Search Documents

Sort by

  • AUSIMM
    A More Holistic View of Mill Liner Management

    By N Weerasekara, M Bird, M Yahyaei, M M. Hilden, M S. Powell, J Franke, P Toor

    The combination of new tools with a more rigorous approach to understanding the interaction of mill liners with overall mill performance and economics, forms the basis of an integrated approach to lin

    Oct 29, 2012

  • AUSIMM
    Commissioning of the Kanmantoo Copper Concentrator

    By J Seppelt

    The Kanmantoo Copper Project is owned and operated by Hillgrove Resources Limited and is situated in the Adelaide Hills region in South Australia. Mining in the area has taken place off and on over th

    Oct 29, 2012

  • AUSIMM
    Conducting High Chrome Grinding Media Trials at NewcrestÆs Ridgeway Concentrator

    By C J. Greet, J Kinal, C Hitchen

    Following the successful completion of a marked ball test defining the potential wear benefits the high chrome alloys may offer against forged steel, as well as laboratory test work investigating chan

    Oct 29, 2012

  • AUSIMM
    Determining Mill Operational Efficiencies using Non-Contact Acoustic Emissions from MicrophoneáArrays

    By R A. Pax

    Operational grinding mills emit significant acoustic emissions which are a consequence of the dynamic environment prevailing inside them. From a technical perspective, the noise presents an opportunit

    Oct 29, 2012

  • IIMP
    Expansión de la producción de 10 k a 15 k tpd en unidad minera Cerro Lindo – Milpo

    By Edward Medina Bárcena

    El proyecto minero Cerro Lindo, luego de haber aprobado los estudios de factibilidad técnica-económica, inicia su fase de construcción en el 2006 y culmina en el 2007. En ese sentido, el presente te

    Oct 1, 2012

  • IIMP
    Comparación entre EIA y ESHIA para la evaluación de proyectos mineros

    By R. E. Mitchell

    Los proyectos mineros son revisados por medio de dos estudios: el primero es el Estudio de Impacto Ambiental (EIA) que evalúa proyectos mineros e industriales propuestos para obtener una programación

    Oct 1, 2012

  • IIMP
    Regulación de carga fresca en molinos de bolas empleando un controlador de lógica difusa

    By Reynaldo Mayorca Castillo

    En el proceso de molienda, la operación de planta presenta cambios en la mineralogía. Dichos cambios generan incremento en la densidad de la pulpa. Por ello, el presente texto señala el control de est

    Oct 1, 2012

  • AUSIMM
    Automated Multi-Drills in Rio Tinto

    By C McHugh, F Oppolzer, B Rogers, A Stokes

    Rio Tinto has embarked on a journey to use automation to improve the performance of its surface mines. The driver for automation has more to do with improving the accuracy and consistency of mining pr

    Sep 18, 2012

  • AUSIMM
    The Contribution of Air-Deck Blasting to Open Pit Mining Economics

    By T Laing, M A. Abdalla, P Hagan

    Open pit operators are facing a number of challenges in the area of blasting and blasting processes, such as wall control, quality of fragmentation, explosives consumption and vibration. Remaining fin

    Sep 18, 2012

  • AUSIMM
    The Importance of Collaboration between Designers and Contractors in Implementing a Design in Challenging Conditions

    By V Gumba, S Narendranathan, C Barker, R D. H Thomas, G P. Bungard

    This paper presents the positive outcomes on an EPCM project, which was undertaken in a challenging environment, whereby the design team had to generate a design with a number of stringent serviceabil

    Sep 18, 2012

  • AUSIMM
    The Introduction of Axis at Black Star Open Cut

    By M Gabbitus, B Young, T Lukins, M Slater

    This paper details the implementation of a new type of grade control system at the Black Star open cut mine in Mount Isa, Queensland. It explores the site requirements for grade control, what as previ

    Sep 18, 2012

  • AUSIMM
    The Path to Best Practice at Geita Gold Mine

    By M Monaghan, B S. Gregory

    The Geita Gold Mine is located 80 km southwest of the town of Mwanza in the north-west of Tanzania and is 100 per cent owned by AngloGold Ashanti Limited. Open pit mining commenced at Geita in 2000. I

    Sep 18, 2012

  • AUSIMM
    Eliminating Unidentified Misfires at Xstrata ZincÆs Open Pits Through the Application of Electronic Detonators

    By R Small, S Combrinck, R Lindsay

    Maintaining your competitive edge in the growing Australian mining sector today is an arduous task. With an ever increasing demand to extract more ore, safely, complete visibility throughout the blast

    Sep 18, 2012

  • AUSIMM
    Mary Mac Hill - The Challenges and Strategies of Successful Open Cut Mining: A Complex Underground Gold Deposit Riddled with a Network of Complicated Voids

    By H Chalcraft, T D. Mullen

    Conditions encountered at a recently completed brownfields mining project provided valuable insight into, and development of, techniques for working in and around known underground mining voids in an

    Sep 18, 2012

  • AUSIMM
    Change Challenges for Large Open Pit Mines

    By R Durchholz, A-J Heiertz, R Schmitz

    Mining of lignite is the largest bulk materials handling activity in Europe. In order to mine this lignite, with an average calorific value of only a third of bituminous coal in an economical way, hig

    Sep 18, 2012

  • AUSIMM
    Reversing the Trend in Open Pit Mining Equipment Output

    By T Trott, M Lewis, G Lumley

    The analysis of equipment trends in The AusIMMÆs revision of Monograph 19 - Australasian Mining and Metallurgical Operating Practices (AMMOP) (in prep) in the paper by Graham Lumley raised some intere

    Sep 18, 2012

  • AUSIMM
    Raising the Simulator Training Bar - Strategies for Improved Work Performance and Effective Utilisation of Site-Based Simulators

    By P Wood, S Leveritt

    This paper will introduce some innovative strategies for simulator training that are intended to improve the level of safety and operational performance of heavy equipment operators. The key strategy

    Sep 18, 2012

  • AUSIMM
    Risk-Cost-Benefit Analysis of Early Warning Technologies Impact for Wall Failure Risk Management in Surface Mines

    By J Joy, A Bye, G V. Kizil

    This paper presents an application of the newly developed risk-cost-benefit (RCB) framework to support risk management decisions for the selection of wall monitoring technologies at an open cut mine s

    Sep 18, 2012

  • AUSIMM
    RISKGATE« - A Case Study in Application to Fires on Mobile Plant

    By J Harris, P Kirsch, D Cliff, M Spinks, S Goater, D Sprott

    Fires are a common and recurrent unwanted event in the operation of open pit mines. In most cases, the causes of events such as fires are already æknownÆ but are either overlooked or not fully address

    Sep 18, 2012

  • AUSIMM
    Rotary Drilling Automation Increasing Operator Productivity and Drilling Quality

    By L Eriksson, D Penn, J Appelgren

    Atlas Copco, a leading supplier of equipment and services to the mining and construction industries, is consistently pursuing its strategy to offer the most productive and economical solutions by cont

    Sep 18, 2012