Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Recent Projects - Hilton Hotel Beirut, Lebanon Shot Date: Sunday, July 14, 2002
By Stacy Loizeaux
The Beirut Hilton Hotel, which was built in 1975, but never occupied, was imploded on Sunday, July 14, 2002 by Controlled Demolition, Inc. (CDI) of Phoenix, Maryland and their client, Optimal Engineer
Jan 1, 2003
-
Competing Processes of Hardening and Softening during Strain Aging of Mild Steel
By I. E. A. Aghachi
During static strain-aging of low carbon steel, when the material is pre-strained, the dislocation density increases. If totally or partially unloaded and aged for a prescribed time, interstitial solu
Jan 1, 2003
-
Land Reclamation Of Lignite Mines In The Ptolemais-Amynteon Area, Macedonia, Greece
By A. Foscolos
Land reclamation and rehabilitation of depleted coal mines in the wider area of Ptolemais-Amynteon is practiced by the Division of Mines of the Public Power Corporation of Greece in order to conform t
Jan 1, 2003
-
Raman Investigation Of Sulfide Leaching
By Gretel Parker
In situ Raman spectroscopic investigations of copper iron sulfides in leach solutions have been undertaken. Coupling potentiodynamic techniques to Raman spectroscopy produces a powerful tool for study
Jan 1, 2003
-
New Approach. for the Optimization of Copper Concentrates.,Flash Combustion through the Control of the Blends and Slag Composition (Invited) (Abstract Only)
By Roberto Parra
The operational control in a Flash Smelting Furnace is based on the mass and energy balance of the chemical and mineralogical composition of the concentrates. It is well known that many troubles in th
Jan 1, 2003
-
Parameters for Control and Optimization of Bioleaching of Sulfide Minerals (Invited)
By H. Deveci
Bioleaching/biooxidation is essentially a dissolution process with the involvement of acidophilic bacteria acting as the "catalyst" to accelerate the dissolution of metals from sulfide minerals. The c
Jan 1, 2003
-
General Work Input Function For Sizing Grinding Ball Mills
By A. R. Zambrano
Equations for power draft, capacity and work input for predicting the performance of industrial grinding mills are derived based on torque measurements using a laboratory instrumented mill. These deri
Jan 1, 2003
-
Aspects of Sustainability Following Closure of the Steep Rock Iron Mines, Ontario
By Victor A. Sowa
"Abstract - In 1938, a body of goethite and hematite was discovered beneath Steep Rock Lake near Atikokan, northwestern Ontario. This was at the time the largest and richest undeveloped iron ore body
Jan 1, 2003
-
Progress And Problems In The Modeling Of Non-Ferrous Processes (Keynote)
By Arthur E. Morris
Fifty years ago when Professor Yazawa began his career, the field of process simulation and modeling was in its infancy. Since then, tremendous progress has been made in our ability to model metal pro
Jan 1, 2003
-
Internal Carbon Addition During Hematite Fluxed Pellet Production At The Tilden Mine
By P. J. Suardini, T. E. Seppanen, M. J. Hanninen
In order to reduce the heat loading in the Tilden Mine kilns caused by burning coal, which in turn resulted in rapid and significant build-upon the kiln lining, internal carbon was added to the green
Jan 1, 2003
-
Copper Concentrate Leaching Developments By Phelps Dodge Corporation
By John O. Marsden
In early 1998, Phelps Dodge embarked upon a program to investigate alternative technology for the extraction and recovery of copper, and other metal values, from copper concentrates. A review of all
Jan 1, 2003
-
Cliff-Hanger - Blasting Near the Edge
By N Elith
Coal is a valuable energy source in New Zealand and has been mined from the West Coast for over 100 years. Stockton Mine is New Zealand's largest opencast coal producer supplying around 1.5 Mt of
Jan 1, 2003
-
Qualitative Simulation of Continuous-Flow Technology and Working Face Complexes for Underground Mining of Hard Ores
By G A. Streltsova
In the paper the main concept of qualitative simulation is determined when computer-aided designing and forecasting of designs of robotised continuous-flow working face complexes for underground minin
Jan 1, 2003
-
Activated Alumina For The Removal Of Selenium From Heap Leach Detoxification Solutions
By R. W. Smith, K. A. Altman
The use of activated alumina for the removal of selenium from heap leach detoxification solutions was studied at a laboratory scale. Three different aluminas were studied, one unmodified and two chemi
Jan 1, 2003
-
Design Concepts and Operation of Mercury Retort Systems
By Charles Washburn
The authors review mercury sources, and contaminant streams, with particular emphasis on mercury that is extracted from precious metal ores. The design and operation of both large and small mercury di
Jan 1, 2003
-
Purification Of Laterite Leach Solutions By Direct Solvent Extraction (Invited)
By Chu Yong Cheng
The solvent extraction (SX) processes of the three pressure acid leach (PAL) nickel plants in Western Australia have been reviewed. The use of intermediate precipitation, solids/liquid separation and
Jan 1, 2003
-
Environmental Education In Mining Engineering Curricula: Perceptions Of Practicing Engineers
By J. M. Mutmansky
This paper outlines the results of a study of the opinions of practicing engineers concerning the value of environmental engineering courses in a mining engineering curriculum. One hundred engineers w
Jan 1, 2003
-
Remediation Strategies for Acid Mine Drainage at Sullivan Mine, West Coast, New Zealand
By K Gordon, A Black
Two remediation strategies have been considered to reduce the levels of acidity and dissolved metals in acid mine drainage discharging from Sullivan Mine, West Coast, New Zealand. The oxidising strate
Jan 1, 2003
-
The use of mixed integer linear programming for long-term scheduling in block caving mines
By G. van Hout, D. Rahal
Caving is a mass mining method that is normally applied to large, low grade orebodies because of its low production cost and high capacity. However, equipment breakdown and poor draw management can ca
Jan 1, 2003
-
Properties of excavation damaged zone caused by drill and blast excavation
By J. Autio, H. Malmlund
The excavation damage zone (EDZ) caused by drill and blast excavation consists of intense damage adjacent to the remaining half barrel of the blast hole, new fracturing induced by the blast and reacti
Jan 1, 2003