Search Documents

Sort by

  • SME
    2016 SME President’s Interview - Timothy D. Arnold; An interview with the 2016 SME President

    "History - How did you get into mining and involved with SME?Unlike many past presidents, I do not come from a mining lineage. I liked math in high school and believed I wanted to be an engineer. I to

    Jan 1, 2015

  • CIM
    The Flsmidth® Rapid Oxidative Leach (Rol) Process. Part I: Mechano-Chemical Process for Treating Chalcopyrite

    By F. Baczek, S. S. Rocks, D. Chaiko, T. Walters

    The atmospheric leaching of chalcopyrite concentrates using acidic ferric sulfate lixiviants is well known to suffer from slow leach kinetics and poor copper recoveries. A number of approaches have be

    Jan 1, 2015

  • CIM
    CFD Studies on the Flow Field Characteristics of the 600 M3 Air-Forced Mechanical Flotation Cell

    By X. S. Fan, T. R. Feng, D. Chen

    To meet the flotation process requirements, the large-scale flotation cell must be designed for sufficient pulp mixing, reasonable air dispersion and solid suspension, which is very difficult to desig

    Jan 1, 2015

  • CIM
    Modelling of Cracking in Concrete Tunnel Lining by Continuous-Discontinuous Approach

    By J. L. Feng, F. Zhang, S. K. Hu

    "Cracking is one of the most serious damages in tunnel linings, which is often observed by in-situ inspection to tunnel engineering. It is difficult to better characterise for the deformations from co

    Jan 1, 2015

  • CIM
    A Novel High Thermal Conductivity Al-Si Casting Alloy and Application

    By G. L. Zhu, Y. F. Wu, H. Nagaumi

    A novel eutectic-type alloy Al12Si-HTC with high thermal conductivity has been developed by strict chemical composition control and heat treatment. The thermal conductivity of the alloy is about 30 %

    Jan 1, 2015

  • CIM
    The Flsmidth® Rapid Oxidative Leach (Rol) Process. Part Ii: A New Chemical Activation Process for Chalcopyrite

    By F. Baczek, S. S. Rocks, D. Chaiko, C. Eyzaguirre, S. Asihene, T. Walters

    The majority of efforts to improve primary copper sulfide leaching have focused on solution chemistry, temperature, O2 pressure, ultra-fine grinding, the use of catalysts, etc. Historically, very few

    Jan 1, 2015

  • CIM
    Biomass Carbide Injection into Blast Furnace

    By H. Tsuruta, A. Fujibayashi, I. Sumi, A. Murao, R. Murai

    Injection of biomass into blast furnace as alternative reducing agent is so effective for the purpose of mitigation of carbon dioxide emissions from steel industries, because biomass is considered to

    Jan 1, 2015

  • CIM
    Fifty Years of Evolution of the Metallurgical Engineering Companies in Canada Reproduced from the Canadian Metallurgical and Materials Landscape 1960-2011, PP 421-428. METSOC 2011

    By Chris Twigge-Molecey

    "Over the last 50 years there has been a dramatic evolution in the metallurgical engineering field in Canada. In the 60s the field was dominated by large American and UK groups, often selling major pr

    Jan 1, 2015

  • CIM
    Quantifying Losses in Support Capacity Due to Corrosion

    By E. Ghali

    "Corrosion of support system components (e.g., bolts, mesh, plates) is a safety and economic concern in underground mines. This paper reports the results of a five-year study wherein corrosion coupons

    Jan 1, 2015

  • SME
    Crusher Vision Automation System: Closed Side Setting Measurement and Mainshaft Installation

    By T. Shumka, M. J. Druckenmiller

    "INTRODUCTION As we push further into the 21st century and closer to a more efficient mine, safety and operational enhancements are the two major keys towards attaining success. The Crusher Vision Aut

    Jan 1, 2015

  • CIM
    Application of Box-Behnken Design to Modelling of Iron Bearing-Gangue Recovery in Hydroxamate Flotation of Pyrochlore

    By B. Yu, S. Kelebek, C. Gibson, M. Aghamirian

    There are a number of high grade niobium deposits worldwide which have been deemed untreatable by flotation due to the very fine grained nature of the in situ pyrochlore, the primary niobium bearing m

    Jan 1, 2015

  • CIM
    A Numerical Study of the Stresses In Backfilled Stopes Overlying a Sill Mat

    By M. A. Sobhi, L. Li

    With the continuous reduction of mineral resources at shallow depth, more and more mines have to go deeper beneath the earth's surface to reach the ore zones. This increase in mine depth leads to a na

    Jan 1, 2015

  • SAIMM
    Smelting of Calcined Basic Nickel Carbonate Concentrate in a 200 kW Dc Arc Furnace

    By M. Abdellatif

    "SynopsisCalcined basic nickel carbonate (BNC) concentrate was smelted in a pilotscale DC arc furnace to produce a nickel metal. The furnace was continuously operated for 12 days (24 hour/day), during

    Jan 1, 2015

  • CIM
    Escalating Social Risk around Mining: Why Does it Matter and what can be done? (de18c614-756d-4028-8d5f-1512fe0b7545)

    By M. D. Evans

    "Note: The views expressed herein are those of the author, not of the Government of CanadaThe mining industry has a significant opportunity to capitalize on past learnings to build better social relat

    Jan 1, 2015

  • CIM
    Rainfall-Induced and Structurally-Controlled Slope Failure and Rockfall Incidents along part of Werka Descent Road and Remedial Measures, North West of Saudi Arabia

    By B. H. Sadagah

    "Construction of mountain roads at north westerly Saudi Arabia is a difficult task in rugged terrains, where the rock masses are steep slopes, and full of geomorphological constraints.Werka descent li

    Jan 1, 2015

  • CIM
    A Novel Heat Treatment Practice for Al-3%Cu-1%Mg DC Cast Ingot Plates

    By X. -G. Chen, E. M. Elgallad

    Direct chill (DC) cast ingot plates of 2xxx alloys have been increasingly used for large mold applications in the plastics and automotive industries. A novel heat treatment practice for Al-3%Cu-1%Mg D

    Jan 1, 2015

  • CIM
    Probabilistic Analysis for Mine Design, Using Coal Pillar Design to Illustrate its Potential Usefulness

    By T. R. Kostecki, J. Hirschi

    "Analytical engineering design is based upon a trial-and-error iterative and deterministic process. Within this process, the engineer obtains some estimated values, plugs them into de facto closed-for

    Jan 1, 2015

  • CIM
    Mathematical Modelling of Emissions during Pre Heating of Magnesia-Carbon Bricks

    By Saikat Chatterjee, Xintong (Brett) Liu, Kinnor Chattopadhyay

    Magnesia carbon bricks are commonly used in BOFs and are generally pre-heated before the BOF goes into service. Owing to very stringent emission regulations, the BOF pre-heating process need to be con

    Jan 1, 2015

  • CIM
    Scientifically Difficult and Challenging Issues in Chinese Rock Engineering

    By P. Lin, S. G. She

    "In June 1985, Chinese Society for Rock Mechanics and Engineering (CSRME) was established. During the past 30 years, various major achievements are made in the discipline of rock mechanics and rock en

    Jan 1, 2015

  • CIM
    Advances in Infrared Spectroscopic Sensing Towards Improvements in Geological and Geotechnical Models

    Infrared spectroscopic data collected using HyloggerTM technology is being used to assess the mineral composition of Archean iron ore bedrock and Cenozoic detrital units in Western Australia’s Pilbara

    Jan 1, 2015