    Blast-Induced Rock Fragmentation in Wet Holes Mining, Metallurgy and Exploration

    By Hesam Dehghani, Farid Alimohammadnia, Nima Babanouri, Mokhtar Kalhori

    In open-pit mining, blasting pattern design is performed to achieve a desired degree of fragmentation for loading, hauling, and crushing operations. Inappropriate fragmentation of rock will result in

  • SME
    Blast-Induced Rock Fragmentation in Wet Holes Mining, Metallurgy and Exploration

    By Hesam Dehghani, Farid Alimohammadnia, Nima Babanouri, Mokhtar Kalhori

    In open-pit mining, blasting pattern design is performed to achieve a desired degree of fragmentation for loading, hauling, and crushing operations. Inappropriate fragmentation of rock will result in

  • SME
    Blast-Induced Rock Movement Measurement For Grade Control

    By Ananta L. Yennamani

    Blast movement measurement (BMM) transmitters are a practical method to measure three-dimensional (3D) rock movement because of blasting. The BMM transmitters are activated, programmed and installed i

    Jan 1, 2011

  • SME
    Blasted Ore Losses and Mineral Reserve: Reconciliation Approaches and Impact on Stope Performance - Mining, Metallurgy & Exploration (2021)

    By Marcel Laflamme, Sebastián Ibarra‑Gutiérrez

    Improvement on controlling the stope limits has enabled the assessment of technical performance in several underground mining operations. Technical performance, integrated to stope geotechnical and ge

    Aug 9, 2021

  • SME
    Blasthole Mining In Poor Ground Conditions At Magma Copper -Superior Division

    By D. Donison

    The practice of blasthole mining is typically applied in competent ground conditions, primarily because of the open stope dimensions. At Magma Copper -Superior Mine, a field pilot project was complete

    Jan 1, 1994

  • SME
    Blasthole Samples - A Source Of Bias?

    By H. Peter Knudsen

    In most open pit gold mines, ore-waste selection is based on estimates made from blasthole samples. These estimates frequently are biased. This paper focuses on the source of the conditional bias. Whi

    Jan 1, 1993

  • SME
    Blasthole Samples -A Source Of Bias? (PREPRINT NUMBER 91-128)

    By H. P. Knudsen

    In most open pit gold mines ore waste selection is based on estimates made from blasthole samples. These estimates frequently are biased. While it is true that high grades and "outliers" can induce a

    Jan 1, 1991

  • SME
    Blasthole Stoping At The Lac Shortt Mine, Corporation Falconbridge Copper ? Mine History

    By Louis P. Gignac

    The Lac Shortt gold deposit is located in Northwestern Quebec, at some 115 km west of the Opemiska Division and 380 km northeast of the Lac Dufault Division, as shown on Figure 1. Falconbridge's

    Jan 1, 1985

  • SME
    Blasthole Sub-Level Stoping At Kidd Creek Mine

    By Peter N. Blakey

    The Kidd Creek orebody is a massive, base metal deposit with widths up to 600 feet and a strike length of 2,200 feet. The orebody dips eastwards at 70° to 80° and is amenable to sub-level open stoping

    Jan 1, 1976

  • SME
    Blasting

    By Joseph S. Malesky

    The discovery and development of explosives mark one of the most important findings in the history of civilization. Without explosives our vast economic enterprise concerning the mining of coal, coppe

    Jan 1, 1981

  • SME
    Blasting Abrasives In The United States Market

    By G. T. Austin

    Every year the United States consumes millions of dollars worth of abrasive materials as blasting media. Entrained in either a gas or liquid stream or propelled by paddles or wheels, they are directed

    Jan 1, 1994

  • SME
    Blasting Design For Increased SAG Mill Productivity

    By C. L. Barron, M. L. Smith, K. A. Prisbrey

    SAG mill throughput is often a bottleneck to increasing plant productivity. Improved size distribution control in the mill feed can be used to increase mill production. This can be accomplished by con

    Jan 1, 1994

  • SME
    Blasting Design For Increased SAG Mill Productivity

    By M. L. Smith

    SAG mill throughput is often a bottleneck in increasing metal productivity. Improved size distribution control in the mill feed can be used to increase mill production. This can be accomplished by con

    Jan 1, 1993

  • SME
    Blasting Effects and Their Control

    By Lewis L. Oriard

    INTRODUCTION In recent years, there has been a trend in the direction of larger drilling equipment and larger diameter blastholes. Although this change has improved the efficiencies and reduced the

    Jan 1, 1982

  • SME
    Blasting Fume Prediction And Control As A Means Of Reducing Ventilation Costs

    By E. De Souza, H. Heidrich

    In underground operations the evaluation of blasting fume dilution times and the application of recirculation techniques require accurate determination of the concentration of toxic fumes produced by

    Jan 1, 1993

  • SME
    Blasting Mechanics ? Introduction

    By L. Donovan Clark

    The term "powder factor" is almost universally accepted as the measure of the efficiency of a blasting program. It represents the economics of blasting since it designates quantity of explosive (there

    Jan 1, 1970

  • SME
    Blasting Practices At Die Mining Company

    By Edward J. Karkoska

    The film you see is a slow motion view of a typical half million ton taconite blast at one of Erie's mines. This blast is made up of 220 drill holes and a total of 325 thousand pounds of blasting

    Jan 1, 1969

  • SME
    Blasting Practices At The Cannon Mine

    By C. J. Gilbert

    The mining method at the Cannon Mine uses heading and bench stopes, which are subsequently backfilled with cemented high-strength fill prior to pillar removal. The dimensions of the pillars, 24 feet w

    Jan 1, 1989

  • SME
    Blasting Practices Updated at Cannon Mine

    By Clark J. Gilbert

    The mining method at the Cannon mine uses heading and bench stopes, which are subsequently backfilled with cemented high-strength fill before pillar removal. The dimensions of the pillars are 7.3 m wi

    Jan 1, 1990

  • SME
    Blasting Techniques And Safeguards Used In Enlarging The Underground Powerhouse At Salto De Villarino, Spain

    By J. Y. Perez, H. M. Ewoldsen, L. L. Oriard

    Near the village of Villarino de los Aires, in the province of Salamanca, Spain, is an existing underground hydroelectric power plant. A major enlargement was undertaken to increase the electrical gen