    Process control optimisation depends a lot on the availability of timely data from production to give operators a chance to make adjustments before potential process upsets or disruptions happen. A lo

    Jan 1, 2020

  • SAIMM
    Optimizing Shaft Pressure Losses Through Computational Fluid Dynamics Modelling

    By W. J. Kempson

    As a result of the rising electrical energy costs in South Africa, a method was sought to reduce the overall electrical consumption of typical shaft systems. A typical shaft configuration was analysed

    Dec 1, 2013

  • SAIMM
    Optimizing the cut-off grade for tabular gold deposits, considering the South African gold tax and mineral resource royalty regime

    By F. T. Cawood, C. C. Birc

    The South African mineral resource royalty system, initiated in 2010, employs a hybrid ad valorem approach tied to profitability ratios. This rate is then applied to the total revenue from mineral sal

    Aug 8, 2024

  • SAIMM
    Optimizing The Life Of Ore Passes In A Deep-Level Gold Mine

    By P. R. Brenchley

    Main ore pass systems should last the life of a mine, and too often expensive and hazardous remedial measures are required to repair a damaged ore pass in an attempt to extend its life. In order to ma

    Jan 1, 2006

  • SAIMM
    Optimizing The Performance Of Wet Drum Magnetic Separators

    By M. Dworzanowski

    The difference in the magnetic properties of minerals is the basis for magnetic separation. All minerals can be generally classified as ferromagnetic (strongly magnetic), paramagnetic (weakly magnetic

    Jan 1, 2010

  • SAIMM
    Optimizing the Public Gains from the Exploitation of Mineral Resources

    By J. Zwartendyk, A. Azis

    Optimizing the public gains from the exploitation of mineral resources By Dr A. AZIS and Dr J. ZWARTENDYK Every nation must decide how it should exploit its mineral resources so as to contribute most

  • SAIMM
    Optimizing the Public Gains from the Exploitation of Mineral Resources (2176cd36-e44e-4bbb-9bd9-109a940939d6)

    By J. Zwartendyk, A. Azis

    "Every nation must decide how it should exploit its mineral resources so as to contribute most to its national objectives. It is argued that the present value of the future corporate income tax flow d

    Jan 1, 2014