Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Increased Prodcution Planned at Anshan Iron and Steel

    The Anshan Iron and Steel Co. (AISC) broke its steelmaking design capacity in 1978, bringing its total production of steel products to 6.86 Mt. Located south of the industrial city of Shenyang, Liaon

    Jan 3, 1980

  • SME
    Increased Production And Cost Savings Using Delvo Stabilizer In The Cemented Rockfill Program At Williams Mine (Marathon)

    By Scott Jones, Tony R. A. Durkac, David W. Stephens

    Williams Mine was considering spending a large amount of capital to install a pumping system underground to rid the mine of slimes; with the introduction of Delvo Stabilizer this challenge would be me

    Jan 1, 2001

  • SME
    Increased Productivity Through Modern Material Handling

    By Edward C. Mabbs

    U.S. industry must increase its productivity or lose its competitive position in the rapidly expanding and inter-dependent world markets. Recent improvements in material handling techniques and equipm

    Jan 1, 1973

  • SME
    Increased Productivity Through Use Of High Density Ammonium Nitrate Blasting Agent

    By J. C. Adams

    Although explosives constitute only a small portion of a mine's total cost, the relative success of each blast has a tremendous effect on subsequent activities such as excavation, crushing, and e

    Jan 1, 1996

  • SME
    Increased Recovery From Preg-robbing Gold Ore At Penjom Gold Mine

    By Gordon Lewis

    The Penjom Gold Mine is one of the world's worst preg-robbing gold ores, yielding very low recoveries from traditional CIL methods. Gold recovery from the cyclone underflow was targeted to recover as

    Jan 1, 1999

  • SME
    Increased Safety, Better Production Through Use Of Electronic Communication And Electronic Equipment

    By Earl A. Berry

    Someone once said, "The safest mine is one in which no one goes into." We all recognize this as being perhaps wishful thinking. We also recognize in it a certain amount of truth and an ultimate goal i

    Jan 1, 1958

  • SME
    Increased TBM Mobility and Adaptations for Special Projects

    By Dennis Ofiara

    Several recent tunnel jobs have required special adaptations of hard rock TBMs. Some of the special job conditions are ?no blast? launch requirements, small shafts or launch pits, proximity to existin

    Jan 1, 2008

  • SME
    Increased value of refined high sulfur coal

    By P. R. Dugan

    Sulfur removal from high sulfur coal has several objectives including: a) reduction of the atmospheric load that contributes to the problem of acid precipitation; b) reduction of ash, which contribute

    Jan 1, 1988

  • SME
    Increasing Autogenous and Semi-Autogenous Mill Capacity Through Grinding Process Optimization

    By Y. C. Lo

    Grinding process optimization is an exciting new tool for maximizing the performance of existing mineral processing plants. This paper discusses the methodology of optimization which involves plant sa

    Jan 1, 1998

  • SME
    Increasing Availability through Advanced Gearless Drive Technology (581a2310-147b-4546-9b01-72b08d1517e0)

    By C. Dirscherl

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2015

  • SME
    Increasing Availability through Advanced Gearless Drive Technology (bdb34c0f-eece-4038-82e2-fac055da3c4a)

    By C. Dirscherl

    "Declining ore grade, leading to increased material transport and plant throughput requirements, is one of the major challenges in the current mining environment. This is accompanied by rising energy

    Jan 1, 2015

  • SME
    Increasing Coarse Particle Recovery Using The Flsmidth Selective Froth Recovery System

    The recovery of coarse particles has been widely recognized as being limited by the froth in mineral flotation. In response to this, FLSmidth has developed the Selective Froth Recovery (SFR) System.

    Feb 27, 2013

  • SME
    Increasing Effectiveness of Mine Safety Training Using Inexpensive Camera and Rendering Technology

    By M. A. Trevits, G. Frampton

    "Mine safety training materials have long included pictures of mine conditions, equipment, hazards, etc. These images are invaluable to both the trainee and the trainer to convey many important concep

    Jan 1, 2018

  • SME
    Increasing Energy Efficiency Of Grinding Media Through Microscale Comminution Studies

    By G. A. Goller, Y. C. Lo

    Microscale studies involving an ultrafast load cell have been shown to provide direct and accurate measurements of particle strength, particle fracture energy and particle breakage functions under dif

    Jan 1, 1995

  • SME
    Increasing Germanium Extraction From Hydrometallurgical Zinc Residues

    By D. D. Harbuck

    Previous studies at the US Bureau of Mines (USBM) have shown that only 70% to 80% of the germanium in domestic zinc process residues can be extracted during H2S04 leaching. To increase germanium extra

    Jan 1, 1994

  • SME
    Increasing Germanium Extraction From Hydrometallurgical Zinc Residues (38962cf7-6d65-42bb-b09b-1f430c16cf9a)

    By D. D. Harbuck

    Previous studies at the U.S. Bureau of Hines have shown that only 70 to 80% of the germanium in domestic zinc process residues can be extracted during H2S04 leaching. To increase germanium extraction,

    Jan 1, 1991

  • SME
    Increasing Importance of Countertrade

    By Raymond W. Peterson

    The practice of Countertrade and all of its variations has increased dramatically during the last five years in great part due to the worsening world economic situation and the Third World's incr

    Jan 1, 1986

  • SME
    Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 M/Sec (28 Ft/Sec)

    By Poltak Sinaga

    PT Kaltim Prima Coal?s 13-km (8-mile) overland conveyor (OLC) was commissioned in 1991. It is a conventional three-roller, 35 degree trough belt type. Cost and performance optimization during initial

    Jan 1, 2009

  • SME
    Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 MPS

    By Poltak Sinaga

    PT Kaltim Prima Coal?s 13.1 km overland conveyor (OLC) was commissioned in 1991. It is of conventional 3 roller 350 trough belt type. Cost and performance optimization during initial design ended up w

    Jan 1, 2008

  • SME
    Increasing Kaltim Prima Coal Overland Conveyor Speed To 8.5 Mps (30155423-28d4-4121-901f-0069696f7abd)

    By Poltak Sinaga

    PT Kaltim Prima Coal's 13.1 km overland conveyor was commissioned in 1991. It is of conventional 3 roller 350 troughed belt type. Cost and performance optimisation during initial design ended up

    Jan 1, 2008