    Appendix E - Unsaturated Flow

    By Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg

    The term unsaturated flow refers to the conditions in which soil pores are filled partially with water and partially with air. This situation constitutes a porous material filled with immiscible fluid

    Jan 1, 1986

  • NIOSH
    Appendix F - Government Offices Contacted During Survey

    By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent

    APPENDIX F GOVERNMENT OFFICES CONTACTED DURING SURVEY 1. MESA Inspection Offices North Central District Duluth, Minnesota South Central District Dallas, Texas Rolla Subdistrict Rolla,

    Jan 1, 1976

  • NIOSH
  • SME
    Appendix F - Simulation Summaries of the Uranium and Lead Mines

    By Dale R. Ralston, Roy E. Williams, Gerry V. Winter, George L. Bloomsburg

    Jan 1, 1986

  • NIOSH
    Appendix F – Free Read Program For PSU/MVS

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    THIS PROGRAM TRANSFORMS FREE FORHATED BRANCH DATA INTO A FORMAT SUITABLE FOR INPUT TO THE PENNSYLVANIA STATE UNIVERSITY MINE VENTILATION SIMULATOR (PSU/HVS 1. BRANCH RESISTANCES ARE ASSUMED TO H

    Jan 1, 1977

  • NIOSH
    Appendix G - Table Ix - Mine A

    By David Hoadley, Kenneth R. Maser, Ashok B. Boghani, James E. Billar, D. Randolph Berry, Mackenzie Burnett, Robert H. Trent

    APPENDIX G TABLE IX MINE A 1 General Total Employees 3000 Maximum No, of Men Underground/Shift 800 Shifts/Day 3 Type of Ore Copper Daily Production (TPD) 25,000 Mining Method Room and Pillar

    Jan 1, 1976

  • NIOSH
    Appendix G – Input Data fort initial Simulation

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    1 9 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY; PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT. 27

    Jan 1, 1977

  • NIOSH
    Appendix H – Computer Output for Initial Simulation

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    MINE VENTILATION NETWORK ANALYSIS

    Jan 1, 1977

  • NIOSH
    Appendix I - Cost Analysis System

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    Introduction The Cost program was developed to provide the planning engineer with a tool to evaluate the cost implications of the technical mine design decisions. Direct costing methods are empl

    Jan 1, 1975

  • CIM
    Appendix I - The Art of Creating a Financially Rewarding Royalty

    By Craig Haase

    A. Introduction

    Jan 1, 2003

  • NIOSH
    Appendix I – Addition of Andrews Shafts – Input Data

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    1 11 THIS IS A DIGITAL COMPUTER SIMULATION OF THE VENTILATION SYSTEM OF A MINE LOCATED IN WASHINGTON COUNTY, PENNSYLVANIA. THE VENTILATION SURVEY ON WHICH THIS SIMULATION IS BASED WAS RUN FROM OCT.

    Jan 1, 1977

  • NIOSH
    Appendix I – Computer Program Listing

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    • MINE VENTILATION NETWORK PROBLEM (NATURAL SPLITTING; FIXED • QUANTITY BRANCHES; METHANE SIMULATION; NETWORK TOPOLOGY REVISION; • ABSOLUTE PRESSURE) • NFIXB = NO. OF FIXED QUANTITY BRANCHES • DD(

    Jan 1, 1975

  • NIOSH
    Appendix II – Model Verification Test I

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    The data for Test I describes an underground bituminous coal mine operation in a 48 inch seam, with an estimated production rate of 1,056,000 tons per year. The system includes four continuous mining

    Jan 1, 1975

  • NIOSH
    Appendix II – Part I to Part IV - Each part contains the input, output, and a schematic showing the flows from computer solutions

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    PART 1 THE INPUT AND OUTPUT DATA AND THE MINE SCHEMATIC SHOWING THE FLOWS FROM COMPUTER SOLUTIONS FOR APPLICATION I

    Jan 1, 1975

  • CIM
    Appendix II. Royalty Check List

    By Karl J. C. Harries

    "The following is an outline or check sheet of some things that might be looked at when considering the concept of a royalty or royalty provisions. It is not intended as a guide to what is right or wr

    Jan 1, 2003

  • NIOSH
    Appendix III - Analytical Pressure - Volume Computations For The Mine Prototype

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    ANALYTICAL PRESSURE - VOLUME COMPUTATIONS FOR THE MINE PROTOTYPE A new coal mine is projected, with entrance by slope 1,500 feet long. Nine main entries will be standard for development, five as in

    Jan 1, 1975

  • CIM
    Appendix III - Joint Venture Agreement Table of Contents, Annotated

    By Karl J. C. Harries

    "The Table of Contents that follows is only an example and is the Table of Contents from an actual negotiated agreement. It is merely intended to show how an agreement might be set out and the nature

    Jan 1, 2003

  • NIOSH
    Appendix III – Model Verification Test II

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    The data for Test I1 describes an underground bituminous coal mine operating in a 72 inch seam, with an estimated production rate of 4,257,000 tons per year. The system includes 15 continuous mining s

    Jan 1, 1975

  • NIOSH
    Appendix IV – Cost Data Library

    By R. V. Ramani, V. T. Burgos, J. A. McClay

    Cost Data Library The data retained in the Cost Data Library is of a semi¬permanent nature in that it is held in storage for immediate use with the program although its contents may require periodi

    Jan 1, 1975

  • NIOSH
    Appendix IV – User’s Index

    By R. V. Ramani, C. B. Manula, A. Owili-Eger

    All the input data required to operate the ventilation simulator except the title, are entered with I10 or F1O.O formats. The title is entered with (18A4) format. The floating points are designated by