Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore Deposits
By A Melkumyan, K Silversides
The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.
Nov 24, 2014
-
Sensor-based Real-time Resource Model Reconciliation for Improved Mine Production Control – A Conceptual Framework
By M W. N Buxton, M S. Shishvan, J Benndorf
The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,
Nov 24, 2014
-
Enhancing Risk Management in Strategic Mine Planning through Uncertainty Analysis
By C Fricke, R Wood, P Velletri
"In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ
Nov 24, 2014
-
Parallel Implementation of a Tabu Search Procedure for Stochastic Mine Scheduling
By R Dimitrakopoulos, R Senécal
This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st
Nov 24, 2014
-
A Stochastic Optimisation Formulation for the Transition from Open Pit to Underground Mining within the Context of a Mining Complex
By J MacNeil, R Dimitrakopoulos
As open pit mining of a deposit deepens, the cost of extraction may increase up to a threshold where transitioning to mining through underground methods is more profitable. This paper provides an appr
Nov 24, 2014
-
Open Pit Transition Depth Determination through Global Analysis of Open Pit and Underground Mine Production Scheduling
By K Dagdelen, I Traore
This paper presents an iterative net present value (NPV) maximisation method to determine the optimum surface to underground transition depth for an orebody to be mined by multiple open pits and an un
Nov 24, 2014
-
Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk Quantification
By M W. N Buxton, M T. Bootsma, J Benndorf, C Alford
Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti
Nov 24, 2014
-
Geometallurgical Modelling and Ore Tracking at Kittilä Mine
By M Wortley, J Korteniemi, D La Rosa, L Rajavuori
Geometallurgical modelling of an orebody provides benefits to a mine by gaining a better understanding of the ore characteristics and how they affect the performance of the concentrator. With this kno
Nov 24, 2014
-
Applying Modern Heuristics to Maximising Net Present Value through Cut-off Grade Optimisation
By C A. Myburgh, S Craig, K Deb
In focusing on open pit mine scheduling, one of the biggest areas that a mining engineer can add value is in the area of cut-off grade optimisation. It is not atypical to add up to an extra 20 per cen
Nov 24, 2014
-
Applicability of Categorical Simulation Methods for Assessment of Mine Plan Risk
By A Jewbali, R Perry, R Inglis, L Allen
"The use of conditional simulation to characterise mine plan uncertainty is increasing for the assessment of risk in mining projects. While the development of grade uncertainty profiles is relatively
Nov 24, 2014
-
Demonstrating Efficiency Gains from Installing Truck Turntables at Crushers
By P A. Grossman, J H. Rubinstein, M Brazil
The installation of truck turntables at above-ground crushers has the potential to yield gains in efficiency and productivity by eliminating the need for the trucks to turn around and reverse up to th
Nov 24, 2014
-
Aligning Resource Estimates with Mine Planning
By D Kentwell
A resource model serves two main purposes depending on the stage of a project. The first is to provide an early indication of likely tonnages and grades at certain cut-offs so that decisions can be ma
Nov 24, 2014
-
Multivariate Block Simulations of a Lateritic-type Nickel Deposit and Post-processing of a Representative Subset
By J Deraisme, P Epinoux, O Bertoli
"Société le Nickel exploits the Dôme lateritic nickel orebody at its Tiébaghi operations in New Caledonia. The site geology has an obvious bearing on recovery and metallurgical performance, with contr
Nov 24, 2014
-
Open Pit Strategic Mine Planning with Automatic Phase Generation
By M Recabarren, A Echeverria, J Ronda, J I. Guzman, R Dodds, G Juarez, E Vila-Echague
A strategic mine plan is a fundamental part of any mining operation. It must provide a realistic and operative extraction and processing schedule, and yield the highest value for the business. For ope
Nov 24, 2014
-
Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns
By M Spleit
A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr
Nov 24, 2014
-
Globally Optimising Open Pit and Underground Mining Operations under Geological Uncertainty
By R Dimitrakopoulos, K Kawahata, L Montiel
A method that optimises mining complexes that are comprised of multiple processing destinations, open pits and underground operations is presented. Mining, blending, processing and transportation deci
Nov 24, 2014
-
Is Truck Queuing Productive?
By P Malkin, S Thomas, P M. Stone, D Kostyuk
In open pit mining, it is common that the bottleneck to productivity and profit lies in the truck-shovel mining operation, especially as strip ratios and mining intensity have increased with resource
Nov 24, 2014
-
An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project
By D J. Thobaven
Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu
Nov 24, 2014
-
Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing
By E Lima, D Gregory, C Faria, A Lapworth
Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all
Nov 24, 2014
-
Approaches to the Simulation of Compositional Data – A Nickel-Laterite Comparative Case Study
By K G. van den Boogaart, U Mueller
"An accurate prediction of benefit for some types of ore may require not just the ore grade, but a whole compositional characterisation of the estimates; that is, its full mineral composition includin
Nov 24, 2014