Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Solving a Large Stochastic Integer Programming Model for Production Scheduling at a Gold Mine with Multiple Processing Streams and Uncertain Geology
By M de Freitas Silva
One of the main steps during the decision-making process of long-term mine planning is the definition of the optimal sequence of extraction, which usually is synonymous with maximising the discounted
Nov 24, 2014
-
Optimal Inference of Modelling Parameters to Simulate Complex Trends across Soft Boundaries – A Case Study in Heavy Mineral Sands
By T Wambeke, J Benndorf
A risk-robust development of a heavy mineral resource requires an assessment of the geological uncertainty and spatial variability of the key factors impacting the mining and processing operation. Att
Nov 24, 2014
-
Strategies for Mine Planning and Design
By S Coward, C Xu, P A. Dowd
"This paper provides an assessment of the current challenges in strategic mine planning and design and suggested approaches for addressing them. The specific challenges covered are: realistic quantif
Nov 24, 2014
-
Not for the Faint-Hearted
By J Whittle
This paper describes what is involved in carrying out a comprehensive optimisation of a long-term operating schedule for a mining complex. It details the data that must be assembled and discusses the
Nov 24, 2014
-
Adaptation of an Open Pit Optimiser for Underground Strategic Planning
By M Bloss, B Roberts
BHP Billiton Olympic Dam required a well-tested software product suitable for strategic optimisation and scheduling of options for a potential underground mining project. The company has a standard so
Nov 24, 2014
-
Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contracts
By J Zhang, R Dimitrakopoulos
A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s
Nov 24, 2014
-
Implementing a New Heuristic Approach to the Underground Mine Stope Layout Problem
By M W. A Asad, E Topal, D S. S Sandanayake
Underground mine planning requires an optimal stope layout as a prerequisite for the definition of an optimal production schedule. The procedure to generate an optimal stope layout considers an orebod
Nov 24, 2014
-
Stochastic Optimisation of Mineral Value Chains – Developments and Applications for the Global Optimisation of Mining Complexes with Uncertainty
By R Dimitrakopoulos, R Goodfellow
One of the primary objectives when optimising a mining complex is to maximise its value for the primary stakeholders. In order to achieve this objective, it is necessary to holistically optimise all a
Nov 24, 2014
-
Assessing Uncertainty with Drill Hole Spacing Studies – Applications to Mineral Resources
By H M. Parker, G Verly, T Postolski
Assessing the uncertainty and risk in mineral resource estimation is required for best practice and is implied by the public reporting codes in the categorisation of mineral resources and reserves. On
Nov 24, 2014
-
Consideration for Multiobjective Metaheuristic Optimisation of Large Iron Ore and Coal Supply Chains, from Resource to Market
By J Balzary, A Mohais
Dynamic market and operating conditions, coupled with an environment in which multiple objectives and trade-offs are common, pose major challenges for planners and schedulers working in any mining ent
Nov 24, 2014
-
An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations
By S Q. Liu, E Kozan
This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is
Nov 24, 2014
-
Joint Simulation of Correlated Variables Using High-order Spatial Statistics for Orebody Modelling
By R Dimitrakopoulos, I Minniakhmetov
Geostatistical simulation techniques are used to quantify uncertainty of spatial attributes of interest describing mineral deposits, petroleum reservoirs, hydrogeological horizons, environmental conta
Nov 24, 2014
-
Ore Selection Optimisation for an Iron Ore Deposit Using Linear Programming
By M Aros, L Reilly
Iron ore is normally sold in bulk at certain specifications. These include iron grade and specific contaminant grades, typically silica, alumina, phosphorous and sulfur. These target grades are normal
Nov 24, 2014
-
Comparison between Gaussian Processes and Dynamic Time Warping for Classification of Marker Shales in Iron Ore Deposits
By A Melkumyan, K Silversides
The banded iron formation-hosted iron ore deposits located in the Hamersley Ranges of Western Australia contain marker shales that are used to distinguish lithology for geological and orebody mapping.
Nov 24, 2014
-
Sensor-based Real-time Resource Model Reconciliation for Improved Mine Production Control – A Conceptual Framework
By M W. N Buxton, M S. Shishvan, J Benndorf
The flow of information, and consequently the decision-making along the chain of mining from exploration to beneficiation, typically occurs in a discontinuous fashion over long timespans. In addition,
Nov 24, 2014
-
Enhancing Risk Management in Strategic Mine Planning through Uncertainty Analysis
By C Fricke, R Wood, P Velletri
"In a climate characterised by an ever increasing focus on cost reduction and maximising the utilisation of existing assets and infrastructure, understanding the uncertainty associated with alternativ
Nov 24, 2014
-
Parallel Implementation of a Tabu Search Procedure for Stochastic Mine Scheduling
By R Dimitrakopoulos, R Senécal
This paper presents a metaheuristic solution to the optimisation of open pit long-term production scheduling with a stockpile and geological uncertainty. The optimisation formulation is a two-stage st
Nov 24, 2014
-
A Stochastic Optimisation Formulation for the Transition from Open Pit to Underground Mining within the Context of a Mining Complex
By J MacNeil, R Dimitrakopoulos
As open pit mining of a deposit deepens, the cost of extraction may increase up to a threshold where transitioning to mining through underground methods is more profitable. This paper provides an appr
Nov 24, 2014
-
Open Pit Transition Depth Determination through Global Analysis of Open Pit and Underground Mine Production Scheduling
By K Dagdelen, I Traore
This paper presents an iterative net present value (NPV) maximisation method to determine the optimum surface to underground transition depth for an orebody to be mined by multiple open pits and an un
Nov 24, 2014
-
Cut-off Grade-based Sublevel Stope Mine Optimisation – Introduction and Evaluation of an Optimisation Approach and Method for Grade Risk Quantification
By M W. N Buxton, M T. Bootsma, J Benndorf, C Alford
Research in the field of cut-off grade optimisation has shown a relationship between cut-off grade, project life and net present value (NPV). Lane’s theory demonstrates that cut-off grades can be opti
Nov 24, 2014