Construction Of Large Diameter Shafts With Reinforced Concrete Ring Beans
By Daniel L. Hanson
This paper presents case histories of the construction of four large diameter circular shafts using reinforced concrete ring beams as the primary internal support system. The case histories pertain to
Jan 1, 1987
-
Construction of Leach Pads on Steeply Sloping Ground
By Nancy C. Shaver, Alan Tapp
Leach pads of 272,000 tonnes (300,000 st) and 910,000 tonnes (1,000,000 st) with associated operating ponds have recently been constructed on sidehill locations with up to 20 percent slopes. The large
Jan 1, 1987
-
Construction Of Longueuil "Centre" 4.0 M Diameter Interceptor In The Montreal Area
By Rudy Scarabelli, John R. Wagner
At one time explosives were the only economical means of rock tunnel excavation. Except in relatively long tunnels in the right rock explosives are still the cheapest means of rock excavation where th
Jan 1, 1987
-
Construction Of Louisville Water Company?s Riverbank Filtration Tunnel And Pump Station Project
By S. Holtermann
Through the process of Riverbank Filtration (RBF), the Louisville Water Company plans to obtain a higher quality source of water for their B.E. Payne Water Treatment Plant (WTP) by means of four colle
-
Construction of Nine Shafts for the Manhattan Section of the New York City Water Tunnel No. 3
By Yifan Ding, Shemek Oginski, Patrick Finn
The Manhattan section of the New York Water Tunnel No. 3 constructed by the Schiavone/Shea/Frontier-Kemper Joint Venture is a $668 million project. The contract includes a tunnel drive of 8.85 km (29,
Jan 1, 2007
-
Construction of Oroville Dam - A Material Handling Challenge
By Robert Walker
The win theme of this session is Unique Material Handing Systems. The theme was selected because of two major factors. 1. Accomplishments of unique character manage to attract interest regardless o
Jan 1, 1970
-
Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021
By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger
The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of
Jun 13, 2021
-
Construction Of Pacific Gas And Electric Company's Kerckhoff-2 Underground Hydro-Electric Project 1980-1983
By Earl M. Woodward
INTRODUCTION Kerckhoff-2 is a 140 MW underground hydro-electric project designed and owned by Pacific Gas and Electric Company and constructed between May, 1980 and May, 1983 by Auburn Constructors
Jan 1, 1983
-
Construction Of Port Huron, Michigan Intake Shaft
By D. E. Piggott, B. E. Hartmann
The thought of constructing an intake shaft five miles from the shore and 142 feet below the surface of Lake Huron from the bottom up sounds like a questionable venture. Why would one want to raise
Jan 1, 1974
-
Construction of Portals for Adits at Stillwater Mining Company’s East Boulder Project
By Hendrick A. D. Kirsten, A. Clayr Alexander
Stillwater Mining Company is currently developing a second underground palladium and platinum mine approximately 21 km (13 miles) west of their existing Nye operation in the Bear tooth Mountains of so
Jan 1, 2001
-
Construction Of Section E-ld Greenbelt Route Tunnels, Washington, DC
By Charles E. Mergentime, J. Marshall Dean
Mergentime/Loram's extension of the Washington, DC Metro Subway System includes construction of dual 1,770-foot tunnels in soft ground, a crossover structure, a fan structure and pumping station,
Jan 1, 1985
-
Construction Of Shin-Kanmon Tunnel On Sanyo Shinkansen
By Kazuo Magata, Hirohiko Fujita, Masazumi Tashiro, Yoshiaki Sato, Yoshio Shinoda
The Shinkansen of the Japanese National Railways (JNR) presently in operation between Tokyo and Hakata, approximately 1,000 km, was constructed at three stages: between Tokyo and Shin-Osaka opening in
Jan 1, 1976
-
Construction Of Southwest Interceptor #3 And #4 Cleveland, Ohio
By Lawrence M. Lenahan
Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two con
Jan 1, 1989
-
Construction Of Straight Creek Tunnel, Colorado
By R. C. Hopper, A. A. Mathews, T. A. Lang
DESCRIPTION OF PROJECT The Straight Creek Tunnel site is located approximately sixty (60) miles west of Denver, Colorado, on Interstate Route 70 in the vicinity of Loveland Pass, in the Rocky Mount
Jan 1, 1997
-
Construction of TBM-Mined Segments of the Sister Grove Outfall Pipeline - RETC2023
By Ricky Chipka, Roshan Thapa, Richard Yovichin, Greg Rogoff, Patrick Niemuth
A 4.5-mile-long, 96-inch-diameter outfall pipeline was constructed between North Texas Municipal Water District’s proposed Sister Grove Regional Water Resource Recovery Facility and the Stiff Creek Di
Jun 13, 2023
-
Construction Of The 1122 / 1130 Tunnels on the Superconducting Super Collider Project
By Tom B. Corry
INTRODUCTION Located approximately 48 km (30 miles) south of Dallas, Texas, use to be the site of the Superconducting Super Collider. For those of you unfamiliar with the project, this was a multi-
Jan 1, 1995
-
Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio
By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert
PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with
Jan 1, 2007
-
Construction of the Bypass Tunnel for the Upper Llagas Creek Flood Protection Project - RETC2023
By Clayton Williams, Dale M. Hata, Glenn M. Boyce
The Upper Llagas Creek Flood Protection Project in Northern California encompasses portions of the communities of Morgan Hill and Gilroy, and unincorporated areas of Santa Clara County. The project pr
Jun 13, 2023
-
Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”
By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla
One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently
Jan 1, 2007
-
Construction of the Combined Sewage Overflow Tunnel for the City of Fall River
By Shemek Oginski
The 5 km (16,194 lf) of 6.1m (20 ft) diameter TBM driven tunnel built by the J.F.Shea Co. will serve as sewage overflow storage. The TBM tunnel and four connecting tunnels excavated by drill and blast
Jan 1, 2005