Search Documents

Sort by

  • CIM
    Uncertainty in the Rock Engineering Design of Post-Tensioned Anchors for Dams

    By B. Panton, J. Carvalho, E. T. Brown

    High-capacity, post-tensioned anchors have found wide-spread use in initial dam design and construction, and in the strengthening and rehabilitation of concrete dams to meet modern design and safety s

    Jan 1, 2015

  • CIM
    Evaluation of the Thermal Induced Damage of Rocks

    By J. G. Kim, B. G. Chae, D. S. Cheon, E. S. Park

    The underground structures such as high-level radioactive waste disposal thermal energy storage should be designed and constructed considering thermal-mechanical characterization because of long term

    Jan 1, 2015

  • CIM
    Performance and Cost Comparison of Materials Used in Design and Fabrication of Hydrometallurgical Equipment

    By T. Johnson, K. Lambrych, D. Kelley

    Materials for construction of equipment used in hydrometallurgical plants are selected based on a combination of their ability to perform as required in aggressive process environments as well as thei

    Jan 1, 2015

  • CIM
    Damage Mechanism of Drawbell in Underground Mines under Repeated Impact Loading

    By Libao Zhu, David J. Williams, Nazife Erarslan

    "Statistics show that the drawbell in underground mines is usually subjected to significant damage by impact loading due to falling ore. Drawbell damage causes a large quantity of residual ore to rema

    Jan 1, 2015

  • CIM
    Measurement by the New Borehole Inclinometer Using FBG Optical Fiber Sensors for Slow Moving Rock Slope

    By H. Kuno, H. Kobayakawa

    A borehole inclinometer with FBG optical fiber sensors has been developed to clarify very slow slope movements, and the results of its application to a real slope have been shown. The main characteris

    Jan 1, 2015

  • CIM
    Shear-Bond Strength of Thin Spray-on Liners as a Surface Support Mechanism in Underground Rock Support – A Review

    By D. Kalumba, S. Jjuuko

    "Thin Spray-on Liners resist relative small deformations (< 1 mm) between rock blocks or fragments in terms of a combination of shear, adhesive and tensile-bond strengths. Shear-bond strength addresse

    Jan 1, 2015

  • DFI
    Outline and Application Example of Deep Mixing Meeting High Quality and High Efficiency-Execution

    By Hidekatsu Takeuchi, Masaru Sakakibara, Shigeo Tanabe, Kenji Harada, Akihiko Suzuki, Shoji Morihana

    "Deep mixing (DM) method, one of the most commonly used solidification methods, is based on the principle of solidifying soft ground. It can be classified into two categories such as Cement Deep Mixin

    Jan 1, 2015

  • CIM
    Development of the SII “Mission” Mineral Sands Project

    By D. Settles, R. Rose, P. L. Dunn

    "A new mineral sands operation is being developed in Georgia by Southern Ionics, Inc. (SII). Prevailing mineralogy and certain design constraints required detailed testing and circuit analysis to cre

    Jan 1, 2015

  • SME
    Development of a Dust Sample Collection Prototype for Use in Underground Coal Mines

    By T. Rockley, B. Goertz, S. McDaniel, J. Brune, K. Bakhsh

    "Researchers at the Colorado School of Mines, under a project funded by the Alpha Foundation, have developed a working prototype of a dust sample collection device designed to determine if sufficient

    Jan 1, 2015

  • CIM
    Corefco Leach Residue Re-Processing: Testwork and Commercial Considerations

    By A. Mosqueda Martinez, L. C. Trytten, R. P. Kofluk, J. J. Budac

    The Corefco ammonia leach nickel refinery treats Ni-Co mixed sulphides from the high-pressure acid leaching of Moa Bay nickel laterite. Due to the low iron content of the feed, the ammonia leach proc

    Jan 1, 2015

  • SME
    The Selective Leaching and Separation of Molybdenum from Complex Molybdenite Concentrate Containing Copper

