Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Geotechnical Assessment Of Skin Reinforcement In Underground Mines
By Jan A. Nemcik
Steel mesh has been used successfully for many years to control friable roof conditions and prevent loose roof and rib material from caving into the roadway. Despite its extensive use, the installati
Jan 1, 2009
-
Geotechnical Baseline Reports for Construction - Second Edition
By Randall J. Essex
The Construction Institute of the American Society of Civil Engineers recently published the second edition of a 1997 publication on geotechnical baseline reports. The new publication, called Geotechn
Jan 1, 2008
-
Geotechnical Baseline Reports?A Review
By T. Freeman
In the past ten years, the Geotechnical Baseline Report (GBR) has arguably become the key document for tunnel construction. This report not only allocates much of the risk involved with the work, it s
-
Geotechnical Baseline Reports—A State of the Practice Review
By Bart Bartholomew, Randall J. Essex
INTRODUCTION In June of 2004, at the North American Tunneling Conference in Atlanta, an all-day workshop was conducted to review the application of Geotechnical Baseline Reports (GBRs) for undergr
Jan 1, 2005
-
Geotechnical Characterization For Caisson Sinking In Medium Stiff Clay
By Michael S. Robinson, Serge Moalli
Construction of the CSO Retention - Treatment Tunnel, Segment 1 in Dearborn, Michigan includes excavation for an overflow Structure with a minimum inside diameter of 15.24 m (finished). The excavation
Jan 1, 1995
-
Geotechnical Conditions and TBM Selection for the Bay Tunnel
By Luke Erickson
San Francisco Public Utilities Commission is planning to replace 5 miles of pipeline under San Francisco Bay. The tunnel will be constructed using an Earth Pressure Balance (EPB) TBM and will be the f
Jan 1, 2008
-
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO Project
By Jean Habimana
The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather
Jan 1, 2008
-
Geotechnical Considerations In Coal Mine Planning And Design ? Introduction
By Madan M. Singh
Increasingly, geotechnical data are being collected for various types of coal development projects. In many cases, a specific design concern is addressed. However, many data collection programs are no
Jan 1, 1985
-
Geotechnical Considerations In Nuclear Power Plant Construction And Licensing ? Introduction
By James W. Mitchell
On December 2, 1942, a scientific team lead by Nobel Prize winner Enrico Fermi first initiated and controlled a self-sustaining nuclear chain reaction. This historic event occurring beneath the stands
Jan 1, 1974
-
Geotechnical Considerations In Underground Coal Gasification
By J. M. Avasthi
Gulf Research & Development Company conducted the nation's first underground coal gasification test in steeply dipping beds near Rawlins, Wyoming. The geotechnical considerations played a major r
Jan 1, 1981
-
Geotechnical Considerations No. 7 Subway Line Extension Project in New York City
By P. K. Das, S. K. Singh, C. C. Chang, E. C. Wang, R. B. Roberts
As part of the New York City’s redevelopment of the far west side of mid-town Manhattan, this project will add 1.5 miles of twin bored tunnel to No. 7 Subway Line. The proposed alignment extending fro
Jan 1, 2005
-
Geotechnical data collection and application to the Leeville underground mine - SME Transactions 2010
By Changshou Sun
The Leeville underground mine has been in operation since 2006 and currently produces 3,175 t (3,500 st) of ore per day with an average gold grade of 12.6 g/t (0.4 opst). The mine has a large horizont
Jan 1, 2010
-
Geotechnical Data Collections And Applications At The Leeville Underground Mine
By C. Sun
The Leeville underground mine has been in operation since 2006 and currently produces 3,300 tons of ore per day with an average gold grade of 0.4 opt. The mine has a large horizontal extent of 2,500 f
Jan 1, 2010
-
Geotechnical Design of Devil’s Slide Tunnel
By Y. Nien Wang, Moe Amini, Heiner Sander, Max John
INTRODUCTION As the population increased along the coast route (California Route 1), and the people’s need to have guaranteed access increased, the landslides and related road closures began to ha
Jan 1, 2005
-
Geotechnical Design Of Large Openings At Depth
By Evert Hoek
Two types of failure have to be considered in designing large openings: (a) Structurally controlled failure caused by discontinuity intersections, (b) Stress induced instability which occurs whe
Jan 1, 1981
-
Geotechnical Evaluation For the Design and Construction of Mine Projects
By Trevor A. Moss
Installation of equipment and structures at mines often requires mine planners to evaluate unique loading and operating conditions. Consideration of these unusual features is required throughout desig
Jan 1, 1992
-
Geotechnical Evaluation For The Design And Construction Of Mine Projects (4bd0c866-12e8-4d49-923c-02cf84dcd6fb)
By T. A. Moss
The installation of equipment and structures at mines often requires the evaluation of unique loading and operating conditions. Consideration of these unusual features is required throughout design an
Jan 1, 1992
-
Geotechnical Exploration for a Lake Mead Intake
By Richard F. Coon
Six potential locations along the west shore of Lake Mead were evaluated to site anew water intake pumping station for the SNWA. The evaluations were based upon geotechnical exploration results and c
Jan 1, 1997
-
Geotechnical Exploration For The H-3 Highway Trans-Koolau Tunnel
By Lee W. Abramson, William H. Hansmire
The H-3 Project is planning, design, and construction of a 10-mile (16 km)-long final segment of new highway that traverses the Koolau mountain range in Oahu. Interstate H-3 traverses North Halawa Val
Jan 1, 1989
-
Geotechnical Exploration For The Proposed Crosstown Transport Facility San Francisco, California
By Timothy N. Dunne, Joseph M. Gonzalez
This paper presents the case history of a comprehensive geotechnical investigation for the Crosstown Transport Facility, a 10,880 m long, 3.2 m diameter pressure tunnel proposed for construction in Sa
Jan 1, 1983