  • AUSIMM
    Sublevel Shrinkage – the Mt Wright Story

    By S Long, A J Koen, D MacKay

    The Mt Wright Underground Mine is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Following the evol

    Mar 24, 2014

  • AUSIMM
    Piling and Raise Bore Construction – Key Learnings from a Client’s Perspective

    By R Austerberry, S Green

    Highly weathered ground, limited collar options and the need to achieve a desired outcome at the lowest possible cost led to the need to adopt a construction approach that had no established design me

    Mar 24, 2014

  • AUSIMM
    An Investigation of Expanding Split Sets in Weak Ground

    By G Davison, C Rossimel, M Bouazza

    Expanding rock bolts anchor within a rock mass more efficiently than non-expanding varieties. This is of great importance in weak ground conditions, where grouted friction bolts perform less efficient

    Mar 24, 2014

  • AUSIMM
    A Holistic Viewpoint for Selecting the Vertical Haulage System – Shafts and Conveyors

    By R M. Krek

    The haulage system used to convey ore from an underground mine to a surface stockpile at the mine process plant is a vital component of the mine’s overall infrastructure and economic viability. The sy

    Mar 24, 2014

  • AUSIMM
    Developing the Foundation Communication Infrastructure to Support Remote and Automated Mining Initiatives in Underground Mines

    By D Kent, R Paine

    "Automated mining systems are increasingly being seen as a key requirement for a productive mining operation in the future. The importance of an integrated communication network infrastructure to supp

    Mar 24, 2014

  • AUSIMM
    Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

    By B Cook, M Karakus, J Light, E K. Chanda

    The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements

    Mar 24, 2014

  • AUSIMM
    Mining Scenario Analysis and Mine Variable Value

    By B E. Hall, J Poniewierski, A J. Hills

    Following a review of life-of-asset work at MMG’s Rosebery mine in which a proposal to increase production from 0.8 Mt/a to 1.2 Mt/a was mooted, questions were raised as to the seemingly arbitrary rea

    Mar 24, 2014

  • AUSIMM
    A Revolution in Raise Boring – The Development of the RBR900VF

    By R J. Wood

    Raise drilling (or raise boring) is not a new technology or methodology. The first raise drilling machine was developed by The Robbins Company (TRC) of the USA in 1962. TRC manufactured the first tunn

    Mar 24, 2014

  • AUSIMM
    Transition of the Ernest Henry Mine from Open Pit to an Underground Sublevel Cave

    By J B Tucker, A T. McGrath

    Situated in north-west Queensland, Australia, the Ernest Henry Mine (EHM) has been producing copper and gold since 1996. Owned and operated by Glencore Xstrata, ore is currently sourced from a newly d

    Mar 24, 2014

  • AUSIMM
    Mine Development Optimisation – An Evolutionary Process

    By J Kovacs

    Underground development drill and blast practices have generally remained unchanged for decades. Historically, development optimisation has focused mainly on the application of perimeter control produ

    Mar 24, 2014

  • AUSIMM
    RISKGATE and Underground Operations

    By J Harris, J Li, M Shi, P A. Kirsch, D Sprott

    Australia has an enviable global reputation as a leader in health and safety outcomes in the hazardous industry of mining, in part due to an increased application of risk management regarding operatio

    Mar 24, 2014

  • AUSIMM
    The Economic Advantages of Detailed Geotechnical Assessments for Extraction Sequencing

    By A Bennett, S Arndt

    Minerals and Metals Group Pty Ltd (Golden Grove Mine) commissioned a comprehensive study of the life of mine using advanced 3D stress modelling. Essential input into the modelling was the proposed min

    Mar 24, 2014

  • AUSIMM
    The Paulsens Transformation – A Shining Light under a Northern Star

    By C Jones

    When the Paulsens operation was poised to be placed on care and maintenance, Bill Beament and the rest of the Northern Star Resources (NSR) team capitalised on the opportunity to send the Ashburton re

    Mar 24, 2014

  • AUSIMM
    Excavating the First Underground Gyratory Crusher at the Deep Mill Level Zone Mine, PT Freeport Indonesia

    By E Hernandez, I Agustian, W Kusumohastuti

    PT Freeport Indonesia is completing the first underground gyratory crusher excavation at their Deep Mill Level Zone (DMLZ) mine located in the mountains of Jayawijaya, District of West Papua, Indonesi

    Mar 24, 2014

  • AUSIMM
    Improving Production Drilling and Blasting in the Kim South Orebody at Agnew Gold Mine

    By T A. Carter

    In 2010 Agnew Gold Mine (AGM) struggled to produce the required tonnages from its stopes. The longhole rises used to create void in stopes were unreliable and often failed to gain the designed rise he

    Mar 24, 2014

  • AUSIMM
    Challenging the Norm – Alternative Excavation Method in Mining

    By R Burke, G Ramage, C Donnelly

    Over the decades, Redpath has undertaken a multitude of tunnelling and underground excavation projects for civil and mining clients both domestically and internationally. These projects have been unde

    Mar 24, 2014

  • AUSIMM
    Precharging Sublevel Shrinkage Production Rings in Hot and Reactive Ground with Electronic Blasting Systems

    By B Crowdey, J Wall

    The particular underground operation relating to this paper is a gold producer and has an orebody predominately consisting of rhyolite and marcasites pyrite. The ore has been identified as being react

    Mar 24, 2014

  • AUSIMM
    Managing the Diamond Drilling Interactions in Commissioning the Ankata Underground Mine

    By L Sandery, S Light

    Within 22 months of commencing decline development, the Prominent Hill Ankata Underground Project achieved its full production rate of 1.2 Mt/a.In 2010 construction of the Ankata Underground Project w

    Mar 24, 2014

  • AUSIMM
    Development – Back to Basics

    By I T. Ross

    In the last 50 years there have been tremendous improvements in equipment used in development on underground mines. Compressed air powered jacklegs have been replaced by high powered electro-hydraulic

    Mar 24, 2014

  • AUSIMM
    Use of a Pre-existing Microseismic Monitoring System to Detect Trapped Miners (with Reflections on Beaconsfield 2006)

    By D Cumming-Potvin

    Incidents that trap miners in underground mines have serious consequences for the miners and the mine operators involved. It is of utmost importance that mine operators utilise all available tools whe

    Mar 24, 2014