Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Estimation Of Incremental Haulage Costs By Mining Historical Data And Their Influence In The Final Pit Limit Definition
By R. Benito
This paper describes the application of modern data-analysis tools, such as data mining, to determine a representative cost driver for haulage activity. This cost driver was subsequently used to trace
Jan 1, 2008
-
Estimation Of Joint Set Characteristics From Surface Mapping Data
By J. P. Savely, D. E. Nicholas, R. D. Call
Slope stability is a probabilistic phenomenon and as such should be analyzed with probabilistic methods. Fracture orientations alone, insufficiently model the rock mass. Other parameters describing th
Jan 1, 1977
-
Estimation of Leakage Quantity for Long Auxiliary Ventilation Systems
By Pierre Mousset-Jones, Felipe Calizaya
This paper summarizes the current research trends in the ventilation design for the construction of very long tunnels, and presents the results of leakage flow measurements in three auxiliary ventilat
Jan 1, 1997
-
Estimation of marine mineral reserves
By R. H. T. Garnett
Reserve estimation is a process that commences with sampling and culminates in the issuance of a reserve statement. The tin, gold and diamonds that occur as marine placers on the continental shelf are
Jan 1, 1999
-
Estimation of Metabolic Heat for Refuge Alternative Testing
By T. E. Bernard
"Refuge alternatives (RA) provide shelter to miners trapped underground during a disaster. RA manufacturers must demonstrate that their RAs meet the Mine Safety and Health Administration (MSHA) requir
Jan 1, 2017
-
Estimation of Metabolic Heat Input for Refuge Alternative Thermal Testing and Simulation
By T. E. Bernard
"Refuge alternatives provide shelter to miners trapped underground during a disaster. Manufacturers must demonstrate that their refuge alternatives meet the U.S. Mine Safety and Health Administration
Jan 8, 2018
-
Estimation of model parameters for liberation and size reduction
By G. T. Adel, W. Z. Choi
In previous work at Virginia Tech, a population balance-model describing the simultaneous processes of size reduction and mineral liberation has been developed. Experimental verification of this model
Jan 1, 1987
-
Estimation Of Model Parameters For Liberation And Size Reduction (de0f962a-a1d7-457f-8f47-7eb580e50c1d)
By W. Z. Choi
In our previous work, a population balance model describing the simultaneous processes of size reduction and mineral liberation has been developed. The experimental verification of this model, however
Jan 1, 1987
-
Estimation of Optimum Line of Extraction for Continuous Miner Workings and Development of Continuous Miner Stability Index (CMSI) using 3D Numerical Modeling and Statistical Approach
By Sunil Bodakunta, Sreenivasa Rao Islavath
The abstract highlights the importance of determining the optimum line of extraction in continuous miner workings for improved safety and productivity. The study investigates three extraction techniqu
Apr 28, 2022
-
Estimation of Ore Mineralogy from Analytical Analysis of Iron Ore
By S. Mohanan, C. R. Kumar, S. K. Bhoja, T. Venugopalan
"A pressing issue that has often been the topic of discussion in iron-making operations in India is the high content of alumina in the country’s iron ore deposits. The presence of alumina has hampered
Jan 1, 2015
-
Estimation of pre-mining conditions for trace metal mobility in mineralized areas: An overview
By Charles N. Alpers, D. Kirk Nordstorm
A variety of approaches have been used in the recent literature for the estimation of pre-mining (or natural background) metal concentrations in areas affected by mining. The following is a list of so
Jan 1, 2000
-
Estimation of pulp viscosity and grinding mill performance by means of mill noise measurements
By S. D. Morrison, J. L. Watson
It is well known that the density and viscosity of a mill pulp have optimum levels for grinding efficiency, and sophisticated control loops are employed to control pulp density in industry. However, t
Jan 1, 1987
-
Estimation of Reaction Heat in Ti-Bearing Blast Furnace Slag—Sulfuric Acid System Based on Mechanical Mixture Model "Mining, Metallurgy & Exploration (2021)"
By Fan Yang, Meigui Yi, Lan Xiang, Zhuoying Yang
This paper reported the calculation of the reaction heat in titanium-bearing blast furnace slag (abbreviated as TBFS)-H2SO4 system based on estimation of thermodynamic data of CaTiAl2O6 by mechanical
Feb 1, 2021
-
Estimation Of Resuspension Of Radioactive Aerosols In Equipment Cab Of Open-Pit Uranium Mining
By J. W. Markham, M. Atiemo, K. Yoshida
INTRODUCTION In open-pit mining of high grade ores, operators of mining equipment in a pressurized cab are protected from inhaling radioactive aerosols by the use of filtered air through a pre-impa
Jan 1, 1981
-
Estimation Of Roof Strata Strength In Mine Roof Geology Information System (MRGIS)
By D. X. Tang, G. Wilson, S. S. Peng
Design and implementation of a roof bolting plan requires reliable geotechnical information of strata, such as rock strength, and locations of interfaces and voids/fractures. The drilling parameters o
Jan 1, 2006
-
Estimation of Seabed Surface Areas from ROV Oblique Still Images
By Aldino Campos, Frederico Carvalho Dias, Pedro Madureira, Patrícia Conceição, José Gomes-Pereira, Inês Tojeira, Andreia Afonso, António Calado, Luísa Pinto Ribeiro
Since 2008, the Portuguese Task Group for the Extension of the Continental Shelf has been operating the ROV "Luso" (rated for 6000m depth) for geological sampling of the deep North Atlantic seabed, pe
Sep 1, 2014
-
Estimation of Specific Energy and Evaluation of Roadheader Performance Using Rock Properties and Bond Work Index - Mining, Metallurgy & Exploration (2021)
By Arif Emre Dursun, Ali Aras, Hakan Özşen
Specific energy (SE) is defined as the amount of work required to cut a unit volume of rock and is used to estimate the performance of excavation machines. Generally, the SE value is produced from ful
Jul 28, 2021
-
Estimation Of Support Load Requirements For Underground Mine Openings By Computer Simulation Of The Mining Sequence ? Introduction
By William G. Pariseau
The purpose of this paper is to present a design procedure for the quantitative estimation of support load requirements in underground mines. Emphasis is upon the basic features of support behavior co
Jan 1, 1975
-
Estimation Of The Cumulative Exposure To Uranium Mine Atmospheres By In VIVO Measurements Of Lead-210 In The Skull
By G. R. Laurer, J. W. Neton, C. Pomroy, N. Cohen, M. Eisenbud
INTRODUCTION In uranium miners, a causal relationship between exposure of the lung to high levels of alpha radiation and the consequential induction of bronchial carcinoma is now well-established (
Jan 1, 1981
-
Estimation of the Fluid Velocity Profile in the Stratification Zone of a Falcon Concentrator Mining, Metallurgy and Exploration
By Ratnakar Singh, Raj Kishore, Kisor Kumar Sahu, Ranjeet Kumar Singh, Ganesh Chalavadi
The Falcon concentrator is capable of separating minerals in fine size classes based on their differential density. Separation of mineral particles depends upon the fluid flow characteristics and rela