Search Documents

Sort by

  • TMS
    Utilization of Brazilian Waste Mica in Preparation of Pigments

    By Shirleny Fontes Santos

    Muscovite mica crystals lower than 15 mm diameter are discarded as waste in the mining area of Borborema-Seridó (BRAZIL). The objective of this work was the ore dressing and purification of this waste

    Jan 1, 2010

  • SAIMM
    Application of the Palla? vibrating mill in ultra fine grinding circuits - Synopsis

    By K. Andres

    This paper presents the vibrating mill technology and summarizes the grinding principle of ultra fine grinding. In addition, a variety of operations is described and the benefits of these different op

    Jan 1, 2010

  • SME-ICGCM
    Design Optimization of Longwall Chain Pillars

    By Behdeen Oraee, Amirhossein Bangian, Kazem Oraee

    "Determination of the optimum design of chain pillars has a significant effect on the economics and safety of longwall operations. Most pillar design formulae are based on empirical methods and supple

    Jan 1, 2010

  • SME
    Use Of The New Mexico Mines Database And Arcmap In Uranium Reclamation Studies

    By V. T. McLemore

    NMBGMR has been collecting data on uranium mining districts, mines and mills since it was created in 1927 and has converted years of historical data into a relational database that can be imported in

    Jan 1, 2010

  • SAIMM
    How Electronics Can Release the Imagination

    By G. V. R. Landman

    It is self-evident that economic pressure demands that today?s mines stay ahead and stay competitive. The challenge, however, isto find fresh approaches to the pursuit of efficiency and operational ef

    Jan 1, 2010

  • ISEE
    Determination of the Dynamic Uniaxial Tensile Strength of Laurentian Granite Using an Explosivesly-Impacted Hopkinson Pressure Bar

    By P D. Katsabanis

    The dynamic tensile strength of geomaterials is known to be highly dependent on the strain rate of the load applied. This is significant in applications where the material is subjected to shock waves

    Jan 1, 2010

  • DFI
    Rehabilitation Of Tilted Large Drainage Caisson ? Synopsis

    By M. A. El-Sohby

    The paper describes some problems encountered with the foundation of a deep drainage caisson constructed on the Nile Bank in Cairo. The use of suction dredging while sinking the caisson led to a pipin

    Jan 1, 2010

  • TMS
    Influence of Direct Aged Treatment on Creep Behaviors of Hot Continuous Rolling GH4169 Superalloy

    By Tian Sugui

    By direct aging treated, creep properties measurement and microstructure observation, the influences of the direct aging treatment on the creep behaviors of Hot Continuous Rolled GH4169 superalloy are

    Jan 1, 2010

  • SME
    The History And Future Of Highwall Mining

    By P. -J. Kleiterp

    Highwall mining is a mining method to extract coal from a final boundary in open cut mining, trench mining or contour mining. This boundary may have been reached because of economic constraints (econo

    Jan 1, 2010

  • NIOSH
    RI 9513 - Characterization and Recovery of Mercury From Electrical Manufacturing Wastes by Thermal Desorption

    By H. H. Dewing

    The U.S. Bureau of Mines characterized Hg-containing wastes and used a thermal-desorption process to remove and recover the contained Hg. The wastes were generated by an electrical-parts plant engaged

    Jan 1, 2010

  • SME
    Evaluation Of Physical And Mechanical Properties Of Coal Using Ultrasonic Measure Technique And Numerical Simulation

    By D. Antonov

    The physical and mechanical properties of coal play a important role in the planing and design of coal mines. However, due to the complexity conditions in situ and the influence of unknown factors, it

    Jan 1, 2010

  • TMS
    A Collaborative Tool for Waste Management in the Industry

    By M. S. Borges

    The need for the waste management industry to reach environmental patterns, technological innovation, and a technological demand of the productive sector is covered by this study. The environmental ca

    Jan 1, 2010

  • DFI
    Engineering Practice Of Ground Improvement ? Introduction

    By H. R. Taber

    The extensive subject area "Engineering Practice of Ground Improvement" will be treated within the limitations of space and the writer on the basis of personal practice and experience?largely in North

    Jan 1, 2010

  • ISEE
    Demolition Blast of Heavily Reinforced Concrete Slab on Impermeable Layer

    By Ye Yuan, Jaak Daemen, Shaguo Yuan

    ABSTRACT: A 400m2 (480 yd2) heavily reinforced high-strength concrete slab 800mm (31 inch) thick had to be demolished. Underneath it was a 300mm (12 inch) thick underlying structure consisting of thre

    Jan 1, 2010

  • DFI
    North American Geotechnical Exploration Practice ? Synopsis

    By C. O. Riggs

    Geotechnical exploration in North America, in particular, exploration for deep foundations analyses, is currently and generally performed following the most basic sampling and insitu testing methods a

    Jan 1, 2010

  • TMS
    Arsenic Dopant Effect in Nickel Silicide Formation for NiSi/Hf-based/Si Gate Stacks

    By S. Y. Tan

    The thermal stability of fully silicided NiSi with arsenic doping on silicon was investigated. The aims of the work were to investigate the Ni silicide phase-related issues associated with arsenic dop

    Jan 1, 2010

  • SME-ICGCM
    AMCMRR- An Analytical Model for Coal Mine Roof Reinforcement

    By Mark G. Colwell, Russell Frith

    "An Analytical Model for Coal Mine Roof Reinforcement (AMCMRR) has been developed. AMCMRR utilizes a Factor of Safety (FOS) approach, which is commonly used in all forms of engineering. The starting p

    Jan 1, 2010

  • NIOSH
    RI 9547 - Bending Fatigue Tests on Flattened Strand Wire Rope at High Working Loads

    By Richard C. Wang

    The U.S. Bureau of Mines established a wire rope research laboratory to examine the factors that affect the safety and the useful life of wire rope. In the most recent work, two 32-mm 6x27H flattened

    Jan 1, 2010

  • CIM
    Process Diagnosis using Quantitative Mineralogy

    By Lori Kormos, Jhonny Carrión De la Cruz, Dominic Fragomeni, Elizabeth Whiteman, Jorge Oliveira

    "Process diagnosis, flowsheet design and optimisation are most effectively and efficiently achieved through the use of metallurgical testwork combined with more modern quantitative mineralogical techn

    Jan 1, 2010

  • ISEE
    Planning to Demonstrate Why High PPVs Work for Close-In Blasting

    By Chris Breeds, Larry Leone, Jerry Wallace

    Project Owners typically require General and Detailed Blast Plans when blasting close to important structures and specify the maximum allowable peak particle velocity for each potentially affected str

    Jan 1, 2010