Search Documents

Sort by

  • ISEE
    Blasting on Parliament Hill, Ottowa, Adjacent to Canada's No. 1 Heritage Building

    By M V. Van Bers, A L. McAnuff, A Curic

    During the Summer of 1997, rock excavation was carried out for construction of the Centre Block Underground Services building (CBUS) abutting the most historically significant structural complex in Ca

    Jan 1, 1999

  • ISEE
    Blasting on the Iroquois Trail

    By Charles Joyce, William C. Burkle, Dan Murphy

    Rare indeed has a major cross country natural gas pipeline met and surmounted such obstacles as the Iroquois Gas Transmission Line from Canada to Long Island, New York. Of the 370 miles long length a

    Jan 1, 1992

  • AIME
    Blasting Operations in Chile

    By D. M. Dunbar, H. C. SCHLILTZ

    HE Chile Exploration Co.'s mine and reduction plant are at Chuquicamata, Chile, on the eastern edge of the Atacama Desert, 163 miles northeast of Antofagasta, 80 miles from the Pacific Ocean, and

    Jan 1, 1925

  • ISEE
    Blasting Optimization Strategies for Enhanced Productivity at Mont-Wright Mine

    By Joe Atalla, Jesse Desrochers, Rodrigo Hayashida, Joseph Mukendi Kabuya

    The Mont-Wright mine stands as a prominent open-pit operation in Canada, renowned for its vast iron-ore reserves. However, the efficacy of its blasting operations, crucial for efficient production, ha

    Jan 21, 2025

  • ISEE
    Blasting Optimization using 3D Photogrammetry in a South Brazilian Quarry

    By L. O. Souza, J. F. Gewher, M. P. Scussiatto, C. S. Mendonca, R. A. McClure, B. T. Kuckartz, J. Kloeckner

    Blasting is the most effective and economical tool available to fragment and move rock for most applications. If properly executed, it can improve down-stream operations such as loading, hauling and c

    Jan 1, 2013

  • ISEE
    Blasting Optimization Using Autonomous Fragmentation Monitoring System

    By B. Corrêa, M. Cavalcante

    A large open pit iron ore mine in Brazil, which has a heterogeneous lithology, faces a challenge in defining drill and blast patterns to achieve the expected results. The mine needed to obtain an aut

    Jan 1, 2024

  • ISEE
    Blasting Over 40 Feet of Toe Burden - A Case Study to Outline Modern Planning Techniques

    The use of angled shot holes can be extremely effective in blasting faces that either have a great deal of toe burden or where it is difficult to give a drill access to a face due to backbreak and fac

    Jan 1, 1994

  • ISEE
    Blasting Overhangs Close to a Vibration Sensitive Structure

    By R. Franfield

    This paper describes a situation that many drilling and blasting contractors have found themselves in – a client?s fear of the use of explosives. In the summer of 2007 Blasting Services Ltd was asked

    Jan 1, 2009

  • ISEE
    Blasting Parameters for Concrete Fly-Overs

    By Bob de Raadt

    The main problem in blasting a fly-over spanning a main road is the brief time available for blasting and the removal of the debris, in order to minimize the ensuing traffic disruption in the public h

    Jan 1, 1984

  • ISEE
    Blasting Permanently Frozen Asbestos Ore in Northern Canada

    Almost one half of Canada's total land surface is underlain by permafrost. This term describes the thermal condition of earth materials when their temperature remains below 0°C continuously for a numb

    Jan 1, 1975

  • AUSIMM
    Blasting Physics-What the Operator Can Use in 1975

    Blasting effectiveness must be gauged by total production costs. ANFO charges made up in polythene "sausages" are not as profitable as is indicated by the price of ANFO. All-slurry charges are wa

    Jan 1, 1975

  • CIM
    Blasting Practice in the East Bluff Section of the Britannia Mine

    By Chris G. Dobson

    Introduction The Britannia mine is at Britannia Beach, on Howe sound, approximately thirty miles from Vancouver. The first claims were staked in 1898, and a local company was formed at that time to d

    Jan 1, 1935

  • SME
    Blasting Practices At Die Mining Company

    By Edward J. Karkoska

    The film you see is a slow motion view of a typical half million ton taconite blast at one of Erie's mines. This blast is made up of 220 drill holes and a total of 325 thousand pounds of blasting

    Jan 1, 1969

  • SME
    Blasting Practices At The Cannon Mine

    By C. J. Gilbert

    The mining method at the Cannon Mine uses heading and bench stopes, which are subsequently backfilled with cemented high-strength fill prior to pillar removal. The dimensions of the pillars, 24 feet w

    Jan 1, 1989

  • ISEE
    Blasting Practices at the Fording River Operations

    By Murray B. Lytle

    The Fording River Operations of Fording Coal Ltd. in southeastern British Columbia is producing 45 million long tons of clean metallurgical coal for shipment to the Japanese steel industry on a 15 yea

    Jan 1, 1978

  • AIME
    Blasting Practices At The New Cornelia Open-Pit Copper Mine

    By Harry H. Angst, Reuel A. Cochrane

    THE successful exploitation by opencut methods of the low-grade porphyry copper deposits is due to the economical handling of large tonnages. Large tonnages are possible only if the rock material is b

    Jan 1, 1941

  • AIME
    Blasting Practices for Improved Coal Strip Mine Highwall Safety and Cost

    By Michael F. Dunn, Francis S. Kendorski

    The fall of rock from strip coal mine highwalls continues to be the largest single source of fatal accidents, so methods to improve highwall stability through improved blasting practices were investig

    Jan 1, 1983

  • CIM
    Blasting Practices in Some Coal Mines of Nova Scotia

    By L. H. Bergmann

    THE blasting practices described are fairly representative of those employed in the coal mines of Eastern Canada. As such, they may be of interest to Western Canadian coal mine operators. The treatmen

    Jan 1, 1945

  • SME
    Blasting Practices Updated at Cannon Mine

    By Clark J. Gilbert

    The mining method at the Cannon mine uses heading and bench stopes, which are subsequently backfilled with cemented high-strength fill before pillar removal. The dimensions of the pillars are 7.3 m wi

    Jan 1, 1990

  • ISEE
    Blasting Problems Facing the USA Quarry Industry

    By Victor C. Bryan

    "One of the more challenging issues facing operators of U.S. mines and quarries is blasting in an environmentally acceptable way. It is quite important that industry management understand and apply gu

    Jan 1, 1995