Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
-
Investigation Of Explosion Hazard In Longwall Coal Mines By Combining Cfd With A 1/40th-scale Physical Model
By A. Juganda, F. WILSON, G.E. BOGIN, H. PINHEIRO, N. SANDOVAL, J.F. BRUNE
To evaluate methane explosion hazards in underground longwall coal mines, researchers at the Colorado School of Mines developed a computational fluid dynamics (CFD) model along with a 1/40th-scale, op
Dec 1, 2022
-
Analysis Of Steel Prop Supports Subjected To Vertical And Lateral Loading
By Timothy Batchler, Khaled Mohamed
Standing supports have been used in coal mines for decades to enhance roof support capability. Occasionally, standing supports are used to resist the lateral movement of spalled ribs. Researchers from
Dec 1, 2022
-
Tunnel Load Rating—A Case Study: Port of Miami Tunnel - NAT2022
By Ali Kazmi, Wern-ping N. Chen
A load rating procedure was performed to evaluate safe load capacity of the Port of Miami Tunnel (POMT), FDOT Tunnel No. 871071 SR 887. The rating procedure performed on a total of eleven stations ben
Dec 1, 2022
-
Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022
By John Newby, Edward Kennedy, Ulf Gwildis
Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi
Dec 1, 2022
-
Analysis of Near Field Vibration Monitoring in Construction Blasting - NAT2022
By Jim Buckley, Ryan Sibley, Scott G. Giltner, Thomas Pallua, Joe Schrank, Robert Cidlik
Because of variation in rock type and site conditions, it is important to create site-specific prediction models for peak particle velocity (PPV) and understand instrumentation mounting locations to b
Dec 1, 2022
-
Long Distance Tunnelling: Challenges and Trends - NAT2022
By Karin Bäppler
Mechanized tunnelling is undoubtedly one of the most innovative disciplines in the international construction industry. Technological progress in the planning and production of most modern infrastruct
Dec 1, 2022
-
TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022
By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell
As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic
Dec 1, 2022
-
Flow Control in Tunnels - NAT2022
By Darold Woodward, Stefan Haydn, Petr Pospisil
Most fatalities in tunnel fires are caused by the spread of toxic smoke. Controlling the spread of smoke is crucial to provide a survivable environment for emergency egress. A properly designed and tu
Dec 1, 2022
-
Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022
By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley
Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t
Dec 1, 2022
-
E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022
By Peter Schmäh, Tobias Engel
The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p
Dec 1, 2022
-
The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022
By B. Catalano, D. Ifrim
The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel
Dec 1, 2022
-
Updating the GBR Gold Book - NAT2022
By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex
Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help
Dec 1, 2022
-
San Diego Courthouse Commons Tunnel: Challenges and Design Solutions - NAT2022
By Jeremy Stone, Yiming Sun, John Stolz
The Courthouse Commons Tunnel facilitates the secure transfer of inmates between the County Jail and State Courthouse across a city block in downtown San Diego, California. This shallow tunnel was exc
Dec 1, 2022
-
Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022
By M. Trim, Y. Sun, D. Tepavac, A. Kumar
Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse
Dec 1, 2022
-
Karst Feature Investigation, Mitigation Design, Specification, and Contract Provisions - NAT2022
By Alissa Lockett, Chris D. Breeds
Central Water Integration Project (CWIP) Segment 5-1 is the most critical segment of a regional water supply project that transfers groundwater from Burleson County to northern San Antonio, replacing
Dec 1, 2022
-
Innovative Approach for Dust Control in Tunnel Construction - NAT2022
By Craig Allan
Underground construction environments, especially those with limited airflow such as shafts, cross passages, and stations, necessitate effective dust control. This requires combining existing measures
Dec 1, 2022
-
Commuter Rail Tunnel Alignment Studies for the Pennsylvania Avenue Extension, San Francisco - NAT2022
By Sarah Wilson, John Kaplin
Plans are underway to extend commuter rail service underground into downtown San Francisco. The Salesforce Transit Center (STC) was completed in 2018 and will serve as a new transit hub, including a c
Dec 1, 2022
-
Out with the Old, In with the New: How We’ve Come Full Circle from the Burning River - NAT2022
By Ben DiFiore, Richard DePew, Nate Long, Adrian Naranjo-Castillo, Chris Petta, Robert Auber
The Walworth Run stream was brick-culverted in the 1800s, converting it to a 16-ft diameter sewer. This Cuyahoga River tributary contributed to the infamous burning river that became the catalyst for
Dec 1, 2022
-
Automation in Segment Production and Integration of Artificial Intelligence - NAT2022
By Stefan Mede
Automation in segment production doesn’t necessarily mean the use of robots. Several other aspects of automation in the process are available. Herrenknecht has collected many experiences in the automa
Dec 1, 2022