Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Trials, Tribulations and Triumphs of Unmanned Aerial Vehicle Surveying at St Ives Gold Mine
By R Steven
"Surveying, and as a result, surveyors, have been around since the start of time, and it has been said that so has their methodology!The theodolite and tape have been the backbone of a time-tested pra
Nov 15, 2016
-
Use of Robust Design Methodology for Production Scale Definition in Open Pit Mining
By M A. González, J A. Romero, D L. Fuentes, C J. Poblete, O Abdrashitova
"Robustness can be defined as the ability of a system to resist change without adapting its initial stable configuration. Robust design methodology, which is widely accepted in the manufacturing indus
Nov 15, 2016
-
Application of Shuttle Radar Topography Mission Data in Hydrological Analyses of Super Pit and Griffin Coalmine
By A K. Ghosh
"Inrush of water is always an issue, especially for mines located in heavy rainfall areas. Nowadays, mining companies and research institutes have developed many advanced technologies for study and an
Nov 15, 2016
-
Innovative Approach to Open Pit Edge Protection
By N Redwood, N Fowkes, A Bassom, S Durkin
"It is well known that from time-to-time a vehicle will interact with a bund or windrow and often the barrier is insufficient to safely arrest that vehicle. The result of such an incident is often cat
Nov 15, 2016
-
A Fine Looking Sample – the Importance of Fines in Grade Control Sampling to Mine to Mill Reconciliation
By B Reid
"Since the commencement of mining operations at the Cowal Gold Operations (CGO) in 2005, reverse circulation (RC) drilling has been the preferred method for grade control (GC) sample collection. This
Nov 15, 2016
-
Optimum Management of Truck Tyres in a Mine
By S Casas Castellanos
"Tyres consumption is one of the costliest branches of the operation in a truck-based haulage mine. Off-the-road (OTR) tyres working within undesirable conditions have a considerable negative impact o
Nov 15, 2016
-
A 3D Discrete Event Simulation Model of a Truck-shovel Network System
By W Zeng, D Walker, D Cai, E Baafi
"The efficiency of the truck-shovel haulage system is significantly influenced by the truck fleet size. A discrete event simulation model with 3D animation has been developed to estimate the productiv
Nov 15, 2016
-
A Case Study on the Assessment, Planning and Extraction of the Crown Pillar at Sunrise Dam Gold Mine
By M Brockman, M Cowan, A Robeson
"Sunrise Dam Gold Mine (SDGM) is located 820 km from Perth, 220 km from Kalgoorlie—Boulder and 55 km south of Laverton in Western Australia. The SDGM main pit had successfully operated since 1997 and
Nov 15, 2016
-
Getting Accurate Mine Information to the Right Teams to Drive Production Improvement
By T Elms, R Beckman, M Sampson
"In today’s mining industry, the pressure of reducing costs and increasing production while maintaining high safety standards is at the forefront of operational endeavours. A combination of specific m
Nov 15, 2016
-
Measuring the Effectiveness of Change through Best Practice Reconciliation
By G Pattenden, R Hargreaves, P Pettit
"Even with the cyclic nature of mining, when it comes down to it, the bottom line is that whatever direction the commodity market is going there is always a desire to improve the economics of an opera
Nov 15, 2016
-
Justifying Slope Design Risks and Costs
By N M. Player, R P. Varden, E Jones
"An effective geotechnical design provides an accurate and appropriate assessment, balanced with a mining company’s risk profile. Justifying the cost of slope assessment requires an understanding of t
Nov 15, 2016
-
In-pit In Situ Recovery – a New Approach That May Allow for Increased Value Extraction before Pit Closure
By D J. Robinson, L L. Kuhar
"Regardless of orebody value, at some stage, the pit will reach a depth where the reward for mining wider and/or deeper is not justified by the anticipated returns. ‘Last-blast’ strategies may help to
Nov 15, 2016
-
Plata y platería pre hispánica
By Jorge Olivari Ortega
"La plata fue un metal de apreciado valor para las sociedades pre-hispánicas -en tanto los mineros lo obtenían de forma pura y se beneficiaban como metales argentíferos. En ese sentido, el presente
Nov 1, 2016
-
El éxito de Compañía Minera Antamina basado en un modelo de gestión de planeamiento integrado
By Juan Escala Abril
El presente texto describe el éxito de modelo de gestión en planeamiento integrado aplicado por la mina Antamina. En ese sentido, se presenta un grupo de herramientas como los factores claves de éxit
Nov 1, 2016
-
Proyecto minero Santas Gloria: yacimiento de plata en el distrito minero de Cocachacra. Geología, recursos y potencial exploratorio
By Alberto Martín Ríos Carranza
"El presente texto señala la información técnica del proyecto de Santa Gloria. Dicho plan revisa las estimaciones de reservas, recursos y potencial exploratorio, información metalúrgica, infraestructu
Nov 1, 2016
-
Newmont opens Merian Mine in Suriname on time and under budget
By William Gleason
"There are few people more qualified to speak of the tumultuous times in the global mining industry during the past four years than Newmont Mining Corp. president and chief executive officer Gary Gold
Nov 1, 2016
-
Dragline step change; Safer, greener and lower operating costs are possible
By R. Adsero
"A high altitude review of the state of the mining industry provided by a study of multifactor productivity shows a continuation of lower output year on year for the capital and labor inputs applied.
Nov 1, 2016
-
Computational fluid dynamic modeling of a medium-sized surface mine blasthole drill shroud
By W. R. Reed, J. P. Rider
"The Pittsburgh Mining Research Division of the U.S. National Institute for Occupational Safety and Health (NIOSH) recently developed a series of models using computational fluid dynamics (CFD) to stu
Nov 1, 2016
-
Gestión estratégica minera en época de crisis
By Fernando Valdez Nolasco
Dada la crisis minera por la baja de precio de metales en América Latina y principales minas del Perú, se planteó un modelo de gestión que resuelva la situación. Dicho modelo consta de cuatro etapas:
Nov 1, 2016
-
Defining hazard from the mine worker’s perspective
By C. L. Kosmoski, B. M. Eiter, B. P. Connor
"In the recent past, the mining industry has witnessed a substantial increase in the numbers of fatalities occurring at metal and nonmetal mine sites, but it is unclear why this is occurring. One poss
Nov 1, 2016