    By Zhan-fang Cao, Hong Zhong, Li-feng Li, Shuai Wang, Xiao-yu Cao, Guang-yi Liu, Ming-ming Wang

    "In recent years, there has been an increasing focus on the hydrometallurgical processing of molybdenite, with the decline of high-grade and easily handled molybdenum minerals. In this work, a novel m

    Jan 1, 2015

  • CIM
    Determination of the In Situ Stress in an Continuous Anisotropic Elastic Rock Mass Using Inverse Problem Techniques

    By Eurípides do Amaral Vargas Jr., J. A. de Mello Franco

    "It is frequently necessary to excavate a tunnel for Civil Engineering purposes, or wells for petroleum exploitation, in laminated rock mass like schists or phyllites or in highly foliated gneisses. T

    Jan 1, 2015

  • CIM
    Analytical Model for Fully Grouted Rock Bolts with Multiple Joints

    By Debasis Deb, Ankur Narang, G. P. Raja Sekhar, Kamal C. Das

    "The stability of underground structures made (especially) in jointed rock mass is of the utmost important to designers, engineers and operators. Rock bolting is generally being practised to reinforce

    Jan 1, 2015

  • CIM
    Smelting Furnace Melt Zone Wall Modification to Cope Higher Production Rate Operation

    By Antonius Prayoga

    PT Smelting adopted the Mitsubishi Continuous Technology for its copper smelter plant which has been operating since 1998. Through a series of expansion projects, the plant annual production capacity

    Jan 1, 2015

  • CIM
    Application of Infrared Thermal Imagery in Lead Blast Furnace Operation

    By S. Devereaux, P. Gover, S. Everett

    Having real-time data of blast furnace burden profile with respect to burden height and temperature is critical to making informed decisions on blast furnace operation. Given the high temperature and

    Jan 1, 2015

  • CIM
    An Innovative Process for the Separation of Iron in Mixed-Chloride Medium: A Case Study for Lateritic Ore

    By M. A. Halim, V. I. Lakshmanan, Z. Jankovic

    An innovative mixed-chloride process for the separation of iron from lateritic ore is described. The separation of Fe(III) from leach liquor is an important process step for the recovery of nickel and

    Jan 1, 2015

  • CIM
    Aerophine® 3418A Promoter – The Canadian Collector – 50 Years of Improved Metallury in Various Applications

    By F. Bruey, T. Bruce, D. R. Nagaraj, W. Thomas, P. Riccio, E. Guitard

    "AEROPHINE® 3418A Promoter is a flotation collector that has been an industry standard in the Canadian mineral processing industry since its first commercial use at the Kidd Creek concentrator in 1980

    Jan 1, 2015

  • DFI
    A Full-Scale Test by Low-Improvement-Rate Soil in Combination with Crushed-Stone Mat on Peaty Ground

    By H. Hayashi, M. Yamaki, H. Hashimoto, T. Yamanashi

    "In an experiment on a trial embankment, the deformation mode of the improved ground at the toe of the embankment was compared with the deformation mode of the unimproved ground. This comparison showe

    Jan 1, 2015

  • CIM
    Predicting Nickel Recoveries at the Thompson Mill from Feed Mineralogy

    By F. D. Ford, Z. Dai, A. Byers

    Manitoba Mining and Milling operations consist of three underground mines (Thompson T1, T3 and Birchtree), feeding the Thompson Mill. Three years ago, a collaborative effort involving Mines Exploratio

    Jan 1, 2015

  • SME-ICGCM
    Time–Lapse Photogrammetric Monitoring of an Underground Stone Mine

    By Brent A. Slaker, Michael Murphy, John Ellenberger, Erik Westman

    "Photogrammetry, as a tool for monitoring underground mine deformation, is an alternative to traditional point measurement devices, and may be capable of accurate measurements in situations where tech

    Jan 1, 2015