Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Successes And Failure Of VCR Mining At Homestake
By J. C. Haptonstall
Stoping methods at the Homestake Gold Mine through 1978 had been traditional overhand cut-and-fill, shrinkage or square set. High costs, low-productivity and safety concerns prompted the mine to searc
Jan 1, 1986
-
Successful Application of EPB Tunneling for the Denny CSO Project, Seattle, Washington
By Clay Haynes, Tim Pearia, Robert Robinson, Judy Cochran
A 1.89 km-long, 4.5 m-I.D. tunnel was successfully constructed through saturated hard clay, and highly abrasive dense sand and gravel, with groundwater heads ranging from 10 to 20 m. In order to addre
Jan 1, 2003
-
Successful Application Of Remote Seals Used To Extinguish A Coal-Mine Fire
By D. Bour, C. Nyikos, R. Curtice
Fire in a coal mine can be disastrous on many levels. In most cases, when a fire is detected, mining operations cease and all personnel are evacuated. Underground coal-mine fires are difficult to exti
Jan 1, 2002
-
Successful Completion of LA Metro Regional Connector Transit Project - RETC2023
By Mike Harrington, Tung Vu
The Regional Connector Transit Project is a 1.9-mile-long underground light rail system that will connect LA Metro’s A (Blue), E (Expo), and L (Gold) Lines in downtown Los Angeles. This $1.75-billion
Jun 13, 2023
-
Successful Completion of Major Large-Scale Tunnel Infrastructure Projects in the Southern Hemisphere with XXL Machines
By Karin Bäppler
"When considering large-scale infrastructure projects worldwide special attention has to be paid to the large diameter tunnel construction projects that were successfully completed in the Southern Hem
Jan 1, 2016
-
Successful Cost Reductions At The Henderson Mill
By Kevin Hegerle
The Henderson Mill has operated over a wide range of production rates, feed grades, manpower levels and recovery targets since start-up in 1976. Henderson Mill personnel, both management and hourly, h
Jan 1, 1986
-
Successful Direct Vegetation Of Acidic Deep Coal Mine Refuse
By J. C. Draper
The Duquesne Light Company and GAI Consultants, Inc. conducted a demonstration program aimed at establishing permanent vegetative cover directly on acidic, deep coal mine refuse. Several plots were tr
Jan 1, 1983
-
Successful Project Management For IT Projects - Practical Example: Implementation Of Comprehensive Accounting And Controlling Software Based On SAP R/3 In A Czech Construction Company
By Klaus Böde
Within the national and international strategy of the German based construction company HOCHTIEF, the majority of its business units is equipped with the comprehensive software package ARISTOTELES. Th
Jan 1, 2002
-
Successful Project Team Integration for Riverside Badlands Tunnel
By Drupad B. Desai, James G. Gallanes
A key component of the Inland Feeder Project is the Riverside Badlands Tunnel, a7.9-mile stretch subjected to high internal and external hydraulic pressures passing beneath highly eroded hills in a se
Jan 1, 1997
-
Successful Soft Ground NATM Approach on Metro Section E4B in Washington, D.C.
By Peter Kolitsch, Galyn Rippentrop
INTRODUCTION On April 14, 1994, the joint venture of Kiewit Construction Company and Kenny Construction Company was awarded a 76 million dollar contract for the construction of the New Hampshire A
Jan 1, 1997
-
Successful Tailings Dewatering Design Using Multi-linear Drainage Geocomposites - SME Annual Meeting 2022
By P. Saunier, S. Fourmont, R. Stafford, A. Jung, J. Mlynarek
The safe and economical storage of tailings generated by modern day mining operations is possibly the single largest challenge faced by miners today. By nature, tailings are a waste product that have
Mar 2, 2022
-
Successful Tunneling for Water Tunnel No. 3, New York City, New York
By Thomas P. Kwiatkowski, Joginder S. Bhore, Christopher D. Orlandi, Jose Velez
Three case histories of successful TBM tunneling for New York City Water Tunnel No. 3 are presented. The tunnels, costing about one billion dollars total, are the 5-milelong, 18'-11" OD Brooklyn
Jan 1, 2007
-
Successful Win-win Cooperative Fforts Withlocal Communities At Minera Yanacocha, Peru
By Rosa H. Harris
The world's largest gold dump leach operation, Minera Yanacocha S.A., has installed community assistance programs in Peru concerned with health, education, electrification, agricultural assistance and
Jan 1, 1998
-
Suggested and Prescriptive Means and Methods—Are They Really in the Owner’s Interest?
By Gary Almeraris, Vincent Jr Tirolo
Traditionally, “Means and Methods” were the sole responsibility of Contractors. However, because of a number of litigious projects in the 1970s, Owners and their Engineers began including Suggested Me
Jan 1, 2005
-
Suggestions For Increasing Metalliferous Ore Discoveries By More Effective Use Of Exploration Techniques And Other Considerations
By Douglas R. Cook
Our present and future needs for base and previous metals are not satisfied by the present rate of new viable discoveries. This deficiency can be met by increasing the number of competent exploration
Jan 1, 1968
-
Suitability Of Artificial Stone As Building Material: A Sustainable Development Option For The Construction Industry
By S. Maurigiannakis
In an effort to promote sustainability in the construction industry, the natural decorative stones that cover large external areas of buildings may be replaced with artificial stones. In this paper th
Jan 1, 2003
-
Sulfate Ion Reducing Bacteria For Dilute Acid Mine Drainage
By D. Belin
Treatment of dilute acid mine drainage and similarly polluted water is becoming increasingly complicated. The pressure of economics is now exacerbated by legislation which classifies as hazardous wast
Jan 1, 1991
-
Sulfate Reducing Bioreactor Treating Acidic Coal Mine Influenced Water (MIW) In Western Pennsylvania
By R. L. Eppley
The Blacklick Creek Watershed Association was awarded a $158,000 Growing Greener grant from the Pennsylvania Department of Environmental Protection in 2002 for the design and construction of a sulfate
Jan 1, 2010
-
Sulfate Reduction - Designing Systems For Long Term Treatment (238ad8d9-2dab-4d3c-a3f1-88274f1b5135)
By J. Wagner, P. Eger
Although lifetime estimates for sulfate reduction based on total substrate carbon typically range from 20 to 30 years, field and laboratory experiments showed that rates of sulfate reduction decreased
Jan 1, 2001
-
Sulfate reduction - designing systems for long-term treatment
By J. Wagner, P. Eger
Although lifetime estimates for sulfate reduction based on total substrate carbon typically range from 20 to 30 years, field and laboratory experiments showed that rates of sulfate reduction decreased
Jan 1, 2002