Search Documents

Sort by

  • AUSIMM
    Analytical Approach for Stability Analysis of Rock Wedges with Soil-Infilled Joints Formed in a Tunnel Roo

    By D Oliveira

    The use of an equivalent continuum for a rock mass is not always suitable for situations where the failure is structurally controlled by discontinuities as in the case of wedges in the tunnel roof. In

    Mar 8, 2011

  • AUSIMM
    Conservation of Effective Efflux Velocity from a Road Tunnel Ventilation Outlet by Varying the Effective Cross-Sectional Area

    By A Bagis

    Road tunnels are an accepted and effective transportation solution in urban areas to mitigate increasing traffic congestion and facilitate improved urban connectivity in a cost effective manner while

    Mar 8, 2011

  • AUSIMM
    Cable Tunnel Ventilation

    By P Ridley

    EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil

    Mar 8, 2011

  • AUSIMM
    Baseline Ground Settlement and Groundwater Monitoring for Tunnelling – A Case Study in Melbourne

    By I Lamb

    Past experience of ground settlement and groundwater monitoring for tunnelling projects in Melbourne has provided an appreciation of the value and importance to owners of establishing a broad baseline

    Mar 8, 2011

  • AUSIMM
    Clem Jones Tunnel – A Study of the use of Precast Concrete for Quick and Efficient Construction

    By M Hawkins

    The Clem Jones Tunnel (formally known as the North-South Bypass Tunnel), a A$2.88 billion road tunnel project in Brisbane, Queensland, was successfully completed almost seven months ahead of schedule.

    Mar 8, 2011

  • AUSIMM
    Considerations and Challenges in the Design and Construction of Tunnels for Remote Hydropower Projects

    By A G. Noble

    Tunnelling for hydro-electric power projects can be a very challenging component of the overall development. In contrast to urban transportation tunnelling where the logistics for access and supply of

    Mar 8, 2011

  • AUSIMM
    An Investigation into the Effectiveness of Under Platform Exhaust Systems Based on Measurements from the Copenhagen Metro

    By S Ravn

    Under platform exhaust (UPE) systems are often designed into metro stations as a means of removing heat generated by trains as they come to a halt in the platform. These systems are designed to extrac

    Mar 8, 2011

  • AUSIMM
    Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney

    By Q Yang

    This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn

    Mar 8, 2011

  • AUSIMM
    Preliminary Design for the Rockwater Power Project, South Island, New Zealand

    By H Asche

    The proposed Rockwater Power Project is a hydropower development on the Waitaki River in the South Island of New Zealand. The proposed development will have an installed capacity of 250 MW with a peak

    Mar 8, 2011

  • AUSIMM
    Concept Design of the Central Business District Rail Link, Auckland

    By J Q. Cooper

    The New Zealand rail authority, Kiwi Rail and Auckland Regional Transport Authority (ARTA), are jointly planning a new mainline rail link between Auckland’s downtown Britomart Station and the existing

    Mar 8, 2011

  • AUSIMM
    Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft Clay

    By R Ayothiraman

    Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e

    Mar 8, 2011

  • AUSIMM
    Possible Improvements to Current Design Practices in Fire Safety Design for Road Tunnels

    By R Lau

    The fire safety design for road tunnels includes the following aspects: active systems, passive provisions and operational procedures. The active systems include the smoke control system, fire suppres

    Mar 8, 2011

  • AUSIMM
    Reinstating a One Hundred Year Old Tunnel in the Southern Alps Through Highly Fractured Schist for Hydro Generation

    By R Shelton

    The Big Wainihinihi River and tunnel are located on the western side of the Southern Alps of New Zealand within the active Alpine Fault zone, which marks the boundary between the Pacific and Australia

    Mar 8, 2011

  • AUSIMM
    Durability Planning for Underground Infrastructure

    By D Wimpenny

    Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur

    Mar 8, 2011

  • AUSIMM
    Fire Suppression Systems – Protection for People, Concrete or Profits

    By A Dix

    Fire suppression systems are but one of the many technologies currently available to manage operational tunnel risks. However, the actual reasons for their use are often shrouded in mischievous discus

    Mar 8, 2011

  • AUSIMM
    Open Issues in Tunnel Boring Machine Excavation of Deep Tunnels

    By G Barla

    In Europe, a major interest in the infrastructure and tunnelling fields is in the new crossings of Alps in the form of base tunnels, which are important components of the high-speed (for passengers)/h

    Mar 8, 2011

  • AUSIMM
    Marine Recovery of Tunnel Boring Machine from Botany Bay

    By S Norman

    The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (

    Mar 8, 2011

  • AUSIMM
    Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

    By A Purwodihardjo

    Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t

    Mar 8, 2011

  • AUSIMM
    Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra Delta

    By P Clark

    This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project

    Mar 8, 2011

  • AUSIMM
    Elastomeric Segment Gaskets – State-of-the-Art and Future Developments

    By H Höft

    Today tunnel segment liners are sealed with corner-vulcanised gaskets made of extruded elastomeric compression profiles. The profile geometries and the elastomeric materials have been further develope

    Mar 8, 2011