Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • SME
    Fundamental Aspects Of Gold Cyanide Adsorption On Activated Carbon

    By C. Klauber, H. G. Linge, W. G. Jones

    The carbon-in-pulp process for gold processing depends on the adsorption of dissolved Au(CN)2- from solution onto activated carbon. Our work shows that coconut and peat based carbons have the same mec

    Jan 1, 1989

  • SME
    Development And Extinguishment Of Oil Shale Rubble Fires

    By M. J. Sapko

    The Bureau conducted, through joint funding with the Colorado Mining Association, large scale oil shale rubble fire tests to investigate flotability characteristics and different methods of extinguish

    Jan 1, 1989

  • SME
    Construction Of Southwest Interceptor #3 And #4 Cleveland, Ohio

    By Lawrence M. Lenahan

    Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two con

    Jan 1, 1989

  • SME
    Present Standing and Future Challenges In Biorydrometallurgy

    By Arpad E. Torma

    The introduction of biotechnological principles in hydrometallurgy has created new opportunities and challenges for the industry of mineral processing. During the 1950's and 608s, the mining wast

    Jan 1, 1989

  • SME
    Whither Gravity, Magnetic and Electrostatic Separations?

    By F. F. Aplan

    Estimations have been made of the tonnage of raw ores and coal treated by various beneficiation processes. The amount treated by gravity concentration is substantially greater than that treated by flo

    Jan 1, 1989

  • SME
    Evaluation Of The New Truck Dispatching In The Mount Wright Mine

    By F. Soumis

    This paper describes an integrated procedure for the very short term production planning of an open pit and the execution of this plan: the truck dispatching. Integration of plan and dispatch means th

    Jan 1, 1989

  • SME
    Adjustment Of Mine Ventilation System Parameters

    By Randal J. Barnes, Franck Rellier

    Mine ventilation survey data includes generally redundant, usually inconsistent, often incomplete, and always noisy measurements. Yet, these data are essential for operational decisions and represent

    Jan 1, 1989

  • SME
    Methane Occurrences In The Carsington Aqueduct Tunnel Project – A Case Study

    By Julian S. Edwards, C. Frederick C. Pearson, Sevket Durucan

    Information gained at the site investigation stage of the Carsington aqueduct project led the designers to suspect that methane might be encountered during tunnelling and therefore gas detection techn

    Jan 1, 1989

  • SME
    Discussion – Degradation process in coal slurry pipelines – by M. G. Ayat and B. C. Scott Technical Papers, MINING ENGINEERING, Vol. 40, No, 9. September 1988, pp. 885-888

    By M. Albrecht

    I have been following the discussions on coal degradation started by the article "Degradation process in coal slurry pipe-lines," by M.G. Ayat and B.C. Scott. I agree with Mr. Dasher's comment

    Jan 1, 1989

  • SME
    A CAD - approach to mine planning and production scheduling in surface mines

    By G. H. Jardine

    Mine planning and production scheduling in surface mines are basically iterative processes which are ideally suited to the use of computer-based techniques. Both processes are truly three-dimension

    Jan 1, 1989

  • SME
    Evaluation Of Progressive Rib Failure In Thick Coal Seams

    By W. C. Smith

    Even with the most conservative mine plan, rib instability can occur unexpectedly, and if not adequately dealt with, can progress from a nuisance to a major safety hazard. This Bureau of Mines paper e

    Jan 1, 1989

  • SME
    Technical Note - Novel design for a thin seam shuttle car featuring an ergonomic operator compartment

    By W. D. Mayercheck, A. G. Mayton, J. R. Bartels

    Abstract-Since 1982, the US Bureau of Mines has inves¬tigated improvements in protection for operators of thin seam shuttle cars. Due to working height restrictions in thin seam mines (<_1.22 m or 48

    Jan 1, 1989

  • SME
    Magnetic Coalescence Of Hematite And Magnetite

    By Q. Xu

    The new process consists of the selective coalescence of fine hematite particles by fine magnetite. The gangue minerals are dispersed by some dispersant; thus it can be separated by desliming. This pr

    Jan 1, 1989

  • SME
    Investigation Of A Large-Scale Coal Pillar Failure (1d227dbd-e114-416e-a218-a26bd608b157)

    By N. S. Tanious

    This paper summarizes the results of an investigation into possibly the largest coal pillar failure in the USA. The newly opened drift mine is located in Southeastern Kentucky and worked an 11 feet th

    Jan 1, 1989

  • SME
    Eurotunnel - UK Side Plant

    By C. J. Kirkland

    The paper describes the arrangements for the casting, curing and handling at the casting yard, of the concrete segments for the lining of the UK half of the tunnel, and the plant used for the handling

    Jan 1, 1989

  • SME
    The Impact Of Assay Based Control And Target Oriented Process Control On Concentrator Economics

    By D. R. Barker

    The economic performance and competitiveness of a concentrator are dependent on the production of accurate real-time assay information and the manner in which it is utilized. Our paper describes the

    Jan 1, 1989

  • SME
    Bond Gold Colosseum Inc. Crushing And Grinding: An Update

    By R. L. Beatty

    The Bond International Gold (BIG) Colosseum Gold Mine was discovered in 1865, but no recorded production occurred until the 1930&apos;s, with production approximately 19k9 (615 oz) of gold. The mine w

    Jan 1, 1989

  • SME
    An Introductory Review - Investment and Project Evaluation

    By R. V. Ramani

    It is common knowledge that there is an endless stream of possibilities, proposals, and projects - each representing a demand on available capital - for improving the mining company&apos;s performance

    Jan 1, 1989

  • SME
    Mine And Surface Facility Closure

    By D. H. Warren

    This presentation we hope will provide you with an orderly approach co mine and surface plant closure taken from our experience over the past several years on six different projects within the intermo

    Jan 1, 1989

  • SME
    Discussion – In situ leaching of disseminated gold deposits—geological factors by J. G. Wargo Technical Papers, MINING ENGINEERING, Vol. 40, No. 10 October 1988, pp. 973-975

    By J. D. Megeath

    In the October 1988 issue of MINING ENGINEERING, J.G. Wargo&apos;s paper discusses the problem of measuring and analyzing permeability, porosity, and fracturing in its relation to in situ leaching of

    Jan 1, 1989