Search Documents

Sort by

  • SAIMM
    MECS Catalyst Products & Technical Services Update (1a12db17-a10b-4c84-8df1-f53ba1eeb845)

    By Chris D. Winkler

    Vanadium-based sulphuric acid catalyst has been utilized to oxidize SO2 to SO3 since the early 1900?s. This versatile product displaced the expensive and easily-poisoned platinum-based catalyst in ne

    Jan 1, 2009

  • SME
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SAIMM
    Validating the design of blending piles through a real case study

    By L. A. Abichequer

    ROM grade variability is one of the most important factors influencing plant product recovery. Due to the influence of grade variability on mine profits, it is deemed important to guarantee a proper h

    Jan 1, 2009

  • SME-ICGCM
    Coal Bumps And Odd Dynamic Phenomena - A Numerical Investigation (70cea8ce-38a7-4c88-a596-77cf801d31b0)

    By Jeffrey K. Whyatt

    The Crandall Canyon accident investigation included an interesting and unexplained observation by rescuers that the ?barrier rib had shifted northward as a unit, as much as 10 feet.? This is not the

    Jan 1, 2009

  • ISEE
    Thermodynamic Work Principal Overture — Not Just Rock n’Roll

    By Michael Wieland

    The resolving capacity of the thermodynamic work-principal model has been seriously refined over its twelve year history, so a review of the innovations, wrong turns and their rectification is warrant

    Jan 1, 2009

  • ISEE
    Investigations of Shock Tunnel Dynamics and Energy Realization (a197a97d-a574-4dd6-b892-bc2dba4e791b)

    By Joshua Hoffman, Braden Lusk, Kyle Perry

    This study explores how different geometries affect the shock tunnel’s performance and is broken down into three phases. Phase 1: Open arena testing in which theoretical energies produced by the deton

    Jan 1, 2009

  • SME
    Determination Of The Leaching Parameters For A Refractory Gold Ore Containing Aurostibite And Antimony Minerals: Part II ? AD Zone

    By G. Deschênes

    Following a successful investigation on the Central Zone sample, a cyanidation study was conducted on an ore sample from the AD-MW Zone of Clarence Stream Property, owned by Freewest Resources Canada,

    Jan 1, 2009

  • SAIMM
    Twin Process Filtration

    [ ]

    Jan 1, 2009

  • SME
    Improving Empire?s Grinding Circuit Performance Using Six Sigma - Preprint 09-059

    By H. Walqui

    The Empire concentrator was built in four stages, with the latest stage accounting for 50% of the overall plant capacity. Over the past 5 years, the average throughput of the three grinding lines has

    Jan 1, 2009

  • SAIMM
    Evaluation of the sampling strategy for a copper ore

    By P. Gonzalez

    Minera La Parreña, S.A. de C.V., Milpillas operation is an underground mine designed to process 8 352 tons of ore per day for the recovery of copper through crushing, heap leaching, solvent extraction

    Jan 1, 2009

  • AUSIMM
    In-Pit Crushing and Conveying

    By I Lourel

    In evaluating the installation of an in-pit crushing and conveying (IPCC) system for any mine, a number of options are available for each of the dig side, transport and dump side operations. Some of t

    Jan 1, 2009

  • SAIMM
    A comparison between the duplicate series method and the heterogeneity test as methods for calculating Gy?s sampling constants, K and alpha

    The compilation of the sampling nomogram is an essential tool in the optimization of a sampling protocol and allows the operator to track the change in relative variance of the sampling error (the Fun

    Jan 1, 2009

  • AUSIMM
    Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study

    By P Crittenden

    Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant

    Jan 1, 2009

  • SME
    2009 Permeation Test Results For Grouts Made With Ultrafine Cements

    By Raymond W. Henn

    The 30th annual short course ?Grouting Fundamentals and Current Practice? was held at the Colorado School of Mines, June 22-26, 2009. The field demonstration portion of the course was conducted June 2

    Jan 1, 2009

  • AUSIMM
    Predicting Iron Ore Losses and Dilution Factors Using Conditional Simulations

    By D Roldpo, M Vidigal, J F. C L Costa

    The local cumulative distribution function (lcdf) of a selective mine unit (SMU) can be estimated by conditional simulations using the statistics derived from the sample points, generating multiple eq

    Jan 1, 2009

  • DFI
    Interaction Between New Drilled Shafts And Existing Timber Piles At Holland Tunnel Approach

    By Aly M. Mohammad

    The 12th and 14th Street Viaducts, which carry Route 139, are located west of the Holland Tunnel in Jersey City, New Jersey. The two viaducts, provide access to and from the Holland Tunnel (which con

    Jan 1, 2009

  • SME
    Travelling In Brazil ? Preprint 09-123

    By F. Habashi

    Brazil is a major mineral and metal producer, has magnificent fauna and flora, and superb architecture. In 1693 gold was discovered in Ouro Preto and Brazil produced about half of the world's gol

    Jan 1, 2009

  • CIM
    Grinding Circuit Improvements at Barrick Cortez Gold Mine

    By James R. Wickens, David La Rosa, Robert E. McIvor, Adrian Dance

    "The comminution circuit at Barrick Cortez Gold Mine uses an open circuit primary jaw crusher followed by a standard SABC grinding circuit. The grinding circuit incorporates a 26’Ø x 11’ SAG mill, an

    Jan 1, 2009

  • SME
    In-Mine Study Of High-Expansion Firefighting Foam - Preprint 09-095

    By L. L. Chasko

    A mine fire is one of the most challenging safety issues facing a mine operator and can occur at any location underground. The National Institute for Occupational Safety and Health (NIOSH) and the Tw

    Jan 1, 2009

  • TMS
    Vibratory Stress Relief in D-406 Aerospace Alloy

    By M. Bilal Khan

    Thermal stress relief by means of a typical heat treatment cycle (660oC for one hr) is compared with the one achieved through vibratory stress relief at resonant and multiple resonant frequencies for

    Jan 1, 2009