Driven Pipe Pile Solutions for the Temporary Foundations at the New San Francisco-Oakland Bay Bridge
By Manuel M. Reyes, Thuraisamy Thavaraj, Alex Sy
"The new east span of the San Francisco-Oakland Bridge features a single tower self-anchored suspension (SAS) bridge. During construction of the SAS bridge, a temporary bridge was used to support the
Jan 1, 2015
-
Dynamic and Static Load Tests on Tapered Piles in Soils Exhibiting Time-Dependent Capacity Gain
By Terrence M. Carroll, Chu E. Ho
"A pile installation and load testing program on driven tapered piles was undertaken at John F. Kennedy International Airport in New York City for the extension of the existing Terminal 4. As part of
Jan 1, 2015
-
Dynamic Response of Short Piles under Lateral Transient Load
By Ambarish Ghosh, Rituparna Dey, Indrajit Chowdhury
"In port and harbor facilities, jetties and cargo berth terminals are usually installed on piles that remain partially embedded in soil, while a part of it behaves as columns supporting top deck. Tech
Jan 1, 2015
-
Full Scale Load Test Program Confirms the Design of a Rigid Inclusions Solution for the Support of an MSE Wall in Southern New Jersey
By Susan Rafalko, Mike Walker, John Sankey, Sherif Aziz, Alex Potter-Weight, Mary Nodine, Frederic Masse
"After several successful projects on the Garden State Parkway and New Jersey Turnpike for support of single-stage MSE (Mechanically Stabilized Earth) walls using rigid inclusions (Controlled Modulus
Jan 1, 2015
-
Low Noise and Low Vibration Tube Pile Installation by the Press-in Piling Method
By Takefumi Takuma, Hiroyuki Nishimura, Shigeru Kambe
"In order to achieve tubular pile driving with low noise and low vibration, the Press-in Piling Method has been adopted on many projects. The method utilizes reaction force derived primarily from prev
Jan 1, 2015
-
Hybrid Design Approach for Anchored Retaining Walls in Complex Geology
By Christopher J. Ramsey, Don W. Dotson
"An existing four lane section of US 27 was widened to eight lanes. The project lies in the rugged Valley and Ridge Province of the Appalachian mountains starting at the Tennessee River in Chattanooga
Jan 1, 2015
-
State of the Art Ground Improvement Technique for a Residential Complex: Case Study
By Madan Kumar Annam, Hari Krishna Y, I. V. Anirudhan
"For completion of projects in time with positive results, improvements of productivity and effective project management procedures have become extremely important. This paper discusses a milestone pr
Jan 1, 2015
-
The Effect of Helix/Wing Plate Deformation on End Bearing Resistance of Screw Piles
By Adnan A. Malik, Tadashi Maejima, Jiro Kuwano
"The use of steel screw piles has greatly increased in recent years because of the advancement in the installation mechanism and its performance under compressive, uplift and lateral loads. In a steel
Jan 1, 2015
-
The Little Lake Harris Bridge Settlement Restoration Project: Lessons Learned
By Amr Sallam, David Thompson, Moataz Hassan
"The Little Lake Harris (LLH) Bridge was constructed in 1951 to replace the eastwest County Road 48 Bridge connecting the towns of Howey-in-the-Hills and Astatula in Lake County, Florida, United State
Jan 1, 2015
-
Use of Isolated Tie-Back Plates to Stabilize a Landslide in Steep Terrain
By Scott D. Neely, Donald R. Clark
"An existing landslide located at the southeast corner of the Telluride Regional Airport has been in an active state of failure for several years. The presence of the landslide has represented an on-g
Jan 1, 2015
-
Use of Post-Grouted Drilled Shafts in Coastal Mississippi
By Jacob A. Jordan, Rachel M. Garrett, W. Robert Thompson III, James C. Pegues
"Environmental control structures for an existing fossil-fuel power generating plant near Pascagoula, Mississippi faced several design and construction challenges due to space limitations. Conceptual
Jan 1, 2015
-
Use of Vibro-Replacement Stone Columns for Ground Improvement and Support of Mechanically Stabilized Earth (MSE) Wall
By Pancho J. Garza, Keith H. Dahlen, Chris A. Labye
"Design for reconstruction of the East Flagstaff traffic interchange project located in Flagstaff, Arizona posed particular challenges. The proposed design included construction of a nearly 50-foot ta
Jan 1, 2015
-
Vertical Load Test on a Drilled Shaft Installed in Glacially Derived Sediments
By Robert C. Simpson, Ghada S. Ellithy
"There are several methods for estimating the axial capacity of drilled shafts installed in coarse-grained soils. Most methods estimate the ultimate capacity for side friction and tip resistance. Desi
Jan 1, 2015
-
Undergraduate Learning Commons
By William M. Tanner, Daniel C. Brahana
"A drilled pier foundation was originally designed to support the proposed G. Wayne Clough Undergraduate Learning Commons on the campus of Georgia Tech in Atlanta, GA. Reflective of the site geology,
Jan 1, 2015
-
Very Deep Foundations in Rock: The New Challenge in the Foundation Industry.
By Paolo Cavalcoli, Federico Pagliacci
"As opposed to the static functional recovery of existing structures, the construction of infrastructures in an urban environment, when combined with complex geological situations, often involves buil
Jan 1, 2015
-
Wolf Creek Dam Foundation Remediation – An Innovative Solution
By Fabio Santillan, Lyndon Bedford
"This paper presents the main features of the Wolf Creek Dam Foundation Remediation Project, highlighting the innovative construction approach and stressing on how the collaboration between the contra
Jan 1, 2015
-
Risk Management Techniques to Avoid Litigation
By Kevin Cunningham
"Litigation resulting from neighboring structures with settlement and/or lateral movement or improper pile design and faulty soils engineering analysis, are a multi-faceted opportunity for law firms.
Jan 1, 2015
-
Secant Pile Barrier Wall Overlap, Thickness, and Position at the U.S. Army Corps of Engineers Wolf Creek Dam, Jamestown, KY
By Bernard B. Vannoy, Howard W. Gault, Ramesh Bobba
"Treviicos-Soletanche Joint Venture (JV) and the US Army Corps of Engineers (USACE) have installed a 3800-foot long, 275-foot deep and minimum 2-foot wide secant pile barrier wall at Wolf Creek Dam in
Jan 1, 2015
-
Selmon Expressway, Tampa: Case History of Drilled Shaft Design for Extreme Variability
By Ross T. McGillivray, David S. Graham, Dan A. Brown, Steven D. Dapp
"The Selmon Expressway includes an elevated structure extending across several miles of weathered karstic limestone geology, and represents a challenge for design because of the high variability of th
Jan 1, 2015
-
Site Specific Study for Foundation Design of Iswar Gupta Bridge
By Ambarish Ghosh, Chitralekha Ghatak, Tanumaya Mitra, Tarun Sengupta, Sajib Das, Sankar Kumar Nath
"Currently construction of important structures like bridges, flyovers and high rise buildings in and around Kolkata are in full swing. These structures have mostly pile or well foundations. The desig
Jan 1, 2015