Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Brisbane Airport Link Earth Pressure Balance Machine Two Component Tailskin Grouting – A New Australian Record
By A Reschke
The Thiess John Holland Group is undertaking the design and construction of Brisbane’s Airport Link Project, the largest single investment in transportation infrastructure in Australian history. Twin
Mar 8, 2011
-
Western Ring Route – Waterview Connection Driven Tunnel: Assessment of Groundwater Effects
By S France
The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will comprise 2.5 km of ‘undrained’ driven tunnels and 900 m of drained cut-an
Mar 8, 2011
-
Site Investigation and Design for Melbourne’s New Metro
By H Asche
The Melbourne Metro project has evolved from the Victorian Transport Plan. MM1 is the second major phase of the proposed separation of Melbourne’s radial railway system, creating a line that will oper
Mar 8, 2011
-
Thermal Modelling and Mitigation Measures for the Bogong Power Development
By D Wimpenny
The Bogong Power Development Project in Victoria, Australia involved the construction of a 15 m long mass concrete plug up to 9 m in diameter within the head race tunnel. The plug is critical to thepe
Mar 8, 2011
-
State-of-the-Art in Tunnel Ventilation Systems Design – Applicable Options to Meet Fire-Life-Safety Code Requirements
By P C. Miclea
Transportation networks extend every day around the world, requiring safe and well-maintained structures for efficiency and for users’ safety. Due to specific features of the infrastructure, such as l
Mar 8, 2011
-
A Review of Prediction Methods for Ground-Borne Noise Due to Tunnel Construction Activities
By D Davis
The prediction of ground-borne noise levels from tunnel construction activities requires knowledge of the input vibration forces from the vibration source(s) into the cutting face, knowledge of the vi
Mar 8, 2011
-
A Large-Scale Unconfined Compressive Strength Test for Determination of Rock Mass Parameters in Tunnel Design
By A Smith
Rock masses usually exhibit scale dependent mechanical properties primarily due to presence of discontinuities and their inhomogeneous nature. One of the essential preconditions for selection of appro
Mar 8, 2011
-
A Cost Comparison between Empirical and Engineered Support and Reinforcement Designs for Tunnels in a Low Stress Environment
By L Nienaber
Mines, after becoming operational, often retain the same support and reinforcement designs developed in the feasibility study. These designs are conceived from limited drilling data and regional exper
Mar 8, 2011
-
Performance of a Drainage Tunnel and Subvertical Drain System
By J Y. C Lo
The construction of two drainage tunnels and the associated subvertical drain system at the Po Shan area in Hong Kong was completed in December 2009. This project is the first of its kind to utilise d
Mar 8, 2011
-
Construction of Access Shafts for Tunnels and Deep Pipelines in Urban New Zealand
By N Wharmby
In recent years in New Zealand there have been a number of tunnelling and deep directionally drilled pipelines projects that have required access shafts. Often these shafts are in urban environmentswh
Mar 8, 2011
-
Express Rail Link – Challenges of Tunnelling Through Hong Kong and into Mainland China
By A Morris
The Express Rail Link (XRL) will provide high-speed rail services from Hong Kong to Guangzhou and a connection to the national high-speed passenger rail network serving major cities throughout Mainlan
Mar 8, 2011
-
Design and Specification of Permanent Shotcrete Tunnel Linings
By D Mather
Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a
Mar 8, 2011
-
Design for Tunnel Fire Life Safety – Working Together in the New Zealand Context
By E Claridge
There are a number of major infrastructure tunnelling projects currently underway or proposed in New Zealand, including construction of new road and rail facilities and the refurbishment of existing r
Mar 8, 2011
-
Investigations for Proposed Upgrade of the Homer Tunnel, New Zealand
By A D. Campbell
The Homer Tunnel is located in a remote area of the South Island of New Zealand and carries large numbers of tourists to Milford Sound through an avalanche prone area. The tunnel is 1280 m long with a
Mar 8, 2011
-
Analysis of Twin Road Tunnels Using Numerical Modelling Techniques
By D R. Wines
The design of near-surface civil infrastructure requires detailed consideration of the geological/ geotechnical conditions, excavation geometry and sequence and ground support measures to ensure stabi
Mar 8, 2011
-
A Simplified Creep Analysis for Low Strength Seams in Rock Pillars
By M Habte
This paper presents a simplified method for the assessment of creep deformations in rock masses containing bands of low strength or soil strength rock. The main impetus for this work was the need to a
Mar 8, 2011
-
Advancing Cut and Cover Tunnelling in Auckland – Experience Gained from New Lynn Rail Trench
By M McDonald
KiwiRail has a goal of significantly improving passenger rail services to west Auckland, as part of its DART (Developing Auckland’s Rail Transport) suite of projects. The New Lynn Rail Trench (NLRT) p
Mar 8, 2011
-
Application of Ground Penetrating Radar to Testing Tunnel Integrity
By J Karlovšek
Civil engineering infrastructures are often subjected to different types of natural and mechanical activities. These influences may result in serviceability or even in stability of structures due to m
Mar 8, 2011
-
Breadth and Depth – Ground Breaking Shafts for Melbourne Sewer Projects
By N Lewis
Recent major urban trunk sewer infrastructure projects in Melbourne have involved construction of nearly 10 km of tunnel boring machine (TBM) driven tunnels in a range of geological conditions varying
Mar 8, 2011
-
Ambuklao Tunnel Plug Construction
By B Hayes
The Ambuklao and Binga Rehabilitation Project is a 175 MW hydro power project currently under construction across dual sites in the north region of Luzon Island, Philippines. When it was built in 1956
Mar 8, 2011