Tunneling in Toronto Shale—Construction of Coxwell Bypass Tunnel Project - RETC2021
By Ehsan Alavi, Daniel Cressman, Tatiana Chiesa, Robert Mayberry
The City of Toronto’s Coxwell Bypass Tunnel (CBT) is currently being constructed by North Tunnel Constructors ULC. The scope of the CBT project includes construction of approximately 10.5 km of 6.3 me
Jun 13, 2021
-
Tunneling Machines
By Neil J. Dahmen, Howard J. Handewith
INTRODUCTION Tunneling machines were introduced into civil con¬struction in the 1800s, but their practical applications were not realized fully until the 1950s. As of 1977, tunneling machines were
Jan 1, 1982
-
Tunneling Methods Under Low Cover Conditions
By Terry M. Tilley, Gregory P. Sherry
Purpose This is a unique project because the mining and tunneling industries have become highly mechanized and cannot normally accommodate a project where surface disturbance must be minimized or e
Jan 1, 2005
-
Tunneling on the Tren Urbano Project, San Juan, Puerto Rico
By Michael Gay, W. H. Hansmire, G. Rippentrop, V. S. Romero
The new Tren Urbano heavy rail transit project in San Juan, Puerto Rico has one very significant part, the Río Piedras Contract, being constructed underground. This paper will give an overview of the
Jan 1, 1999
-
Tunneling Performance And Geotechnical Aspects Of Los Angeles Metro Rail Contract A-171
By Saied S. Navid, Michael A. Piepenburg, Richard F. Escandon, Robert C. Lindsay
INTRODUCTION Phase I of the Los Angeles Metro Rail Project, known as MOS-1 (Minimum Operable Segment-1), is the first phase of the 27 km± (17 mi) subway starter line. MOS-1 is currently under const
Jan 1, 1989
-
Tunneling Performance Of Chemically Grouted Alluvium And Fill Los Angeles Metro Rail, Contract A-130
By Francis B. Gularte, James E. Monsees, John-Paul Whyte, Gary E. Taylor
In a short section of the Los Angeles Metro Rail system approximately 222.5 m (730 ft) of 6.4 m (21 ft) diameter twin-tube tunnels separated by a 1.8 m (6 ft) narrow pillar were designed to pass under
Jan 1, 1991
-
Tunneling Safety -- Regulations And Rewards
By Robert Vergie
Like most of you, I would rather work on a job than talk about it. But it is fruitful to spend some time taking stock of important developments in the heavy construction field. One of the strongest
Jan 1, 1974
-
Tunneling Settlement Effect on an Escalator Shaft at Bond Street Station Upgrade
By Anita Wu
"GENERAL BACKGROUND/CONTEXT The £300 million Bond Street Station Upgrade project will provide essential congestion relief and step-free access to an important interchange and destination station in th
Jan 1, 2016
-
Tunneling Success at Denver’s Platte to Park Hill Project is a Team Effort
By William Gleason
"The city of Denver, CO has experienced extreme growth in the past decade, with the population of the city topping more than 700,000 people in 2018. The current storm water drainage system was put in
Jan 9, 2018
-
Tunneling Through a Buried Valley with a Hard Rock EPB Compatible TBM - RETC2021
By William Hodder, Ehsan Alavi, Nader Ghasempour, Daniel Cressman
The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel (CBT) Project in Toronto will extend approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north
Jun 13, 2021
-
Tunneling Through Cobbles in Sacramento, California
By Joel Nonnweiler, Rafael Castro, Ross Webb
The three thousand foot long 66-inch diameter Folsom East Interceptor Section2B was completed accident free, on time and under budget with no measurable surface settlement. The tunnel passed through n
Jan 1, 2001
-
Tunneling Through Faults In Volcanic Rocks For The Construction Of The La Joya Project (Costa Rica)
By R. Grandori, L. Pellegrini
The construction of the La Joya hydropower plant (Costa Rica) was awarded by the Spanish power company, Union Fenosa, to the Italian Joint Venture formed by the companies SELI SpA and Ghella SpA. T
Jan 1, 2007
-
Tunneling Through Karstic Terrain
By Günter Strappler, Max John
When tunneling through karstic terrain, diverse and complex karst structures are to be expected. By means of drilling ahead of the face using drill jumbos, these structures can be detected to such a d
Jan 1, 2003
-
Tunneling Through Mountain Faults
By Don W. Deere
Faults under high rock cover represent some of the most severe ground conditions a Tunneler can encounter. High ground water pressures and flows are usually associated with mountain faults. Ground beh
Jan 1, 2007
-
Tunneling Through Reef Structures: Identification, Characterization, and Potential Impacts - NAT2024
By Jon Ike Isaacson, Michael Miller, Jarek Trela
Despite reef structures being relatively common in carbonate rocks around the world, tunneling experience in reefs is extremely rare. Impacts and risks associated with reef tunneling through these geo
Jun 23, 2024
-
Tunneling to Manage Construction Impacts for Albany’s Beaver Creek Clean River Project, Albany, New York - RETC 2021
By Greg Bold, Mahmood Khwaja, Yuannian (Jerry) Wan, Michael S. Schultz, William Simcoe
Beaver Creek Clean River Project will satisfy the consent decree requirements by capturing and treating combined sewage overflows. The project consists of, approximately, 2,700 feet of 30-inch trenchl
Jun 13, 2021
-
Tunneling Toronto Canada 1970
By G. F. Jenkins, P. S. Hobden
Toronto as a geographical area provides an exceptionally wide variety of subsoil stratiphication. Tunneling consequently required a very wide range of adaptabilities to meet its changing conditions. T
Jan 1, 1997
-
Tunneling Trials By Transport And Road Research Laboratory
By S. G. Tough, H. J. Hignett
The Transport and Road Research Laboratory is carrying out tunneling trials at Chinnor, Oxfordshire, with a 5-m-diam, full-face tunneling machine. The work, which is for research purposes only, involv
Jan 1, 1974
-
Tunneling Under City Streets With Tunnel Boring Machine - Route 131-A Section 5b East 63rd Street - Third Avenue To FDR Drive Borough Of Manhattan - New York City
By Morris Loshinsky, George Ziegler
NEW ROUTES - 63rd STREET CROSSTOWN The New Route construction along East 63rd Street in Manhattan began in 1969 with the East River tunnel connecting Manhattan and Queens. The 63rd Street Line, onc
Jan 1, 1981
-
Tunneling Under Glaciers Galore Creek Mine Access Tunnel, BC, Canada
By Dean Brox, Jason Morrison, Peter Procter
The Galore Creek Mine project is one of the newest major mining projects underdevelopment in Canada. The project is located in a very remote area of northwester British Columbia and is being developed
Jan 1, 2007