Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Dearex Knowledge Acquisition And Engineering System - A Teaching And Exploration Tool For Developing Expert Systems For Use In Desert Areas
By Michael J. Shulman
The DEAREX knowledge acquisition and engineering system is a teaching and exploration tool designed to facilitate the under- standing and development of expert systems by explorationists without the a
Jan 1, 1992
-
The Debate Over The Impact Of Mining On The Environment And Sustainability In The Local Community
By G. A. Campbell
Mining companies have been very interested in the presence of a number of small but high-grade ore bodies of base metals in northern Wisconsin and the west/central section of the Upper Peninsula (UP)
Jan 1, 2008
-
The Deep Ore Zone (DOZ) Mine ? Cave Sequence Modifications
By A. Tarigan
The integration of the ESZ orebody and DOZ orebody resulted in a much larger footprint than the original DOZ Mine shape. The significant change in footprint geometry presented new cave front managemen
Jan 1, 2010
-
The Deep Underground Science And Engineering Laboratory And The Construction Of Physics Megacaverns
By C. Laughton
The Deep Underground Science and Engineering Laboratory (DUSEL) is to be constructed at the defunct Homestake Mine, in South Dakota. As a cornerstone of DUSEL?s research program, it is intended to con
-
The Degradation Process In Coal Slurry Pipelines
By M. G. Ayat
Coal degradation is the breakage of coal particles to finer sizes due to the continuous forces of attrition and gravity to which coal is subjected during mining, handling and preparation. The objectiv
Jan 1, 1986
-
The Delbridge Mine (A Case History Of A Lithochemical Ore Discovery, 1965)
By J. Boldy
The discovery of the Delbridge massive sulphide deposit in the Noranda district of Quebec resulted from an appreciation of the significance of a mercury leakage halo as a litho-chemical pathfinder to
Jan 1, 1984
-
The Delivery Of Underground Construction Projects In The UK: A Review Of Good Practice
By Andy Alder
The aim of this paper is to provide an overview and details of good practice, from a United Kingdom perspective, in the development and implementation of major tunnel and underground infrastructure pr
-
The Demand Picture For High Quality Clays ? Introduction
By James D. Cooper
Technologic advances in materials utilization during the past two decades have brought is a long way toward the point where we can make the products we need from the materials we have readily availabl
Jan 1, 1970
-
The Demineralization Of Pulverized Upper Freeport Coal In A High-Intensity Magnetic Separator
By William M. Kester
Finely sized Upper Freeport coals are beneficiated to reduce ash and sulfur using high-intensity magnetic separation to process both (1) raw, untreated coal as well as (2) raw coal which was pre-treat
Jan 1, 1965
-
The Density Separator - A Versatile Hydraulic Classifier Which Provides Improved Classification Efficiency And Control In The Particle Size Range 20-200 Mesh
By Edward W. Long
The Density Separator is basically a hindered settling classifier with automatic control features that provide steady, sharp classification irrespective of extreme variations in dry tons per hour of f
Jan 1, 1982
-
The Depletion Rationale And Recent Political Pressures Of Erosion ? Introduction
By Oscar H. Lentz
During 1960, the controversy over percentage depletion reached the level of debate between presidential candidates. Nixon took the position that he would not tamper with the status quo in this matter.
Jan 1, 1961
-
The Deportment Of Mercury During Thiosulfate Leaching And Resin-In-Pulp Recovery Of Gold From Ores
This paper reports on the behavior of mercury and its compounds during the thiosulfate leaching and recovery of gold. Thiosulfate solutions are shown to dissolve Hg0 and Hg2Cl2 to a similar extent as
Jan 1, 2010
-
The Deposition Of Radon Daughters And Daughter-Laden Aerosol On Rough Wall Surfaces
By P. K. Hopke, A. Hubbard, K. H. Leong, J. J. Stukel, K. Nourmohammadi
INTRODUCTION In order to understand the transport and deposition of radon daughters in mine atmospheres, it is necessary to know the variation in the attachment of the daughter atoms to particles a
Jan 1, 1981
-
The Design And Application Of Hydrodynamic Bearings For Large Diameter Machines - Introduction
By Dennis Arthur Fenton
The hydrodynamic bearing was first described by, Reynolds in 1886, and has since been widely applied in motors, engines, compressors, hydroelectric turbines, and other machinery. For various reasons,
Jan 1, 1985
-
The Design and Construction of Multiple Closely Spaced Tunnels in Soft Ground–A Case History of the Mac Storm Tunnel Project
By Mohamed A. Younis, Robert J. F. Goodfellow
This paper investigates the design approaches taken and the philosophy employed during the construction of the Metropolitan Airport Commission (MAC) storm tunnels, part of the Phase 4 Segment of the M
Jan 1, 2003
-
The Design and Construction of the Excavation for the Underground Works at the Rocky Mountain Pumped Storage Project
By C. M. Lundell, F. S. Kendorski, R. D. Prager
The criteria for the design of the shaft/tunnel system excavation at the Rocky Mountain Project was to provide a stable opening during and after construction to receive the concrete lining and to mini
Jan 1, 1986
-
The Design And Evaluation Of A Reactor To Contact Resin And Pulp
By Gregory Owen Lewis, Mark William Johns
The use of resin-in-pulp (RIP) to recover dissolved metal ions from slurries is receiving increasing attention. A number of engineering aspects have been identified as crucial if a RIP system is to o
Jan 1, 1996
-
The Design And Implementation Of The Field Test Plots At BHP Iron Ore, Mt. Whaleback-A Cover System For An Arid Climate
By M. Kane, O&apos
BHP Iron Ore initiated research programs in January of 1995 to develop long term plans for decommissioning of the waste rock material at their Mt. Whaleback operation. More than 2 billion tonnes of wa
Jan 1, 1998
-
The Design and Manufacture of the Arrowhead Tunnels Project Precast Segmental Lining
By Christopher Hebert, Michael R. King, Mehdi Ghazi
The Inland Feeder project is a critical component of Southern California’s water delivery system, relying on a strategic plan of water transfer and storage to enable the delivery of an additional 650
Jan 1, 2003
-
The Design and Operation of an Underground Conveyor Utilizing Intermediate Booster Drives With DC Motors And Controls
By Robert J. Wise, Mark Alspaugh
Underground longwall coal mines depend on conveyor haulage to transport large volumes of coal from the longwall face conveyor to the mine portal. In the last few years, the need for longer and larger
Jan 1, 1993