Search Documents

Sort by

  • IIMP
    Mejora del control de procesos en plantas metalúrgicas mineras de metal base por medio del uso de laboratorios analíticos automatizados

    By Pierre Hofmeyr

    Generalmente las plantas metalúrgicas mineras recolectan compuestas diariamente y las envían a laboratorios off site para su análisis. En ese sentido, el presente texto señala las ventajas de establ

    Oct 1, 2014

  • AUSIMM
    Design and Construction Contract C916 Beauty World Station and Tunnels, Singapore

    By R McDonough

    DTL2 contract C916 was awarded in March 2009 for S$340 M. This contract includes two mass rapid transit (MRT) 1100?m long bored tunnels using two slurry tunnel boring machines (TBMs), with an internal

    Sep 17, 2014

  • AUSIMM
    Comparison of Excavation Methods in Different Ground Conditions with the Decision Aids for Tunnelling

    By F Sandrone, J-P Dudt, J Zhao, E Paltrinieri

    Tunnel boring machines (TBMs) excavation is nowadays more and more considered a valuable alternative to conventional tunnelling. As a matter of fact, thanks to its advantages such as greater rate of a

    Sep 17, 2014

  • AUSIMM
    Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel Segments

    By M Wieloch, D Wimpenny, M Chappell

    Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in

    Sep 17, 2014

  • AUSIMM
    Deformation Mechanisms of the South West Rail Link Underpass beneath the Hume Highway

    By S J. Clarke, C S. Walker

    The South West Rail Link (SWRL) project involved construction of a rail line to service new residential areas in south-west Sydney. The 11 km rail line is conveyed through a short tunnel at shallow de

    Sep 17, 2014

  • AUSIMM
    A Review of the Applications of Tunnel Boring Machines in Mines

    By Q Gong, J Li, J Zhao, Y Zheng

    Excavation by tunnel boring machines (TBMs) offers many advantages over conventional excavation methods, in terms of safety level, working environment, advance rate and overall cost. While TBMs have b

    Sep 17, 2014

  • AUSIMM
    Waterview Connection – Temporary Works for Tunnel Boring Machine?Launching

    By D Kubik, K The

    The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by

    Sep 17, 2014

  • AUSIMM
    Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?Zealand

    By M G. Wansbone, R Bhargava

    The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge

    Sep 17, 2014

  • AUSIMM
    Initial Thoughts on Application of the Volume Loss Approach for Estimates of Surface Settlement Due to Tunnelling in Weathered Rock

    By S Kowalczuk, S V. L Barrett

    The potential for adverse surface settlement during tunnelling in soil and rock poses a significant risk to the successful completion of any tunnelling project. Undesirable ground movement may lead to

    Sep 17, 2014

  • AUSIMM
    Tunnel Boring Machines in Mines – A?Brief Review of Past Use with a Status Report on Use Today in Australia

    By M Rauer

    With a worldwide growing population the demand for higher living standards, food and the development of new technology is rapidly rising. To allow for a continuous growth, larger quantities of mineral

    Sep 17, 2014

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    The Measurement of Rock Stress for Tunnelling

    By I Gray

    While in some cases it is vitally important to measure the virgin stress in rock prior to tunnelling there are a number of cases where such stress measurement is really not required. The concept of ha

    Sep 17, 2014

  • AUSIMM
    The Refurbishment of the Terrace and Mt Victoria Tunnels, Wellington, New Zealand

    By T J. McGavin

    This paper examines the fire life systems implemented in two existing tunnels and discusses whether the standards used were appropriate. It focuses on the Terrace Tunnel as this upgrade and refurbishm

    Sep 17, 2014

  • AUSIMM
    Discrete Fracture Network Modelling for Tunnel Design in the Sydney Basin

    By A L. de Ambrosis, F M. Weir, M Fowler

    Traditional kinematic and statistical analyses of geological structure for geotechnical engineering applications, while considered industry standard practice, have some limitations and unrealistic ass

    Sep 17, 2014

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AUSIMM
    Design of Segmental Lining for Waterview Project, Auckland, New?Zealand

    By S Pradhan, A Kuras, R Mahajan

    This paper describes the design of the precast concrete segmental lining for the 13.1 m internal diameter and 450 mm thick, 2.4 km long mainline tunnels for the Waterview Connection project in Aucklan

    Sep 17, 2014

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    Management of Health and Safety in Tunnelling – Application of Australian Coal Mining Knowledge

    By G Marling, A Calderon, J Harris, P Kirsch, M Shi, D Sprott, A Kirsch

    Large-scale infrastructure construction needs to comprehensively manage risks that can impact the health and well-being of many people, from workers (temporary, contracted or full time), to families a

    Sep 17, 2014

  • AUSIMM
    An Alternative Approach for Assessing In Situ Stresses in Sydney

    By D A. F Oliveira, C J. Parker

    The role of the virgin in situ stress field in tunnelling projects is well known in the Sydney area. The effect of in situ stresses is mostly considered through the use of published relationships that

    Sep 17, 2014

  • AUSIMM
    Safety in Underground Railway Stations – An Example of the Interplay between Testing and 3D Computational Fluid Dynamics Simulation

    By R Stosch, D Lohberger, J Rodler, E Schnell and A Bassler, H Ramseier

    In the last two decades three-dimensional (3D) computational fluid dynamics (CFD) simulations have become an important tool in engineering sciences. More recently, the safety requirements in undergrou

    Sep 17, 2014